Loading...
HomeMy WebLinkAbout~Master - Resolution approving amendments to Master Professional Services Agreement with Bolton & Menk, Inc., of Ames, IA, for 2026/27 Airport Airside Improvements Project (Reconstruction of Runway 01/19)RESOLUTION NO. 26-632 RESOLUTION APPROVING AMENDMENTS TO MASTER PROFESSIONAL SERVICES AGREEMENT WITH BOLTON & MENK, INC., OF AMES, IA, FOR 2026/27 AIRPORT AIRSIDE IMPROVEMENTS PROJECT (RECONSTRUCTION OF RUNWAY 01/19) FOR THE CITY OF AMES, IOWA WHEREAS, the City has a Master Agreement with Bolton & Menk, Inc., of Ames, IA, for engineering services at the James Herman Banning Ames Municipal Airport. Recent work has included the design, final plans, and bidding for the Reconstruction of Runway 01/19. With design complete and construction about to begin, two amendments to the Master Agreement are needed for the construction phase engineering services; and, WHEREAS, the amendments are described as follows: • Amendment No. 1 – AGIS Design Survey ($114,200, lump sum): In May 2025, the Federal Aviation Administration (FAA) issued Engineering Policy 25-01, which updated its requirements for the Airports Geographic Information Systems (AGIS) survey program. Also, the Airport’s approach category is changing from “B” to “C” because of the higher approach speeds of aircraft already using the Airport. To meet the design standards for those aircraft, the Runway 01/19 profile must be flattened. Together, these changes require an AGIS design survey, which the FAA uses to develop or amend instrument flight procedures. The work includes geodetic control, aerial photography, an aeronautical survey of the runway and navigational aids, and FAA-compliant mapping and data submittals. It is scheduled for September 2026 through March 2027. • Amendment No. 2 – Construction Phase Services ($2,098,400): This amendment provides the engineering services needed for the Reconstruction of Runway 01/19, project inspection and closeout. Construction observation includes a full-time Resident Project Representative (up to 3,894 hours), a second observer during critical operations (up to 2,130 hours), and up to 100 field visits by the project manager; and, WHEREAS, the two amendments total $2,212,600. Both are eligible for FAA reimbursement of up to 95%. The estimated local share is $110,630 ($5,710 for Amendment No. 1 and $104,920 for Amendment No. 2). The approved project budget included an estimated $2,650,000 for these services. The two amendments come in $437,400 under that estimate, and the required local share is covered by the local funding already identified for the project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, Amendment No. 1, for the AGIS Design Survey in the lump sum amount of $114,200, and Amendment No. 2, for Construction Phase Services in an amount not to exceed $2,098,400, to the Master Agreement with Bolton & Menk, Inc., of Ames, IA, for the 2026/27 Airport Airside Improvements Project (Reconstruction of Runway 01/19) are hereby approved. ADOPTED THIS 13th day of October, 2026. _______________________________ _________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Gartin Seconded by: Beatty-Hansen Voting aye: Beatty-Hansen, Betcher, Gartin, Junck, Rollins Voting nay: None Absent: Corrieri Resolution declared adopted and signed by the Mayor this 13th day of October, 2026.