HomeMy WebLinkAboutA018 - September 8, 2026, Regular Meeting of the Ames City CouncilITEM #:18 DATE:09-08-26 DEPT:ELEC SUBJECT:ENGINEERING SERVICES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEM IMPROVEMENTS COUNCIL ACTION FORM BACKGROUND: The Electric utility’s Supervisory Control and Data Acquisition (SCADA) system is used to monitor status and control power flows for interconnections to neighboring utilities, local distribution, and transmission. Data from SCADA is also used as the basis for billing energy transactions. The capabilities SCADA provides are crucial to the function of the electric utility. The existing SCADA system was installed in 2000. Since then, the SCADA software and hardware have advanced to meet evolving industry standards and regulatory requirements. Historically, the City maintained the system through support agreements with the current vendor, which provided routine maintenance and periodic software and hardware updates. Recently, however, the vendor ’s business practices have changed, making ongoing maintenance and updates more complex and more costly. The current vendor no longer supplies the hardware needed to support the current system nor complete future upgrades, and it has been continually difficult to obtain vendor customer support when needed. The SCADA system is currently due for updates, but completing these updates with the current vendor would be significantly more difficult and costly and any future updates are expected to present the same challenges. Staff has determined it would be in the best interest of the Utility to pursue a replacement of the current SCADA system. Electric staff would like the assistance of an Engineering consultant, with SCADA system experience, to assemble a specification for the performance of the new system and support through the replacement process. The specification will be used to bid out the new system. On June 5, 2026, a Request for Proposals for the assistance of an Engineering consultant were issued in AmesBids by Purchasing. On July 7, 2026, ten proposals were received as shown below. 1 FIRM COST RANKING Power System Engineering, Inc. Madison, WI $77,735.00 1 Qualus LLC Lake Mary, FL $185,937.00 2 Clearline Innovation, LLC Holmen, WI $118,200.00 3 ESTA International, LLC Sterling, VA $349,023.00 4 Patterson and Dewar Engineers Norcross, GA $177,000.00 5 Utilicast, LLC Kirkland, WA $236,810.00 6 ENTrust Solutions Group Warrenville, IL $154,035.43 7 Enetk Dickensen, ND Non-Responsive Olsson Lincoln, NE Non-Responsive Statistics & Control Inc West Des Moines, IA Non-Responsive An evaluation team comprised of City staff reviewed the proposals. The proposals were evaluated on experience and qualifications of the Firm's project team, the Firm's ability and quality of services that best meets the needs of the City, suitability and clarity of the Firm's response, and cost. Three proposals were non-responsive as their proposals did not meet the City's requirements. After scores from the evaluation team were totaled, Power System Engineering Inc, of Madison, WI, has the highest ranked proposal. The price reflects the standardized data collection and specification writing process they've developed for clients SCADA systems. Staff is confident in the Firm's proposal due to the Firm's experience, project team experience and qualifications, and the approach detailed in the proposal after reviewing the example forms for their standardized SCADA specification process. The Combustion Turbine Controls Upgrade Capital Improvement Project has seen significant savings as the result of favorable bids and a scope change involving using a Programable Logic controller (PLC)-based platform instead of a Distributed Control System (DCS) platform extension. Due to the importance of the utility's SCADA system, $800,000 of the savings from the Combustion Turbine Controls Upgrade project were reallocated to replacing SCADA at the May 26th, 2026, City Council meeting. Staff will use these reallocated funds to secure the assistance of the Engineering consultant to replace the SCADA system. 2 ALTERNATIVES: 1. Award a contract to Power Systems Engineering, Inc, of Madison, WI, for Engineering Services for Supervisory Control and Data Acquisition (SCADA) System Improvements in the amount not-to-exceed $77,735. 2. Award a contract to another firm. 3. Do not approve the request. CITY MANAGER'S RECOMMENDED ACTION: SCADA provides crucial functionality and control of electricity throughout the City as well as being the basis for billing energy transactions and t he existing SCADA system is in need of an update. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as described above. 3