BACKGROUND:
Hayden's Preserve LLC owns a 170-acre site at the corner of Hyde Avenue and 190th Street
(Attachment A - Location and Zoning Map). This site was originally planned for annexation
with a development agreement in 2010 and the project was named Rose Prairie. Since that
initial plan and agreement, two rezonings and amended Master Plans have been approved by
the City and the project is now named Hayden’s Preserve. The most recent rezoning and
Master Plan approval was in 2021 (see attached) and included an amended development
agreement addressing certain off-site and on site improvement requirements.
The current proposal is the result of recent changes to the City’s Conservation
Subdivision Ordinance that modified allowable site design options and the City
Council’s support for housing development incentives. The applicant describes the
changes in detail with their attached project description. The most significant
differences from 2021 to the current proposal include:
Expansion of the FS-RL zoning
Elimination of approximately 13.5 acres of FS-RM zoning and related apartment building
units
Reduction of the Commercial General Service (CGS) zoning from approximately 5 acres
to 2.76 acres
Modifications to the planning of open space and the set asides
Creation of a new east west roadway across the creek connecting the internal collector
street to Hyde Avenue
Modification to the internal circulation of a "spine road"
With this proposal, the total number of dwellings increase from a maximum of 620 to
675 dwelling units. The previous range was from 451 to 620 units. The new maximum
range is from 350 units to 675. The proposed plan does not include a breakdown of planned
unit types between attached and detached units as was provided with the prior plan.
The prior 620 dwelling unit limit was set as part of the 2016 rezoning approval which was
agreed upon in response to the developer ’s request to accommodate a maximum of 746
dwelling units. The 2021 Master Plan did not change the maximum number of units. The
estimated overall developable area of the site has been relatively consistent between
approximately 93 to 100 acres with all of the approved Master Plans and this proposal.
1
Based upon the estimated net 93 residential developable acres, the density is calculated at
7.25 dwelling units per net acre. The 2021 plan density for the combined FS-RL and FS-RM
was 90.3 developable acres for a density of 6.9 dwelling units per acre. The proposed
development density is within the allowable maximums of the FS-RL zoning, which is 10
dwelling units per acre.
The housing types are now focused on single-family detached and attached housing
without apartments or commercial office space. To achieve the high end of the
dwelling unit targets, the project will include a substantial number of moderately sized
single family detached lots and small detached single-family lots and townhome single-
family attached lots. Some of the development will include townhomes for rent along
with the majority of units planned as ownership housing. The developer anticipates
applying for Planned Unit Development (PUD) approvals with future subdivision plans to
accomplish this goal for a higher-density mix of single-family home types.
Major issues from the prior Master Plan and rezoning applications included removing
the planned east-west road connection, shared use path/trail construction, the amount
of impervious area and the design of storm water treatment facilities in relation to the
Ada Hayden watershed, and increased traffic.
The proposed Master Plan once again includes the east-west roadway that was
originally expected with the development. This is a significant and positive change to
the overall plan that is tied to the City Council support for development incentives for
the project.
The Master Plan accommodates a major greenway for a recreation trail through the middle of
the site. The developer will also include internal shared use path improvements. The City has
determined that, as a development incentive, the Hyde Avenue trail will be built by the
City and not the developer.
The total open space is similar to prior plans and keeps both existing streams intact with offline
(outside the current channel) stormwater treatment. At the time of subdivision review, details of
storm water treatment and detention will be addressed. The developer intends to
incorporate a treatment train approach to storm water that was previously agreed upon
with approvals based upon the 2021 Master Plan.
The Plan will include a neighborhood park of approximately five acres, subject to City
Parks and Recreation staff approval regarding its final location and layout. The
proposed plan has it shown in the west central part of the site. The prior plan had the park
located further north, which by phasing would be completed sooner in the project.
Staff supports a location to the north of the east-west waterway and will continue to refine its
location and features prior to subdivision review. The current agreement requires dedication of
the parkland to the City as part of an early phase of development. The City will then make park
improvements at its discretion in the future.
Trip generation from the increase in units was not determined to be a substantive change to
the previous maximum of 620 units. The traffic generation and trip patterns are consistent with
prior traffic analysis and assumptions for growth in this area, most recently with the Ames Plan
2040 Comprehensive Plan, 190th Street roundabout study, and the most recent Ames Area
2
MPO transportation plan adopted in 2025, Ames Connect 2050.
At the time of subdivision review, appropriate turn lane improvements along Hyde and 190th
Street will be evaluated. No additional dedication of land or improvements by the developer
are anticipated at this time in relation to 190th/Hyde intersection.
A Master Plan is a City of Ames requirement for development of FS-RL areas of the City. A
Master Plan defines basic layout and use issues of a site as part of a rezoning action. The
Master Plan is required to identify types of uses, density, natural areas, and perimeter road
and trail access points. A Master Plan does not approve a subdivision of the land and internal
lot layouts, only the range of use.
Prior to grading of the site or construction of buildings, a subdivision would need to be
approved to provide the detail needed to verify consistency with City standards related to lot
layouts, road pattens, and utility extensions. Subsequent development must conform to the
Master Plan and a subdivision plat is reviewed for consistency with the Master Plan.
As noted earlier, the proposed Master Plan identifies the planned development areas of
the site and the primary street connections. The Plan allows for detached and attached
single-family housing, but does not estimate the quantities of each type of housing.
The proposed Master Plan differs from the 2021 Plan in its designation of areas for
development and housing details. The proposed Master Plan does not identify separate
“pods” of development as was provided with the prior Master Plan. The core area of the plan is
intended for concentrated residential development and an interconnected street system
compared to the last concept of a central spine road and loop streets. Some open spaces will
be included within this core area, but it is not a defined open space element as it was with the
prior Master Plan with the pods. This is partially a result of the changes to the Conservation
Subdivision Ordinance requirements related to site layout. However, staff finds the overall
open space plan to be consistent with prior points of emphasis regarding creek buffers
and managing stormwater runoff to protect Ada Hayden.
DEVELOPMENT AGREEMENT
The current development agreement is a combination of terms from the original pre-
annexation agreement, 2016 master plan amendment, and the revised plans from 2021. The
agreement addressed layout, payment of the Hyde Avenue street assessment, payment of
traffic, water, and sewer fees, construction of the shared use path, phasing, extension of the
east-west trunk line sewer, and the public park dedication.
In December 2025, City Council indicated support for development incentives related to
housing construction and addressed the developer's request by indicating support to change
the development agreement and to substantially modify the terms. As a result, a wholly new
development agreement will be drafted for the project that reflects Council's direction
regarding incentives and the proposed Master Plan.
The developer indicated to staff that they decided to proceed with this project because of
these Council incentives and the benefit of the reduced Xenia water territory buyout fee. They
have requested consideration of one change from December tied to the cost of culvert
crossing. The developer asks that the Council support $750,000 of the culvert construction
3
costs with use of a TIF rebate. Staff has not reviewed details of this cost in comparison to the
initial phase of development costs and will explore it in greater detail. Staff had originally
proposed 50% of the cost (est. $375,000) along with corresponding requirements for LMI set-
asides that not longer apply.
Staff believes this connection is vital and needs to be part of the initial phase of development.
Staff believes that if their is justification to increase the amount to the requested $750,000, it
can be accommodated within the original parameters of skipping an initial year of TIF payment
to account for General Fund growth and then still make rebate payments to the developer to
pay off the improvement within 5-10 years. It will be very important to limit the amount of area
in the TIF to preserve general fud growth. Staff does not support any structure of rebates that
extends past ten years because the intent is to incentivize housing production as soon as
possible and put the onus on the developer to produce housing. Therefore, the structure of
rebate in the future agreement will be tied to phasing and accounting for a TIF rebate
payment to maximize the benefit of general fund property tax growth.
The new agreement will address the phasing of the project and the timing of the
construction of the culvert and cross of the creek as well as the remaining developer
obligations.
The following is a list of the other substantial incentive issues and developer obligations:
The City will waive the traffic signal fee
The City will waive water and sewer connection fees for the initial phase(s) of platted lots
in the first three years (up to 215 dwellings).
The City will undertake the extension of the east west trunk sewer, the Developer will
then extend utilities through the site and connect to the trunk line.
The Developer will dedicate a neighborhood park to the City's specifications.
The Developer will plan for the east west greenway trail connection.
The City will construct the Hyde Avenue shared use path.
The Developer is responsible for street turn lane improvements and all improvements
within the subdivision.
PUBLIC NOTICE
Prior to the Planning and Zoning Commission meeting on August 19th, 400 foot mailed notice
was sent to property owners and a sign was placed upon the site. Staff received one written
comment about concerns with the project that was also discussed in person at the P&Z
meeting. The concerns included the history of traffic studies and new turn lane requirements,
potential impacts to water quality, questions about the need and benefit of increasing density,
grading plans, and housing types of the project. One other member of the public spoke asking
when more details would be available with the future preliminary plat application.
Staff discussed the history of the traffic analysis and conditions that were modeled for 190th
and Hyde Avenue and that the increase in proposed units did not trigger a new analysis.
Future improvements to Hyde south of this site are part of the City's CIP. The design of turn
lanes for the project would be part of the preliminary plat process. Issues of stormwater were
part of the open space planning and impervious surface estimates provided by the applicant,
staff believes there will be a benefit to water quality with development compared to row crops.
However, the formal stormwater management plans review is part of the preliminary plat.
4
The Commission explored questions about the creek, flood plain location, future stormwater
treatment, the requirements and tradeoffs of the Conservation Subdivision Ordinance, housing
types including changes to apartments, and the general layout of the site. The Commission
voted 7-0 to recommend approval.
ALTERNATIVES:
1. The City Council can:
a. Approve the request for the amendment to the Master Plan with first reading of an
ordinance for rezoning of the site to FS-RL as shown with the attached Master
Plan and retain approximately 2.76 acres of CGS zoning, subject to a zoning
agreement for the Master Plan prior to third reading for approval of the rezoning
request.
b. Approve a motion directing staff to work with the Developer to address the housing
incentives and development agreement terms included within this report.
2. The City Council can make modifications to the described the Master Plan regarding the
housing unit counts or layout and approve on first reading an ordinance rezoning the site
and for an updated Master Plan and zoning agreement prior to third reading or direct
staff to makes changes to the proposed development agreement terms.
3. The City Council deny the request for an amendment and rezoning to FS-RL if the
change is not consistent the Ames Plan 2040, is not in the public interest, or other
policies and regulations of the City.
4. The City Council can defer action on this request and refer it back to City staff and/or the
applicant for additional information.
CITY MANAGER'S RECOMMENDED ACTION:
The proposed Master Plan and rezoning is a different approach to the development of the site
that focuses on single-family attached and detached housing compared to the prior mix of
zoning and housing types. The developer has struggled to develop the site within the
constraints of the site conditions and infrastructure costs since acquiring the site. The
developer formulated this plan as response the City Council’s support for development
incentives that lessen the infrastructure burdens for the developer.
Even with incentives, the developer will bring utilities into the site and extend them through the
site at their cost. Roadway improvements are also a developer cost. The culvert crossing of
the creek for the east west road connection is an incentivized piece of infrastructure to be built
by the developer, but intended for the developer to be reimbursed for this investment.
Removing the crossing as a cost savings was contentious during the 2016 Master Plan and
2021 Master Plan. Staff believes the inclusion of the east west roadway is a significant
enhancement to the overall project design. Staff also believes this is the most critical
element of the amendment because it improves overall connectivity and
constructability of the project by being able to support phasing from the middle of the
site instead of from 190th.
5
The housing mix can be found consistent with RN-3 land use designation and goals from the
Land Use and Growth and Neighborhood, Housing, and Subarea Elements related to
supporting additional ownership housing and variety of housing choice even though the
apartment component is removed from the plan. There will still be rental townhome
component of the project.
The proposed increase in total housing units is at the upper end of projected housing density
for this size and type of site. In 2016 the Developer had asked for substantially more units and
was eventually limited to 620 to address development intensity concerns. At that time staff
had estimated approximately 650 units would be consistent with development patterns that
would also address site and layout concerns. Based upon the Master Plan layout and staff’s
preliminary review of development concepts, the proposed maximum of 675 units can fit within
the constraints of the site.
Therefore, it is the recommendation of the City Manager that the City Council adopted
Alternative No. 1.
ATTACHMENT(S):
Addendum with Location Map.docx
Applicant Narrative
Haydens Preserve Impervious Area Comparison
Hayden's Preserve Master Plan.pdf
5571 Hyde Ave-Hayden's Preserve- Rezoning Ord.docx
6
1
ADDENDUM
Ames Plan 2040.
Since the prior approvals for the site, the City updated its comprehensive plan to Ames
Plan 2040. The site was previously considered Suburban Residential with a Neighborhood
Commercial Node. The previous plans conformed to these designations and related
policies.
Plan 2040 identifies the site as RN-3 with a component of Neighborhood Commercial
Mixed Use. The site also includes an Open Space designation related to the planned park.
The current designations largely follow the general development approac h of the prior
designations. Both the prior Master Plan and the proposed amendments conform to the
Land Use and Growth policies for RN-3. See excerpts of relevant land use and housing
policies from Plan 2040 below.
AMES PLAN 2040 LAND USE MAP EXCERPT
Plan 2040 includes Park, Trails, Greenways Element. The project proposal includes a
plan for area dedicated as a public park to meet policies of the Element related to 5
acres of parkland per 1,000 people and having a park located within ½ mile of the
development. The combination of new parkland within the project and proximity to Ada
Hayden meet these standards.
The Master Plan also include the planned east west greenway that the City aspires to
connect to the west to Greenbriar and GW Carver Avenue.
Subject
Site
190th St
7
2
RN-3 EXCERPT FROM AMES PLAN 2040-PAGE 55
8
3
HOUSING ELEMENT EXCERPT FROM AMES PLAN 2040-PAGE 111
Existing/Proposed Zoning. The proposed rezoning changes approximately 13.5 acres
of FS-RM and 2.75 acres of CGS to FS-RL zoning. This changes the allowable uses within
these areas from apartments and commercial to single-family detached and attached
housing. The overall density range of the proposal is within the minimum and maximum
density ranges of 3.75 to 10.0 dwelling units per net acre.
The initial zoning of FS-RM and CGS was at the request of the applicant rather than a land
use requirements of the prior Comprehensive Plan. Staff does not find that commercial
area on this site is essential to meet any specific service needs of the City. A small
commercial area remains along Hyde/190th and that maintains consistency with the
current Plan 2040 designation for the corner. A C -store gas station is the likely long term
use of that location. Additionally, since 2016 the City has added planned commercial area
to the west with the planned Greenbriar project.
The current FS-RM zoning was also requested by the developer in order to construct
apartments and develop a large portion of the site all at one time to improve the financial
aspects of the project. Staff originally supported a limited number of apartments to provide
housing diversity with north growth. The developer will likely have a larger rental
development component within the project using a townhome concept rather than
apartments. Townhome rentals provide some diversity of use, but not at the same level as
apartments in terms of affordability.
9
4
The Master Plan indicates that more than 10% of the site will be set aside for Open Space
as required by FS-RL zoning, nearly 40 acres of area are planned for various types of
open spaces set asides where a minimum of 17 is required.
Storm Water Management. The site will be developed to meet the requirements of the
City’s Conservation Subdivision Ordinance and Chapter 5b water quality and detention
requirements. The major natural drainage features will be preserved based upon the
Master Plan. The site previously had a natural resources survey approved by the City
Public Works Department and the new proposal is consistent with the prior analysis.
The standards require on-site treatment and storage of stormwater within open spaces
and conservation areas. The 2021 Plan estimated that 27.6 percent of the gross site acres
will be open space set asides. The current estimated open space is 23.5 percent.
Additional open space, such as trail corridors and drainage swales may be identified during
the preliminary plat process, increasing that number. The developer has also included
an impervious surface calculation comparison of the prior master plan and the
proposed master plan. These calculations are included as an attachment.
Staff also notes that since 2016, FEMA remapped flood plains in Story County and the
main channel that flows north south through the site is now labeled as a general flood
plain, which makes it subject to local flood plain ordinance standards and jurisdictional
review with state and federal agencies for changes to the channel.
The Master Plan does not indicate how stormwater will be treated and stored in
accordance with City requirements. However, the conservation subdivision regulations
require buffers along drainage ways and encourage best management practices in treating
storm water. In addition, the Chapter 5B Post-Construction Storm Water Management will
apply as well. The specific stormwater treatment plan for the deve lopment will be
evaluated as part of the preliminary plat review.
10
5
Attachment A: Location and Zoning Map
11
Memo| Hayden's Preserve Rezoning and Master Plan Narrative
Page 1
Rezoning Request Narrative
Date: August 13, 2026
Project: Hayden's Preserve | 5571 Hyde Avenue, Ames, Iowa
To: Kelly Diekmann, Planning and Housing Director
From: McClure, on behalf of Hayden's Preserve LLC / ATI Group
Subject
Rezoning and Master Plan Narrative
Project Background and Purpose
Hayden's Preserve is a 170.33-acre master-planned community legally described as Lot 2 of the Rose Prairie
Final Plat. The property is bounded by Hyde Avenue and W 190th Street, with the railroad forming another site
boundary. An unnamed tributary and its associated floodplain cross the property and establish a continuous
open-space and stormwater-management corridor that has served as the organizing feature of each master
plan concept.
The requested rezoning and master plan amendment would revise the Council-approved 2021 plan, as
reflected in the February 15, 2022 informal update. Portions of the existing commercial and FS-RM areas are
proposed for FS-RL zoning, while the master plan intentionally retains flexibility in the ultimate allocation of the
93.07-acre residential developable area between FS-RL and FS-RM. Separate acreages for the two districts are
therefore not fixed at this master-plan stage and would be established through subsequent detailed planning
and platting.
The principal goals are to expand the flexibility and supply of housing, simplify the land-use pattern, right-size
the commercial component, improve internal and external connectivity, and coordinate development with the
tributary corridor, open space, park area, and planned stormwater treatment areas. The resulting neighborhood
is intended to accommodate attached and detached single-family housing through phased development
supported by public streets, utilities, open-space amenities, and trail connections.
The 2021 Approved Master Plan
The prior master plan established three zoning districts: a 6.01-acre Convenience General Service (CGS)
commercial area, 13.54 acres of FS-RM residential area, and 76.83 acres of FS-RL residential area. Within 90.37
net residential acres, the plan supported 451 to 620 dwelling units: 136 to 192 FS-RM units, 110 to 155 attached
single-family units, and 205 to 273 detached single-family units.
The 2021 plan allocated 23.10 acres to public right-of-way, 38.22 acres to dedicated open space, and 12.67
acres to a public-park area. Its street system used a north-south collector and local loops and cul-de-sacs, with
connections to Hyde Avenue and W 190th Street. The 2021 amendment eliminated a previously contemplated
east-west street connection from Hyde Avenue to the collector. Trails, stormwater treatment areas, and the
generalized greenway corridor followed the site's drainage features.
12
Memo| Hayden's Preserve Rezoning and Master Plan Narrative
Page 2
The Proposed 2026 Revision
The proposed revision retains the 170.33-acre site boundary and reorganizes the development program into
93.07 acres of residential developable area, 21.52 acres of proposed public right-of-way, 39.96 acres of open
space, a 2.76-acre commercial area, and 13.02 acres identified on the exhibit as 'Net Area.' The residential
program increases to an estimated 650 to 675 units, or approximately 3.82 to 3.97 dwelling units per gross acre,
and the residential area is labeled for attached and detached single-family housing.
The revised circulation concept adds a continuous east-west street connection, provides three connections to
Hyde Avenue and a connection to W 190th Street, and identifies a connection toward Auburn Trail. This
connected framework replaces more isolated loop and cul-de-sac segments, distributes traffic among
additional access points, and provides a clearer structure for emergency access, utilities, pedestrian
movement, and phased construction. A future 10-foot shared-use path is identified along Hyde Avenue.
The unnamed tributary and floodplain remain the central open-space spine. The exhibit also identifies a park
area, open-space detention and buffer areas, conceptual water-quality treatment areas within the developable
blocks, and onsite and offsite stormwater drainage outlets. These features continue the prior plan's approach of
coordinating development with drainage and environmental corridors while adapting the developable blocks to
the proposed residential program.
Comparison to the Prior Master Plan
The proposed master plan retains the same project boundary but revises the planned unit range, housing mix,
street framework, open-space allocation, and zoning approach. The following comparison uses the February
15, 2022 informal update of the 2021 master plan and the proposed master plan exhibit submitted August 5,
2026.
Topic Prior Master Plan Proposed 2026 Plan / Change
Gross project area 170.33 acres 170.33 acres; no change
Residential units 451-620 units 650-675 units; higher planned unit range
Housing types FS-RM residential housing; FS-RL attached
and detached single-family housing Attached and detached single-family housing
Street configuration
North-south collector and local loops/cul-
de-sacs; no east-west connection from
Hyde Avenue to the collector
Adds a continuous east-west connection and a more
connected internal street framework
Vehicular access Connections to Hyde Avenue and W 190th
Street
Three Hyde Avenue connections, one W 190th Street
connection, and a connection toward Auburn Trail
Commercial 6.01 acres 2.76 acres; decrease of 3.25 acres
FS-RM 13.54 acres Not separately allocated; included within the combined
93.07-acre residential developable area
FS-RL 76.83 acres Not separately allocated; included within the combined
93.07-acre residential developable area
Residential
developable area 90.37 net acres 93.07 acres; increase of 2.70 acres
13
Memo| Hayden's Preserve Rezoning and Master Plan Narrative
Page 3
Topic Prior Master Plan Proposed 2026 Plan / Change
Proposed public
right-of-way 23.10 acres 21.52 acres; decrease of 1.58 acres
Open space / public
park
50.89 acres total (38.22 acres dedicated
open space plus 12.67-acre public-park
area)
39.96 acres shown as open space, including park, detention,
and buffer areas; decrease of 10.93 acres based on exhibit
labels
Other net area Not separately identified 13.02 acres identified as 'Net Area'
Gross density Approximately 2.65-3.64 dwelling units per
acre Approximately 3.82-3.97 dwelling units per acre
Trail system Internal trail system and oversized
greenbelt trail
Future 10-foot shared-use path along Hyde Avenue and
connection toward Auburn Trail
Estimated impervious
area
80.59 acres using the 2016 coefficient
method
78.16 acres under stated assumptions; estimated decrease
of 2.43 acres
Support for the Requested Zoning Approach
The requested zoning approach supports the City's purpose for the Suburban Residential Floating Zone by
providing a contemporary suburban development pattern with coordinated residential land uses, an efficient
street and utility framework, and planned open space. FS-RL accommodates the attached and detached single-
family housing identified on the proposed master plan, while retaining FS-RM as a secondary designation
preserves flexibility to respond to the final subdivision layout, housing program, and phasing.
The master plan is intended to establish the overall development framework rather than fix the boundary or
acreage of each residential zoning district. The combined 93.07-acre residential developable area, together with
the planned unit range of 650 to 675 units, provides the controlling sitewide framework. The final FS-RL and FS-
RM allocation would be established through subsequent rezoning, subdivision, and site-planning actions as
development details are refined.
The revised plan also advances the FS development principles by organizing developable areas around natural
drainage corridors, reserving land for open space and stormwater treatment, and providing multiple street and
trail connections. These features support an efficient and connected subdivision pattern while protecting
environmental corridors and providing neighborhood amenities.
Impervious Area Comparison
A separate impervious-area and stormwater-volume worksheet accompanies this narrative. Using the same
land-use coefficients and rainfall depths documented in the May 25, 2016 Rose Prairie calculation, the 2021
master plan is estimated at 80.59 acres of impervious area and the proposed 2026 master plan is estimated at
78.16 acres, a preliminary reduction of approximately 2.43 acres.
The 2026 estimate assumes 9.00 acres of improved park based on the June 8, 2021 Council Action Form, treats
the remaining 30.96 acres of the stated 39.96-acre open-space total as non-impervious, and applies 0%
imperviousness to the separately identified 13.02-acre 'Net Area.' The estimate must be revised if the park
acreage or intended use of the Net Area differs from those assumptions.
14
Memo| Hayden's Preserve Rezoning and Master Plan Narrative
Page 4
Conclusion
The proposed 2026 revision builds on the 2021 entitlement framework while updating the land-use pattern,
residential program, and circulation network to support current development objectives. It preserves the
170.33-acre boundary and the tributary/open-space corridor, reduces the standalone commercial area,
increases residential developable acreage and unit capacity, and restores an east-west street connection with
additional site access. By intentionally leaving the FS-RL and FS-RM acreage split flexible within the combined
residential area, the master plan provides a coordinated basis for phased development while allowing the final
zoning allocation to respond to the detailed subdivision design and housing program.
15
(8.13.26)
Usage Area (acres) Units or Lots % Impervious ⁵ Impervious Area (acres)
Single Family (Detached)54.92 273 65% 35.70
Single Family (Attached)21.91 155 65% 14.24
Medium Density 13.54 192 65% 8.80
Commercial 6.01 - 85% 5.11
ROW 23.10 - 67% 15.48
Park 12.67 - 10% 1.27
Open Space 38.22 - 0% 0.00
Total 170.37 620 47% 80.59
Usage Area (acres) Units or Lots % Impervious ⁵ Impervious Area (acres)
Residential Developable Area⁶93.07 675 65% 60.50
Commercial 2.76 - 85% 2.35
ROW (collector and local streets)⁷,⁹21.52 - 67% 14.42
Reserved Park 4.93 - 10% 0.49
Open Space (excluding reserved park)35.03 - 0% 0.00
Other Net Area 13.02 - 0% 0.00
Total 170.33 675 46% 77.75
1 Yr
(acre-feet)
10 Yr
(acre-feet)
100 Yr
(acre-feet)
Depth, in. (24 hour event) 2.67 4.46 7.12
2021 Master Plan 17.93 29.95 47.82
2026 Master Plan 17.30 28.90 46.13
Hayden's Preserve Master Plan - Impervious Area Stormwater Volume Calculations¹,
Table 1: Impervious Area Calculations for 2021 Master Plan
Table 2: Impervious Area Calculations for 2026 Master Plan
Table 3: Stormwater Volume Calculations (on impervious areas only)¹,⁸
16
V = CDA
Where,
V = Total Volume (acre-ft)
C = Runoff coefficient
D = Depth of rainfall (ft.)
I = Area (acres)
6. The 2026 exhibit identifies one combined 93.07-acre residential developable area. The 65% residential coefficient is applied to the entire area,
including the local/internal streets contained within the residential developable area.
7. The separately identified 21.52-acre ROW represents the broader ROW network, including collector and local streets—not collector roads only. It
is retained at 67% impervious, based on a typical 60-foot ROW with 28 feet of paving and dual 6-foot sidewalks.
8. The 2026 exhibit identifies 39.96 acres of total open space. Of this area, 4.93 acres are reserved for park use and assigned 10% impervious; the
remaining 35.03 acres and the separately identified 13.02-acre 'Net Area' are treated as 0% impervious. Future stormwater treatment facilities are not
included. These calculations are preliminary and must be updated if those assumptions change.
1. Only calculates surface water runoff from impervious areas that are conservatively assumed.
2. 2021 areas and unit counts are based on the June 8, 2021 Council Action Form. Published land-use categories sum to 170.37 acres, 0.04 acre
greater than the stated 170.33-acre gross site because of rounding.
3. 2021 maximum counts are 273 detached single-family units, 155 attached single-family units, and 192 medium-density units, for 620 total units.
4. The maximum unit count proposed in the 2026 Master Plan (675 units) is used for these calculations per City request.
5. SUDAS Table 2B-4.03 is used for percent impervious area by land use, consistent with the May 25, 2016 calculation.
Footnotes:
17
18
DO NOT WRITE IN THE SPACE ABOVE THIS LINE, RESERVED FOR RECORDER
Prepared by: Renee Hall City Clerk’s Office, 515 Clark Avenue, Ames, IA 50010
Phone: 515-239-5105 Return to: Ames City Clerk, P.O. Box 811, Ames, IA 50010
ORDINANCE NO.
AN ORDINANCE AMENDING THE OFFICIAL ZONING MAP OF THE
CITY OF AMES, IOWA, AS PROVIDED FOR IN SECTION 29.301 OF THE
MUNICIPAL CODE OF THE CITY OF AMES, IOWA, BY CHANGING THE
BOUNDARIES OF THE DISTRICTS ESTABLISHED AND SHOWN ON
SAID MAP AS PROVIDED IN SECTION 29.1507 OF THE MUNICIPAL
CODE OF THE CITY OF AMES, IOWA; REPEALING ALL ORDINANCES
AND PARTS OF ORDINANCES IN CONFLICT HEREWITH AND
ESTABLISHING AN EFFECTIVE DATE
BE IT HEREBY ORDAINED by the City Council of the City of Ames, Iowa;
Section 1: The Official Zoning Map of the City of Ames, Iowa, as provided for in
Section 29.301 of the Municipal Code of the City of Ames, Iowa, is amended by changing
the boundaries of the districts established and shown on said Map in the manner
authorized by Section 29.1507 of the Municipal Code of the City of Ames, Iowa, as follows:
That the real estate, generally located at Hayden’s Preserve Development at 5571 Hyde
Avenue, is rezoned to Floating Suburban Residential Low (FS-RL) Density with Master
Plan.
Real Estate Description: for 5571 Hyde Avenue, Lot 2 of the Rose Prairie Final
Plat, removing existing Floating Suburban Residential Medium Density (FS-RM) zoning
while increasing the area of Low Density Residential (FS -RL) zoning to approximately 167
acres and reducing the Commercial General Service (CGS) zoning to approximately 3
acres of the site.
Section 2: All other ordinances and parts of ordinances in conflict herewith are
hereby repealed to the extent of such conflict.
Section 3: This ordinance is in full force and effect from and after its adoption
and publication as provided by law.
ADOPTED THIS day of , .
19
Renee Hall, City Clerk John A Haila, Mayor
20