HomeMy WebLinkAbout~Master - September 2026 Monthly Project HighlightsContact the City Manager's Office at 515-239-5101
515 Clark Avenue, Ames, IA 50010
Report compiled by
Allie Warrenburg, Principal Clerk
City Manager's Office
SEPTEMBER 2026
MONTHLY PROJECTHIGHLIGHTS
LIBRARY
Great Reads from Great Places: Jill Esbaum,
author of Iowa’s 2026 Great Reads from Great
Places selection for children, visited Ames for a
special event on a rainy Saturday in September.
Despite the drizzle, families enjoyed trucks,
tractors, and a petting zoo in front of the Library, and
more fun activities inside! Jill Esbaum talked about
her book, “It’s Corn Picking Time,” and signed
copies. Free copies were provided to 50 participants
thanks to a generous donation from Chevron.
Next month, we will hear from Denise Williams,
author of Iowa’s 2026 Great Reads from Great
Places selection for adults. Mark your calendar for
an evening with Denise Williams Tuesday, October
13, at 6:30 p.m.
Opioid Overdose Education: On Saturday, October 17, Community and Family
Resources will present Opioid Overdose Education & Narcan Training at the Library from
9:30-11 a.m. Participants can learn signs and symptoms of an opioid overdose, the
science behind Narcan, and how to administer Narcan. A free box of Narcan will be
available for each participant. (Register in advance to guarantee receiving yours at the
event.)
2
Voting Assistance: Ames Public Library celebrated National Voter Registration Day by
hosting the non-partisan League of Women Voters of Ames and Story County. League
members helped library visitors check their voter registration status and complete the
registration process.
The Library will host satellite voting Saturdays, October 24 and 31, from 9 a.m. to 4 p.m.
More information, including important dates and deadlines for absentee voting, are
available at https://www.amespubliclibrary.org/learn-explore/civics-center/voting.
3
ELECTRIC
Prime Time Power Program: Since 2007, Electric Services, through cooperation with
many of its customers, has participated in the Prime Time Power Program. Under this
program, customers volunteered to allow the utility to control air conditioners during peak
days in order to reduce electric system demand. Under this program, customers received
a $5/month credit on their bills during the four summer months.
This summer, the control system for this equipment suffered a major failure. Staff is
currently investigating the cost to replace the nearly 20-year-old system. Even without a
working Prime Time Power system, the utility will continue to give customers the
remaining $5/month bill credit for the remainder of the summer season. For the FY
2027/28 summer season and beyond, the monthly credits will be discontinued until a
replacement system is selected and becomes operational.
4
PARKS AND RECREATION
Aquatics: Furman Aquatic Center closed for the season on September 7, wrapping up
a fantastic summer. Below are several highlights for the 2026 summer season:
• There were 108 swimming days
• Open swim was partially impacted on nine days and on five days open swim was
moved to Fitch Family Indoor Aquatic Center because of weather
• Attendance for 2026 was 93,093, which is the highest over the last four years
Fitch Family Indoor Aquatic Center opened for in-school hours on September 8, and there
has been a steady flow of visitors enjoying lap swimming, water walking, open swim, and
Aqua Fitness classes.
Fall swimming lessons began September 15 with 85 swimmers enrolled in the session. It
is exciting to see so many swimmers continuing to build their skills and confidence in the
water.
Lifeguards recently completed their first fall in-service training at Fitch Family Indoor
Aquatic Center. The training keeps their skills sharp, knowledge strong, and teamwork
even stronger. Lifeguards train hard and are dedicated to ensuring they are prep ared to
respond confidently and effectively in any situation, just as they did throughout the
summer at Furman Aquatic Center.
Bandshell Remodeling: As part of the remodeling and renovation of the changing
rooms inside the bandshell at Bandshell Park, local contractor Iowa Home Crafters
constructed custom cabinets to provide storage for speakers and other equipment.
Adding a unique connection to the City’s parks history, the cabinets were crafted from
wood milled from an ash tree removed from North River Valley Park because of emerald
ash borer. The tree was harvested on February 12, 2020. More than six years later, in
May 2026, the lumber was transformed into new cabinets, giving the tree a renewed
purpose in another Ames park.
5
Daley Park Splash Pad: Staff received approval from the State of Iowa to proceed with
the construction of the Daley Park Splash Pad, 340 Wilder Boulevard. Recently, staff met
with the Department of Inspections, Appeals, and Licensing (DIAL) to discuss the project.
Staff discussed concerns with some of the requirement’s DIAL was requesting because
the City proceeded with the project based on information that was provided by the State
in January 2025. Staff at DIAL has changed since 2025 and the current staff did not know
the history of communication with the City. Staff is meeting with the contractor to
determine a construction timeline in order for the project to be completed for the 2027
season.
Furman Aquatic Center: Furman Aquatic Center closed for the season on September
7. Staff has drained all three basins and is in the process of completing winterization
procedures.
Homewood Golf Course: As of September 22, 2026, Homewood Golf Course has had
20,515 rounds of golf played. During the same time frame last year, there were 22,872
rounds played. Homewood opened on March 28 in 2025 and on March 30 in 2026.
Weather conditions have significantly affected Homewood’s rounds this year.
6
Below is information related to the Homewood Clubhouse rentals:
July 1, 2025 –
September 22, 2025
July 1, 2026 –
September 22, 2026
Paid Event Hours 27 23.25
Revenue from Paid Events $2,835 $2,441
Non-Paid Event Hours 32.50 21.75
Playground Safety Inspections: Staff has been completing annual playground
inspections since late August on the 40+ playground (structures and swings) locations
that are in the parks. The process includes evaluating every slide, deck, post, swing, and
associated hardware to ensure safety for the users. If deficiencies are identified, they are
fixed on the spot or parts are ordered.
Steven L. Schainker Plaza: Steven L. Schainker Plaza closed for the 2026 season on
August 31, in order for Henkel Construction to remove and replace the ice-skating ribbon.
Henkel started removing the concrete on September 1. Persistent rain in September has
delayed the planned concrete pour date from October 19 to early November.
Once poured, the concrete requires at least 28 days to cure. Construction crews have
worked weekends when possible, to avoid any additional delays.
7
WATER & POLLUTION CONTROL
Grant Funding for Water Plant Equipment Upgrades: Staff is happy to share that the
Delta Dental of Iowa Foundation has awarded a $25,000 grant to the Water Plant to defray
the cost of some fluoride equipment replacement. The equipment will allow the use of
fluoride in liquid form instead of as a powder, making it easier to maintain consistent
fluoride feed rates and reduce the frequency of operator attention and repair. The grant
essentially covers 100% of the equipment costs for the change.
New Lime Slaker Project is Ready to Proceed: At the first
Council meeting in October, staff will present a professional
services agreement for the design of a third lime slaker at the
Water Plant. The Water Plant uses a lime softening treatment
process to reduce the hardness of the groundwater source. The
slakers convert the pebble lime delivered to the plant into a
liquid slurry that can be pumped into the treatment basins. The
third slaker was part of the original plant design but was
deferred to help lower the initial cost of the plant construction.
The slaker will sit between the two lime storage silos, increasing
the redundancy of the lime feed system.
New Wellfield Project Closeout: Staff is preparing to close
out the North River Valley Wellfield project. Design work for this
project began back in 2013. There were many delays and
hiccups along the way, including: having to rebid the project
three times; major changes by the State Historic Preservation Office requirements after
work had begun; and having one of the three well sites turn out to be an unproductive
formation. In the end, the two wells that were constructed have a substantially hi gher yield
than expected, and the City also received nearly $1 million in loan forgiveness from the
Iowa Department of Natural Resources.
WPC Nutrient Reduction Modifications: Major concrete work continues on the new
aeration basins. The west basin is essentially complete and has passed a leak test. The
“H piers” in the first photo below have been pulled and backfill process around the
completed portions has begun. The heavy rain over the past several weeks has slowed
progress as mud and silt repeatedly wash down into excavation and the work area needs
to be repeatedly dewatered.
8
There have been numerous plant shutdowns to allow the new electrical switchgear to be
installed. These outages require the untreated wastewater to back up in the 4.1-mile-long
interceptor sewer. The timing must be carefully scheduled around the weather to ensure
that flow can be returned to the plant before there is an overflow from an upstream
manhole. This has slowed progress on the project. The contractor is currently projecting
start-up in mid-November, several months ahead of the April 1, 2027, substantial
completion date in the contract.