HomeMy WebLinkAbout~Master - Resolution approving Change Order No. 11 with Woodruff Construction, of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 ProjectRESOLUTION NO. 26-572
RESOLUTION APPROVING CHANGE ORDER NO. 11
ON CONTRACT WITH WOODRUFF CONSTRUCTION, OF AMES, IA,
FOR WATER POLLUTION CONTROL FACILITY
NUTRIENT REDUCTION MODIFICATIONS PHASE 1 PROJECT
FOR THE CITY OF AMES, IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper
on the above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames,
Iowa, that Change Order No. 11 in the amount of $55,909.91 on contract with Woodruff
Construction, of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction
Modifications Phase 1 Project be approved and adopted as attached hereto and made a
part hereof by this reference.
ADOPTED THIS 8th day of September, 2026.
_______________________________ _________________________________
Renee Hall, City Clerk John A. Haila, Mayor
Introduced by: Betcher
Seconded by: Rollins
Voting aye: Beatty-Hansen, Betcher, Gartin, Rollins
Voting nay: None Absent: Corrieri, Junck
Resolution declared adopted and signed by the Mayor this 8 th day of September, 2026.