HomeMy WebLinkAboutA038 - Ames Municipal Energy CenterTo:Mayor & City Council From:Donald Kom, Director of Electric Services Date:July 28, 2026 Subject:Reciprocating Internal Combustion Engines and Transformer Procurement for Ames Municipal Energy Center Item No. 37 MEMO Please see the attached Council Action Form regarding Reciprocating Internal Combustion Engines and Transformer Procurement for Ames Municipal Energy Center. ATTACHMENT(S): AMEC_Updated_Values.pdf C-2520 - RICE LOR_0.pdf Electric 515.239.5105 main 515.239.5142 fax 515 Clark Ave. P.O. Box 811 Ames, IA 50010 www.CityofAmes.org 1 1 ITEM #: 28 DATE: 07-28-26 DEPT: ELEC COUNCIL ACTION FORM SUBJECT: RECIPROCATING INTERNAL COMBUSTION ENGINES AND TRANSFORMER PROCUREMENT FOR AMES MUNICIPAL ENERGY CENTER BACKGROUND: The Ames Municipal Energy Center (AMEC) project involves the design and construction of a new facility at the former coal yard site south of the existing Power Plant, where the next generation of electric generating assets will be installed and operated. This project involves the purchase of three reciprocating internal combustion (RICE) engines, their associated generators and accessories, and the generator step -up transformer (GSU). This information was originally presented to the City Council at the July 21 workshop. The City Council is now being asked to take action to approve the two contracts. The City has retained Sargent & Lundy, Chicago, IL, to assist with the design of the facility and specifications for its major components. Over the past several months, Sargent & Lundy has assisted City staff in preparing a bid document for the transformer and a Request for Proposal (RFP) for the procurement of the reciprocating internal combustion engines (RICE), both which will be installed at the new facility. AMEC PROJECT BUDGET: At the April 21, 2026 City Council workshop, staff presented the revised project budget estimate, which was $190 million +/-5%. At that time, staff provided an overview of the financial impacts based on an analysis from the City's financial consultant, PFM. PFM conservatively projected that electric rates will need to increase by approximately 2.5% annually beginning in FY 2026/27 through FY 2043/44 (18 years), followed by 1.5% annual increases through the life of the bonds (FY 2056/57). As the staff report explained at that time, the Electric rate projections had previously included a 1.5% rate increase over the next five years to cover the cost for ongoing operations and a $50 million investment in additional generation. As a result of the PFM analysis and increased project costs, the report recommended rate increases of 2.5% annually to cover debt service and projected operating costs. These rate increases are also predicated on the utility saving substantial operating costs from discontinuing the burning of refuse- derived fuel. The AMEC project budget contains several major project components, including the transformer, the RICE engines, and the general work to construct the building and install much of the equipment. The City Council is being requested to approve two of these it ems (the transformer and RICE engines) at this meeting. 2 2 The April project budget table contained 14 key items, plus three additional expense lines for taxes ($5.3M), overall project escalation ( $14M) and contingency ($24M). The tax, escalation, and contingency estimates are the sum of the taxes, escalation, an d contingency for each individual budget line. Staff has asked Sargent & Lundy to prepare a revised budget table that assigns the tax, escalation, and contingency to each individual expense line. Incorporating the escalation and contingency in particular is important because some items in the budget are more susceptible to substantial cost increases and affected by timing. The result is the revised table shown below: TOTAL ESTIMATED BUDGET - EACH LINE DESCRIPTION ADJUSTED TO INCLUDE TAX, CONTINGENCY, ESCALATION Reciprocating Internal Combustion Engines (RICE) and Auxiliary $ 73,315,096.14 Equipment Generator Step-Up Transformer (GSU) 4,805,580.00 GSU Relay Protection Control Cabinet & Metering 393,900.00 MV Non-Segregated Bus Duct 196,950.00 Balance of Plant Station Batteries and Charging System & UPS 1,293,815.76 Geotechnical Investigation 182,287.06 Topographical Survey, Benchmarks, and Property Limits Survey 37,710.00 Acoustical Consultant 50,280.00 Independent Testing Service 62,850.00 General Work Contractor 97,366,422.65 Engineering Services 8,800,427.01 Construction Management At-Risk Support (Home office engineering 497,438.60 construction support and CM on site) Builders Risk Insurance (for 3 years) 1,773,692.31 Building Furnishings 377,166.20 Land Acquisition 502,888.26 Transmission Connection (Including MISO Application) 3,017,329.57 TOTAL $ 192,673,833.56 By incorporating the taxes, escalation, and contingency into each of these line items, as contract prices are considered for the GSU and RICE engines, it becomes clearer how close the major contract items align with the overall budget and what the remaining outstanding cost risks are. GENERATOR STEP-UP TRANSFORMER: Each set of three RICE units will be connected to a single Generator Step -Up Transformer (GSU) to transmit the electricity to the utility's electric system. The transformer has a long lead 3 3 time to manufacture and deliver. On May 12, 2026, the City Council received the report of bids for the generator step -up transformer for the AMEC project and approved the recommendation to delay the award of bid. Staff is now prepared to request the City Council's approval of the transformer contract at the July 28 meeting. The Engineer's estimate for this equipment is $3,600,000, exclusive of tax. On February 20, 2026, an Invitation to Bid was posted to AmesBids by Purchasing, for the purchase of a GSU. On April 24, 2026, 10 bids were received as shown in the table below: BIDDER BID AMOUNT Cavalry Energy LLC $1,641,075.00 Warrendale, PA EL Power Tech Co., LTD. $1,940,000.00 Hwaseong-Si, Gyeonggi-Do, Korea Meta Power Solutions $2,152,856.16 Lake Park, FL Cahoon Sales, Inc. $2,248,100.00 Iowa City, IA Cleaves-Bessmer-Marietti, Inc. $2,285,368.00 Lee's Summit, MO RESCO (Rural Electric Supply Cooperative) $2,511,487.00 Ankeny, IA WEG Transformers $2,532,176.00 Washington, MO Hyundai Corporation USA $2,645,075.00 Torrance, CA Energy Solutions Inc. $3,564,998.00 Elkhorn, NE Fletcher Reinhardt Co No Bid Cedar Rapids, IA Staff and Sargent & Lundy thoroughly evaluated the bids, considering criteria including the size and performance capabilities of the equipment being bid, the efficiency of each unit, the place of origin and delivery methods, delivery times, the offered payment schedule, etc. It is important to note that for a bid of utility equipment such as this the City Council may make the award that is in the best interests of the utility rather than awarding the contract only to the lowest responsive, responsible bidder. Upon first review of the bids, Calvary Energy, EL Power Tech, Meta Power Solutions and Energy Solutions Inc. were unable to meet various specification requirements and were eliminated from further evaluation. Following this evaluation, staff and Sargent & Lundy are recommending that the contract for the GSU be awarded to Cahoon Sales, Inc., Iowa City, Iowa for a General Electric 69/13.8kV generator step -up transformer. The City Council should note that, although the initial bid price from this supplier was $2,248,100, the original bid validity date expired in June. More time was necessary than anticipated to review and negotiate contract terms, and therefore an extension to this date had to be negotiated. 4 4 In order to proceed, the supplier requires a cost increase of $60,700, resulting in a revised contract price of $2,308,800, plus applicable sales taxes. In addition, the delivery date has been delayed by three months. The delivery is now anticipated in early 2029. This delay is not anticipated to impact the overall AMEC project schedule, and will in fact eliminate some challenges with storing the transformer until it is ready to be installed. RICE ENGINES AND ASSOCIATED EQUIPMENT: The RFP for the RICE engines was issued on March 13, 2026. The RFP called for a supplier to design, engineer, procure, fabricate, assemble, and factory test the engines, then pack, ship, assemble, and set them on prepared foundations. It was specified that each engine be capable of operating both on natural gas and fuel oil, producing between 18 and 20 MW (54 -60 MW total). The design life of the engines is 30 years. A variety of optional components were also specified, including equipment and services such as lubricating oil and reagent storage tanks, exhaust gas ducting, steel structures, distributed control systems, switchgear, auxiliary ventilation units, five- and two-year service agreements, spare parts, heat recovery systems, and lower noise exhaust systems. Each supplier was asked to provide performance information for over 60 separate categories related to items such as fuel consumption, operating temperatures, noise, and emissions. The RFP specifies that proposals are to be evaluated on the basis of the following criteria: 1. Proposal Completeness and Compliance 2. Performance Characteristics 3. Emissions and Noise 4. Project Schedule 5. Included Scope 6. Testing & Commissioning 7. Maintenance Requirements and Training 8. Technical Field Assistance 9. Customer Base and Status of Technology Offered 10. Total Cost PROPOSALS RECEIVED: On May 29, 2026, proposals were received from: Wärtsilä North America, Inc., for three Wärtsilä 18V50DF engines. These are 18- cylinder dual-fuel (fuel oil and natural gas) engines, with each cylinder having a 50 cm bore. Each engine has a nominal output of 18.540 MW. Wärtsilä recently installed engines of this model for the Omaha Public Power District. The proposal expires July 31, 2026. Everllence SE, for three Everllence 18V51/60DF engines. These are 18-cylinder dual- fuel (fuel oil and natural gas) engines, with each cylinder having a 51 cm bore. Each engine has a nominal output of 18.522 MW. Everllence is installing similar engines for Cedar Falls Utilities The proposal expires July 31, 2026. The proposals differ greatly in the components and options included, in addition to the differences in the technical specifications between the two manufacturers. Staff and 5 5 Sargent & Lundy conducted a thorough analysis of the desired options and the costs in the context of the performance and other characteristics of each engine. In addition, both companies reduced their pricing during the course of negotiations through the morning of July 20. The bottom-line cost for each proposal is: Firm Price Wärtsilä North America, Inc. $ 69,230,520* Everllence SE $ 75,283,223** *Approximately 75% of this amount is calculated based on the conversion of Euros to USD on July 15, 2026. This amount is subject to revision at the time the down payment is made. After that date, Wärtsilä assumes any future exchange rate risk. **All of Everllence's pricing is calculated in Euros and converted to USD to result in this indicative price. This amount is subject to change based on conversion rates in effect shortly before the agreement is signed. After that date, Everllence would hol d the exchange rate risk for the first 36 months of the anticipated 5-year contract term. Both proposals involve the production of the major components in Europe, then importing the equipment to the U.S. Sales taxes and import duties are excluded from both proposals. These costs would be pass-throughs to the City. Both firms offer performance guarantees for various parameters of the engine's performance once installed. These guarantees provide for a reduction in cost if the specified performance is not able to be met after installation, start -up, and tuning. Additionally, both proposals contained options for long -term service agreements. These service agreements do not need to be included in the contract at this time, and will instead be agreed to at a later date and incorporated into the Electric Services ope rating budget rather than the AMEC capital project. For reference, the 5-year maintenance proposal from Wärtsilä is priced at $5,513,000, while the Everllence 5-year maintenance proposal is $13,231,980. Wärtsilä has identified a production slot that was relinquished by another buyer, which would allow the engines to be delivered to foundations in Ames in October 2029, with assembly and installation to follow for an estimated Spring 2030 commissioning. Everllence offers a delivery date to a European port of August 2029, followed by transport to Ames with an estimated substantial completion by June 2030. The Everllence units have approximately 8% better heat rate (the efficiency of fuel used per kW produced) as compared to the Wärtsilä units. The Everllence units consume slightly more lubricating oil and 50% more emissions reagent during operation. Emissions overall are generally similar for both manufacturers, but the notable differences are that Wärtsilä has a 40% lower NOx rate and a 50% higher CO rate than the Everllence unit. The table below shows the emissions in pounds per kWh produced, based on the conversion of three major emissions categories (Methane, Carbon Dioxide, and Nitric Oxide and Nitrogen Dioxides) to CO2 equivalent (CO2(e)). The existing power boilers (Unit 7 and Unit 8) are included for comparison: 6 6 Carbon Dioxide Equivalent CO2(e) Source lb/kWh Unit 7 1.76 Unit 8 1.68 Wärtsilä 1.05 Everllence 1.04 Both firms were invited to make presentations to the City staff and Sargent & Lundy team. Following the presentations, staff scored the proposals using the 10 different RFP evaluation criteria as noted above. Below are the final scores: Firm Total Points Rank Wärtsilä 260.7 1 Everllence 203.3 2 Based on the final scores, staff is recommending that the City Council award a contract to Wärtsilä North America, Inc. Sargent & Lundy has issued a letter of recommendation supporting the award to Wärtsilä, which is attached. Wärtsilä has installed its RICE units in a number of locations over the past 25 years. Recent installations have included Central Iowa Power Cooperative (CIPCO), Alliant Energy, Omaha Public Power District, Nebraska Public Power District, Rochester Public Utilities (Minnesota), WEC Energy Group (Michigan and Wisconsin), Black Hills Energy (South Dakota), Coffeyville Municipal Light & Power (Kansas), and Marquette Energy Station (Michigan). In addition to the overall capital cost for the Wärtsilä proposal being approximately $6M less than Everllence, the Everllence long -term service agreement is approximately $1.5M more costly on an annual basis. This cost would exceed any offset resulting f rom the slightly more efficient fuel use offered by Everllence. The Wärtsilä contract requires payments as follows: Item No. Est. Months from % of Contract Milestone Contract Signing Value 1 0 - Down Pmt. 25% Signed Contract and Notice to Proceed 2 4 10% 120-day document submittals complete 3 8 15% Purchase of major auxiliaries 4 32 25% First engine production conformity test 5 33 10% Engines ready to ship 6 34 5% Delivery of engines to U.S. port 7 40 5% Generator sets on foundations 8 43 2.5% Installation completion 9 51 2.5% Performance test completion The City Council should note that the proposed milestone schedule outlined above requires the City to make payments totaling 50% of the contract value within the first 7 7 eight months of the four-year agreement. Staff is confident that, based on its long record of producing and installing RICE engines worldwide and in the Midwest, Wärtsilä will be able to meet its obligations under this agreement to deliver and install the engines for the AMEC project. Although no financial surety is required for this type of contract, staff has inquired with Wärtsilä about the prospect of obtaining a surety bond to protect the City after payment is made in the event Wärtsilä is unable to complete the delivery as promise d due to bankruptcy. The cost for the premium payment of the bond is $1,560,923. A fter consulting with an outside attorney who specializes in electric generation contracts, staff believes that paying an additional $1,560,923 for a Surety Bond that covers performance and supply from an American insurance provider is warranted to protect against predominantly bankruptcy. Sargent & Lundy is preparing a cash-flow plan for the overall AMEC project. This plan can be considered alongside the Electric Capital Improvements Plan to ensure bond proceeds and the Electric Utility Fund balance are sufficient to make the required payments for this contract. The overall contract being presented to the City Council for approval on tonight's agenda does not include the cost of the $1,560,923 bond. If the City Council desires to include the bond, specific instruction from City Council will be necessary at the Council meeting to include the expense in the approval and to incorporate the bond into the final contract. The City retained an outside attorney from Dorsey & Whitney to provide guidance regarding the contract terms. Staff believes the contract that has been prepared with Wärtsilä is acceptable. Considering the base price and applicable taxes and tariffs, the current revised project budget, including the purchase of the GSU and RICE engines as described in this report, is shown below: TOTAL ESTIMATED BUDGET - EACH LINE CONTRACT (INCL. DESCRIPTION ADJUSTED TO DIFFERENCE INCLUDE TAX, TAX/TARIFFS) CONTINGENCY, ESCALATION Reciprocating Internal Combustion Engines (RICE) $ 73,315,096.14 $ 75,807,419.40 $ 2,492,323.26 and Auxiliary Equipment GSU 4,805,580.00 2,470,416.00 (2,335,164.00) GSU Relay Protection Control 393,900.00 Cabinet & Metering 8 8 MV Non-Segregated Bus 196,950.00 Duct BOP Station Batteries and 1,293,815.76 Charging System & UPS Geotechnical Investigation 182,287.06 189,569.00 7,281.94 Topographical Survey, Benchmarks, and Property 37,710.00 35,520.00 (2,190.00) Limits Survey Acoustical Consultant 50,280.00 Independent Testing Service 62,850.00 General Work Contractor 97,366,422.65 (CMaR) Engineering Services 8,800,427.01 Construction Management Support (Home office 497,438.60 engineering construction support and CM on site) Builders Risk Insurance (for 3 1,773,692.31 years) Building Furnishings 377,166.20 Land Acquisition 502,888.26 Transmission Connection 3,017,329.57 (Including MISO Application) TOTAL $ 192,673,833.56 $ 162,251.20 Surety Bond 0 $1,560,923 $1,560,923 TOTAL W/ SURETY BOND $194,234,756.56 $1,723,174. 2 ALTERNATIVES: 1. Approve the following: a) Award a contract to Cahoon Sales, Inc., Iowa City, Iowa, for the Generator Step -Up (GSU) Transformer for the Ames Municipal Energy Center, in the amount of $2,308,800. b) Award a contract to Wärtsilä North America, Inc., of Houston, TX, for three 18V50DF engines and auxiliary equipment, in the amount of $69,230,520 (subject to currency conversion rate). 2. Award contracts as described in Alternative #1, but authorize the payment of $70,791,443 which includes an additional $1,560,923 to include a surety bond in the contract with Wärtsilä North America, Inc. 3. Award contracts to a different combination of firms. 4. Reject all bids and proposals and provide further direction to staff. 9 9 CITY MANAGER'S RECOMMENDED ACTION: The contracts for the Generator Step- Up Transformer and RICE engines for the Ames Municipal Energy Center are the first major procurement steps in the project. These critical components have long lead times to fabricate, deliver, and install. Additionally, the RICE engine manufacturer must be selected in order to proceed with the engineering of other components of the project that will integrate with the engines, including the footings and building enclosure. It is important to note that the pricing for both RICE engine vendors will not be held past the end of July. Therefore, if the City Council is not prepared to approve a RICE contract award on July 28, the proposed pricing, engine production slot, and deliv ery date will no longer be available, subjecting the City to the risk of increased costs and substantial delays in obtaining these critical generating units. Staff has thoroughly evaluated the providers of both the GSU transformer and the RICE engines, in collaboration with Sargent & Lundy. The proposed equipment is expected to perform well for the project envisioned by Electric Services, and both firms are expected to be capable of providing the equipment within the desired specifications and timeframes. After consulting with an outside attorney who specializes in electric generation contracts, staff believes that paying an additional $1,560,923 for a Surety Bond that covers performance and supply from an American insurance provider is warranted to protect against predominantly bankruptcy. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 2, as described above. 10 Adam Redd Project Director Tel: (312) 269-2641 adam.j.redd@sargentlundy.com July 24, 2026 SL Project No. 15790.002 AEC-SNL-COA-0031 City of Ames Ames Municipal Energy Center Project Letter of Recommendation Reciprocating Internal Combustion Engines (RICE) Curtis Spence Assistant Director of Electric Services City of Ames, Iowa Tel: 515-239-5176 curtis.spence@cityofames.org Dear Mr. Spence, This letter summarizes the evaluation by Sargent & Lundy (S&L) for the Reciprocating Internal Combustion Engine (RICE) proposals received from Wartsila and Everllence for specification C-2520. The results of this evaluation are presented in this letter with attached supporting documents. Pending final commercial review by COA, Wartsila is recommended to be the RICE equipment supplier. This is due to Wartsila having a better technical offering as well as having the lowest evaluated cost, with both being discussed in more detail within the body of this recommendation. The evaluated cost is currently $69,287,767 (subject to Euro / USD exchange rate). SUMMARY: The request for proposal (RFP) was issued on March 13, 2026 to two proposers for the procurement of three (3) 18-20 MWe RICE generating sets. Initial proposals were received on May 27th and 29th, 2026 from the companies listed below. • Wartsila North America, Inc. (Wartsila) • Everllence SE (EVR) The proposals were generally complete and complied with the specification. Throughout the evaluation process, conversations with both proposers led to adjustments to the original proposals. As a result, a final proposal was submitted by Wartsila on July 17, 2026, and by EVR on July 20, 2026. The following exhibits provide additional details to support the evaluation of the proposals: • Exhibit 1 – Proposer Exceptions and Clarifications • Exhibit 2 – Proposer RFC Logs Further information regarding our technical and commercial evaluation is provided below. 11 C-2520 Letter of Recommendation Date: July 24, 2026 City of Ames Page 2 of 9 DISCUSSION: Scope of Supply: Specification C-2520 includes engineering, design, supply, fabrication, inspection, shop testing, shipping, packaging and delivery of the RICE Engines and engine auxiliaries. As-Received Bid Price: Exhibit 1 includes the Final Proposal Cover Letters submitted by EVR and Wartsila which include the as- received proposal pricing. The as-received base proposal pricing is provided in the following table: As-Received Proposal Price Summary EVR Wartsila (2) 1. The proposal prices are both originally in Euros and converted to USD based on the conversion rate on the day the proposal was submitted. 2. The Wartsila base proposal includes engineering, scope of supply (excluding freight), technical field assistance, and 2-year Warranty. All other items are considered optional adders. Options and Adjusted Pricing: In addition to the base scope, each proposer provided cost adders for optional scope to provide a more complete package. Some options are recommended to be included in the awarded contract while some are not. The table below shows the recommended award price for each proposer with their base scope plus recommended options. Recommended Award Price Summary EVR Wartsila Total Recommended Award Price $67,893,892 $69,287,767 EVR was not able to provide as complete of scope as Wartsila. In order to compare equivalent scopes, it was necessary to adjust the EVR proposal based on the estimated cost to the project for others to fulfill the scope items that were missing. The table below compares the adjusted prices that represent equivalent scopes of supply. Adjusted Price Summary EVR Wartsila 12 C-2520 Letter of Recommendation Date: July 24, 2026 City of Ames Page 3 of 9 Requests for Clarification (RFC): Sargent & Lundy also evaluated the proposal documents received and prepared the following Requests for Clarifications: EVR Wartsila Original proposal 29-May-26 27-May-26 RFC No. 1 12-Jun-26 12-Jun-26 RFC No. 2 16-Jun-26 16-Jun-26 RFC No. 3 19-Jun-26 19-Jun-26 The Request for Clarification (RFC) logs were issued to the two proposers to clarify scope questions, technical exceptions, and pricing information. Additional clarifying questions were asked during the interviews hosted with each proposer. Remaining questions were handled over email following the interviews. At the time of issuing this recommendation, most, but not all, of the clarifications with the proposers have been closed out. Any remaining open issues are addressed in the summary section. Details regarding technical issues are described in the following sections. Technical Evaluation: Technical Compliance with Specification The RFP requested Wartsila and EVR provide specific documentation to support their proposals. This documentation included general proposal information for scope of supply, pricing, and exceptions and clarifications (E&C) to the RFP. Also requested was input on the following: performance guarantees, emissions, and proposal submittal documentation (project schedule, general arrangements and equipment layouts, system technical data, preliminary one-line and controls architecture diagrams, test plans, manuals, spare parts requirements, long-term service agreement (LTSA) details, and other documentation). A large majority of these items were provided by both suppliers. Although some input was not provided, the remaining documentation is expected to be provided post award. Performance Characteristics A summary of the guaranteed performance characteristics is included below. Guaranteed Performance Characteristics Summary EVR (Gas/Oil) Wartsila (Gas/Oil) 18,522 18,132 1. EVR’s heat rate includes + 5 % tolerance Both Wartsila and EVR meet the intent of the specification regarding the power production requested in the RFP. EVR offers more favorable gross heat rates, and they offer an advantage in net power production over Wartsila (+1,170 kW) operating 3 total engines on fuel gas or fuel oil. Emissions Both proposers provided emissions details and guarantees within their proposal. After evaluation, it was determined that the emissions guarantees provided by both proposers were acceptable for the project and future permitting efforts. 13 C-2520 Letter of Recommendation Date: July 24, 2026 City of Ames Page 4 of 9 Scope of Supply After reviewing the proposals, a number of scope of supply differences were noted. Exceptions and Clarifications (E&C’s) to the RFP document are shown in Exhibit 1. Request for Clarifications (RFC) are shown in Exhibit 2. These documents include items from both the initial and revised proposals and provide clarity on the scope provided for each proposer. EVR offered a more reduced scope of equipment supply than Wartsila. An assessment of these scope variations as well as a discussion of additional technical items of note are described below: Mechanical Lube Oil and Reagent Tanks EVR has taken exception to providing the three lube oil tanks (new, used and service tanks) in addition to the Reagent storage tank. Although they’ve taken exception to providing the tanks, they’ve included the rest of the required equipment for these systems in their scope of supply. These tanks would need to be furnished by the Installation Contractor in order to complete the systems. A cost has been estimated for this equipment to be furnished by the Installation Contractor. Aux Side Ventilation Units Wartsila provided an optional cost adder to include the Aux Side Ventilation Units in their scope, but EVR did not. It is preferred for the RICE supplier to design and provide these units because there is significant coordination required with the design of these units, the charge air intake units, and the platforms to access them. A cost has been estimated for this equipment to be furnished by the Installation Contractor. Compressed Air Different compressed air system designs were proposed by each vendor, but both designs were deemed acceptable. The EVR system utilizes a 2 x 100% compressor arrangement for their starting air along with an air dryer and receiver tanks sized for a total of 6 engine starts without refilling. This size falls short of the RFP requirement for the system to accommodate 3 starts per engine. EVR’s instrument / control air system compressed air is provided by their SCR atomization air system which consists of three compressors in a 3 x 50% arrangement. The Wartsila proposed starting air system consists of a 3 x 50% compressor design with two air receivers sized for a total of 9 engine starts. This meets the requirement of the RFP for the system to be sized for 3 starts per engine. The instrument / control air system is also a 3 x 50% compressor design with 3 x 50% dryers, and 4 receiver tanks. The compressors quoted by Wartsila are provided in enclosures for additional sound attenuation. Both proposers indicated that their compressors had maximum temperature limitations and expressed concern with installing this equipment in the engine hall, which was the design indicated in the RFP package. Electrical Scope Options Option F of the specification included the following Electrical Equipment and Services: • MV Switchgear • LV Switchgear or Panelboards To support the OEM supplying the above equipment the following Services are included in Option F: • Aux Power Load Flow Study including Power Flow, Short Circuit Analysis and Motor Starting in ETAP • Arc Flash Analysis Wartsila and EVR included pricing for the items in Option F. During the proposal evaluation period, both proposers were asked to provide pricing for additional LV Switchgear compartments in order to meet the 14 C-2520 Letter of Recommendation Date: July 24, 2026 City of Ames Page 5 of 9 plant requirements for a future three engines as well as an incoming feed from a Reserve Auxiliary Transformer (as shown on the plant Single Line Diagram). Both proposers were able to comply with the requirements for the LV Switchgear. In addition to the items in Option F, Wartsila also included the auxiliary dry type transformer feeding the LV Switchgear. Both proposers initially took exception to providing the Black Start Diesel Generator required in the base scope. During the proposal evaluation period, each vendor was asked to provide a cost adder for the diesel generator to be sized for black start operation and 500kW minimum. Wartsila was able to provide a cost adder for the black start diesel generator as specified. EVR also included pricing for the items in Option F, but they were not able to provide pricing for the black start diesel generator in time to support award. Integration of the black start diesel generator with the electrical and controls systems requires significant coordination and therefore is recommended and preferred to be in the scope of the RICE vendor. A cost has been estimated for this equipment to be furnished by the Installation Contractor. ETAP Aux Power Load Flow Study Both EVR and Wartsila took exception to providing the Aux Power load flow study in native ETAP, offering .pdf only. Recreation of the ETAP model to facilitate analysis of future units will need to occur when COA starts looking into the addition of the future units. This will incur an additional cost to COA at that time. Control Design Impacts EVR requires monitoring of each breaker (MV and LV) back at their PLCs. This results in more cables required than the Wartsila design and therefore more conduit and tray needed for those cables. This also results in EVR PLCs being larger than Wartsila’s resulting in a need for a larger electrical room to house them. S&L requested top entry equipment in order to facilitate easier routing of cables, but EVR stated only bottom entry is available. To accommodate EVR’s bottom entry design, this could result in needing either a cable vault below the panels or a second story to the Main Electrical Room. I&C Both Wartsila and EVR presented viable control architectures and hardware offerings for the Ames Municipal Energy Center, however, Wartsila’s offering is more completely defined and presents lower overall integration risk for COA. Wartsila more clearly identifies the furnished controls hardware, including operator workstations, engineering workstations, common, engine, and auxiliary control panels, along with dedicated historian and DMZ servers. By comparison, EVR generally defers key controls details to Annex 6 and Annex 7, does not include separate DMZ or plant historian servers in its base offer, and instead indicates interface to the Purchaser’s historian via OPC-UA. An additional cost for a plant historian based on S&L experience is included in EVR’s adjusted proposal pricing. EVR states that the BOP control system/HMI is included in their base scope, while Wartsila carries the overall plant BOP DCS/PLC as an evaluated option; however, the latest evaluation still favors Wartsila on included scope and overall evaluated cost. Structural Base Scope The specification required the following structural scope of supply: • Maintenance platforms for full and complete access to all engines. • Primary access to all platforms shall be via stairs to the greatest extent possible. 15 C-2520 Letter of Recommendation Date: July 24, 2026 City of Ames Page 6 of 9 Scope Options Options B, C, and G of the specification included the following additional structural scope of supply: • Option B: Exhaust gas ducting, silencer, and stack support steel • Option C: Steel structures, platforms, and stairs for SCR system • Option G: Steel structures, platforms, and stairs for Radiator system Proposed Scopes of Supply Wartsila and EVR generally matched scope supply and exceptions regarding the structural supply. Both suppliers included engine maintenance platforms and the support steel specified in Options B, C, and G. Wartsila provided costs for each option, while EVR included the optional support steel in their base price. The specification required stairs be provided as the primary access means to all platforms to the greatest extent possible. Wartsila’s proposal specifies stair access for all platforms within their scope of supply. Meanwhile, EVR noted that access to the Level 3 engine and auxiliary service platform could only be reached by ladder, but that this platform would be rarely used. This was determined to be acceptable. The specification required all exterior structural steel, platforms, stairs, ladders, and handrails to be galvanized in lieu of paint. EVR confirmed all structural steel in their scope of supply will be hot-dip galvanized, while Wartsila’s technical specifications call for a high-durability paint. Wartsila provided a cost adjustment for hot dip galvanizing external support steel to meet this requirement. Testing & Commissioning: The main distinction between the testing plans of the two vendors is that the EVR proposal includes Factory Acceptance Testing of only one genset, but the Wartsila proposal includes testing of all three. Although both approaches are technically acceptable, Wartsila’s approach to testing each engine is much more comprehensive and meets the requirements of the RFP. Both vendors offered a significant amount of Technical Field Assistance (TFA) to help with commissioning on site. TFA is discussed further in a later section. Maintenance Requirements and Training: Maintenance and Training Wartsila offered a training program as part of their base proposal. The curriculum consists of two onsite courses and two courses at the Wartsila facility in Ft. Lauderdale, FL. The on-site courses are 5 days and 10 days. The Wartsila facility courses are both 5 days. EVR provided an optional adder to include training courses. The offering includes two 10-day courses located at an EVR facility, and two 5-day on-site courses. Both proposer’s offerings were deemed to be acceptable. LTSA Overview An additional item to consider is the capability of each supplier to continue to support maintenance and monitoring of RICE plant operations through a Long-Term Service Agreement (LTSA). It was asked that each vendor provide a proposal for a 5-year LTSA and a 2-year LTSA. The results for what was quoted are in the table below. LTSA and Spare Parts Summary EVR Wartsila Option I: Provide a Five-Year Long-Term Service Agreement (LTSA) $15,912,779 $5,513,000 Option J: Provide a Two-Year Long-Term Service Agreement (LTSA) $1,973,486 Not Quoted 16 C-2520 Letter of Recommendation Date: July 24, 2026 City of Ames Page 7 of 9 After reviewing the LTSA proposals and discussing them in interviews with each vendor, it seems that the scope of parts and services offered under each program are comparable. All LTSA proposals from both vendors were generated using the anticipated operating hours that were provided in the RFP package. The programs mostly include service and spare parts for planned maintenance, and remote monitoring functionalities. The programs would also include shipment of critical spares at commencement of the contract for COA to have on site. As seen in the table above, Wartsila did not provide a cost for a 2-year LTSA. They strongly recommended the 5-year LTSA over the other options since the first major overhaul is expected to occur in the 3–5-year period. This is also the reason why the EVR 5-year program was significantly more expensive than the 2- year program. In general, both LTSA programs were deemed acceptable. The Wartsila 5-year program is more favorable due to its price, which corresponds to $1,102,600 / year for all planned maintenance. The cost of the EVR 5-year program corresponds to $3,182,556 / year. Technical Field Assistance (TFA): Wartsila and EVR both met the specification requirements for TFA and confirmed they will be providing the following support as part of their project technical field assistance for their base offerings. • Technical advisors: Civil, Electrical, Mechanical • Commissioning manager • PLC programmer • NOx advisor • Engine automation and instrumentation tuning Additionally, EVR is offering to provide one (1) person on site for one (1) year to support TFA post commercial operation date (COD). Wartsila did not offer this in their equipment supply contract, but it is included as part of their 5-year LTSA program discussed above. Equipment Delivery Date and Freight EVR has offered a guaranteed FCA shipping date for major equipment (engines and generators) of August 2029. It is assumed that the equipment will take 2-3 months to ship from the FCA port to site, so the delivery to site would be expected to be October – November 2029. Wartsila has offered a guaranteed major equipment DDP delivery date of October 30, 2029. Although the anticipated delivery dates of the equipment are very similar, it is an advantage that Wartsila offers a guaranteed delivery date for when the equipment will be on site, versus EVR’s offering that only guarantees the date that the equipment is shipped from the port. Wartsila included the cost of freight in their proposal while EVR supplied an estimated cost that would be incurred at the times of shipment. Both vendors indicated that any tariffs or import taxes in place at the time of shipment would be the responsibility of COA. Engineering Document Submittal Schedule EVR and Wartsila both took exception to the document submittal schedule provided in the RFP and proposed their own schedules. Through negotiation, document submittal dates were agreed upon with Wartsila. Input has not been provided on the EVR document submittal schedule at the time this letter was 17 C-2520 Letter of Recommendation Date: July 24, 2026 City of Ames Page 8 of 9 written. Further negotiation with EVR would be required for their document submittal schedule to reach an acceptable point. COMMERCIAL EVALUATION The commercial evaluation is being performed by COA commercial and is not included as part of this technical evaluation. EVALUATION SUMMARY S&L developed a scoring criterion to evaluate technical compliance. The table below summarizes this evaluation which shows a total score in favor of Wartsila’s offering. Category Score EVR EVR Comments Wartsila Wartsila Comments Proposal Completeness and but slightly lacking in documentation requirements but slightly lacking in constituents, but lacked in noise emission constituents, but provided Guaranteed FCA date of August 2029 (anticipated delivery of October 2029) Guaranteed DDP date of October 2029 Include core scope Included core scope plus other items for optimized integration Meets most requirements Weaker market presence in US Strong market presence in US representative of high demand from data Most cost-effective after adjustments Total 18 C-2520 Letter of Recommendation Date: July 24, 2026 City of Ames Page 9 of 9 RECOMMENDATION Pending final commercial review by COA, Wartsila is recommended to be the reciprocating internal combustion engines and accompanying equipment supplier. This is due to Wartsila having a stronger technical offering as well as having the lowest evaluated cost. The evaluated cost is currently $69,230,520 (subject to Euro / USD exchange rate). Please contact Ms. Marion Teslik at 312-269-7330 or me if you have any questions concerning this recommendation. Yours very truly, Adam Redd Project Director Enclosure – All Recipients Copies: C. Spence S. Feucht K. Evans D. Kom J. Muschick M. Teslik H. Hudetz C-2520_LOR.docx 19 C-2520 Letter of Recommendation Date: July 24, 2026 Exhibit 1 – Proposer Exception and Clarifications 20 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Wartsila No. Department Spec. Section Comment Requirement Different than Seller's Standard Offering (Y/N) Commercial Impact to Comply (Y/N) Acceptable? Owner / Engineer Responses Response Date Proposer Response Response Date Owner / Engineer Responses Proposer Response 1 General 013216/ 101.2 b5 Only Project Specific documents will require review and resubmittal, Only 1 resubmittal is considered for said documents Y Acceptable 6/12/2026 2 General 013216/ 101.2 C This is not a feasable approach to most equipment and will only be applied after discussion in EKO Y Acceptable 6/12/2026 3 General 013216-2/ 101.3 Wärtsilä shall not be liable for schedule impacts arising from late reviews or delayed approvals -when required- by the Owner or the Owner’s Engineer. Y Acceptable 6/12/2026 4 General 13300/ 101.3 Section 013324 will be superceeded by Wartsila Appendix I - Document Submittal Schedule that will be reviewed after EKO and updated throughtout the project Y See item 30 in questions to bidder tab 6/19/2026 Per Item 27 of the Questions to Propers (Row 30 of the Excel file) The Monthly progress reports will include the Master Document List and Project Schedule will be submitted 30 days after EKO. Preliminary Training Program will be provided 90 days after EKO Wartsilä provides ITP, Engine PCT protocol 30 days before engine PCT, FAT protocols for the control system 30 days before testing and Generator FAT Protocols ahead of the Generator FAT. Site Quality Assurance Documentation (SQAD) will be available after the equipment is delivered to site. 3D model models for Wärtsilä’s scope of supply will be provided 6/25/2026 Document submittal list updated per S&L comments. 5 General 013300/ 102.1-102.3 Wärtsilä uses DCM for document control and document submittals in delivery projects. DCM365 introduction for customer training can be provided to the customer after EKO. DCM has commenting function. By using the commenting function in DCM all stakeholders have at any time access to newest information and there is no need of exchange and manual tracking excel files.  Customer and Customers engineer can get access to the comment section. The system allows to add written comments as well as attachments (e.g. commented drawings). Comments can be exported into an excel at any stage for own archiving purposes. Wärtsilä will use own document numbering and revision system. Customer document identification can be available as metadata in DCM, and on a project front page for each document, but it will not be added to the document header or title block. Using customer document identification in addition to Wärtsilä's own identification will increase cost. Y In Review To be discussed in 7/7 meeting 6/12/2026 Discussed in 7/7 meeting and deemed acceptable. 6 General 013300/ 102.4 - 102.6 Transmittals are prepared per project phase and discipline. The transmittal sheet displays the project name, transmittal number, and date. All documents included in the transmittal are listed with title, document number, revision, and issue purpose. Transmittals are numbered using a single running sequence, with no separation based on phase, discipline, or issue purpose (WAR-CUS-nnnn). All commenting is done by document and not per transmittal. Y Acceptable 6/12/2026 7 General 013300/ 102.7 Preliminary, For Construction and As-Built can be added as stamp on the documents. Issue purposes are mentioned in the transmittal sheet and as metadata in DCM. Wärtsilä's internal document will include Wärtsilä's doc number, other supplier's documents won't be altered to add Wärtsilä reference. Some Certificates will be in the Vendor's local language Y Acceptable 6/12/2026 8 General 013300/ 102.10 References in drawings are done by document ID. Referenced drawings are not added to a drawing. Y Acceptable 6/12/2026 9 General 013300/ 102.12 Comments will be resolved in the next revision of the document and after complete review of the document Y Acceptable 6/12/2026 10 General 013300/ 102.15 Not applicable for all equipment Y Acceptable 6/12/2026 Page 1 of 5 21 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Wartsila 11 General 013300/ 102.16 Some of the submittals will have a history of changes Y All documents should have a history of changes. Please confirm why only "some" is included here. If a document is superseded, it should be identified as superseded by the document number that it has been superseded by. 6/12/2026 Per Item 27 of the Questions to Propers (Row 30 of the Excel file) The Monthly progress reports will include the Master Document List and Project Schedule will be submitted 30 days after EKO. Preliminary Training Program will be provided 90 days after EKO Wartsilä provides ITP, Engine PCT protocol 30 days before engine PCT, FAT protocols for the control system 30 days before testing and Generator FAT Protocols ahead of the Generator FAT. Site Quality Assurance Documentation (SQAD) will be available after the equipment is delivered to site. 3D model models for Wärtsilä’s scope of supply will be provided 6/25/2026 Acceptable 12 General 013300/ 102.17 Review time is recommended to be 14 calendar days, working days are too difficult to specify, as they are different in different parts of the world. Y Acceptable 6/12/2026 Stamped document can be uploaded to the comments as attachment. Wärtsilä uses following responses: 14 General 013300/ 102.20 Wärtsilä is not responsible for delays resulting from design changes submitted late by the Owner or the Owner’s Engineer. Y Acceptable 6/12/2026 15 General 013300/ 102.24 Wärtsilä documentation is available in DCM and can be exported by customer Design documentation Shared in design in DCM and can be exported per transmittal or as one package. Y Acceptable 6/12/2026 16 General 013300/ 103.2 Updated 3D models will be submitted as appropriate Y Acceptable 6/12/2026 17 General 13323/ 102.2 a As Fabricated drawings cannot be submitted, As built will be submitted post commissioning Y Acceptable 6/12/2026 18 I&C 13323/ 102.2 b Control Settings aren't provided to end users, this requires signing a EULA. After Sigining EULA access will be limited to read only until the engines are out of Warranty. Y In Review Please confirm if control settings will be provided to end user after warranty period. To be discussed during 7/7 meeting 6/12/2026 Discussed in 7/7 meeting and deemed acceptable. 19 General 13323/ 102.2 d2 This will Only apply to documents engineered to order rather than standard documentation Y Acceptable 6/12/2026 20 General 13323/ 102.2 d2.5 & d2.6 Wärtsilä will use own document numbering and revision system. The filename is DocumentID and Revision (e.g. Pnnnnn-WAR-mmmm_rr, whereas nnnnn is the project number, mmmm a running number and rr the revision (from 01 upwards)) followed by the file extension (mainly pdf). The DocumentID and Revision is stamped in the top right corner. Y Acceptable 7/1/2026 21 General 13323/ 103.1 a Wärtsilä will submit the standard equipment O&M Manuals - Project specific manuals won't be created, As built drawing aren't a part of the O&M Manuals and will be submitted separetly. Y Acceptable 6/12/2026 22 General 13323/ 103.1B 13324 Shall be superceeded with Appendix I Y See item 4 6/12/2026 Y Acceptable 6/12/2026 013300/ 102.1913 General Page 2 of 5 22 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Wartsila 23 General 13323/ 103.2 Wärtsilä will submit the standard equipment O&M Manuals. The QC Check list by suppliers will be requested but will only be submitted if the supplier approves the release of the document. OEM documentation is checked by Supplier Document Quality Control team. Y Acceptable 6/12/2026 24 General 13323/ 103.3 Wärtsilä Provides a customizable training curriculum to customer through Wärtsilä land and sea academy that is shared before the training is scheduled Y Acceptable 6/12/2026 25 General 13323/ 103.4/ 103.4 a Wärtsilä will submit the standard equipment O&M Manuals - Project specific manuals won't be created. Y Acceptable 6/12/2026 26 General 13323/ 103.7 The O&M Manual will be published on DCM Customer Site per system Y Acceptable 6/12/2026 27 General 13323/ 103.8 Wärtsilä will submit the standard equipment O&M Manuals - Project specific manuals won't be created nor redaction will performed, As built O&M Manuals and will be submitted separetly post commissioning Y Acceptable 6/12/2026 28 General 13323/ 103.9 Wärtsilä will submit the standard equipment O&M Manuals Y Acceptable 6/12/2026 29 General 13323/ 103.12 O&M Manuals will follow Warsila's standards and shall not be modified Y Acceptable 6/12/2026 30 General 13323/ 103.13 O&M Manuals will be submitted in a non editable format, standard and on customizable manuals will be submitted Y Acceptable 6/12/2026 31 General 13323/ 104.2 O&M Manuals are delivered 30 days before Commissioning, Draft manuals can be submitted 30 days after Delivery of Engines and will follow Wärtsilä's standards/ Y Acceptable under conditions that Wartsila will provide example O&M manual for reference only during document review cycle. 7/1/2026 32 General 13323/ 104.3 O&M Manuals will follow Wärtsilä's standards and shall not be modified, all systems will have O&M Manuals Y Acceptable 6/12/2026 33 General 13323/ 104.4 a & b Preliminary O&M Manual will be submitted in PDF format, 30 days after engine delivery Electronic formatting will follow Wärtsilä's sepcifications and will be submitted in pdf format and can't be modified. Post commissioning comments will be implemented in the As built version of the Manuals. Y Not Acceptable. Preliminary O&M is required during detailed design project phase for reference. Please confirm this can be provided. 6/12/2026 Wartsila can provide and example O&M manual from a very similar scope project. The project preliminary O&M will be submitted 30 days after engine delivery. 6/25/2026 Acceptable under conditions that Wartsila will provide example O&M manual for reference only during document review cycle. 7/1/2026 34 I&C 13323/ 105.1 A device list will be submitted to City of Ames NOT A DATABASE Y Acceptable as long as device list is provided in native format (excel or access) 7/1/2026 35 General 13323/ 105.2 The device list will be submitted twice Y Acceptable 6/12/2026 36 General 13323/ 105.3 Customer should assume that all equipment shall be installed by the installation contractor, Only the the engine assembly will be performed by Wärtsilä personell. Wärtsilä provides advisors to advice the installation contractor during the installation of equipment. Y Acceptable 6/12/2026 37 General 13324/ 101.5 The MDL is created within 30 days of NTP and after EKO and is updated throughtout the project life. Y Acceptable 6/12/2026 38 General 13324/ 101.6a The MDL is created per decipline and includes the following information : System/Category, Document type, Name, Supplier if not Wärtsilä drawing, Doc ID, Rev. ID, DCM Doc ID, Submittal Package , listing of the customer input required and comments trelated to the document submittal Y Acceptable 6/12/2026 39 General 13324/ 101.7 The MDL is created per decipline and includes the following information : System/Category, Document type, Name, Supplier if not Wärtsilä drawing, Doc ID, Rev. ID, DCM Doc ID, Submittal Package , listing of the customer input required and comments trelated to the document submittal Y Acceptable 6/12/2026 40 General 13324/ 102 The documents in Table 102-1 are going to be replaced by Appendix I Y See item 4 6/12/2026 41 General Section 14500 Wärtsilä will follow our internal Quality assurance and Quality control Protocol Y Acceptable 6/12/2026 42 General 014500 / 101.4 Suppliers contracted by Wärtsilä will adhere to Wärtsilä's previously agreed upon standards Y Acceptable 6/12/2026 43 General 014500 / 102.1 Wärtsilä will submit the inspection and test plan, not manuals Y Acceptable 6/12/2026 44 General 014500 / 104.3 Standard Wärtsilä quality procedure will be followed, nothing will be modified.Y Acceptable 6/12/2026 45 General 14500/102.1 Wärtsilä will provide a QEHS for information ONLY Y Acceptable 6/12/2026 46 General 14500/102.3 Non- standard requirement. Possible point of delay for the production of equipment. Additional cost in case of this additional requirements provided before acceptance. Which can be agreed on post award The requested data can be submitted for information only. Y Acceptable 7/1/2026 47 General 14500/102.3 a This is a Non Standard requirement, Only engine and auxilary platforms & support steel structure WPS and PQRs can be provided on additional cost. Which can be agreed on post award Y Please confirm if there is a cost associated with this if documents are provided for infomration only. 7/1/2026 Can be discussed post award if required. Acceptable 48 General 14500/102.4 Not possible for all the materials. Material certificate will be provided according to the pertaining standard/codes of the equipment type. The requested data can be submitted for information only when availalbe. Y Acceptable 6/12/2026 49 General 14500/102.5 Test reports will be provided along with the final FAT documentation. Any intermediate "review and acceptance" would halt the production. Y Acceptable 6/12/2026 50 General 14500/102.7 Witness points should be mutually agreed by both parties and documented in the ITP which should be agreed within 30 days of contract signing. Y To be discussed in 7/7 meeting 7/1/2026 Discussed in 7/7 meeting. COA can witness FAT, generator tests, and/or engine tests. Acceptable 51 General 14500/103 Manufacturing won't be witnessed, There will be a witness point possible for FAT only, not during manufacturing. Documents are not provided for verification during production. Agreed documents will be provided along with the final documentation. Manufacturing ITP will be provided for information. only PCT/FAT reports are provided. Other in-house production records can be viewed during FAT/ PCT. if Performed Y Acceptable 7/1/2026 Page 3 of 5 23 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Wartsila 52 General 016131 / 103.3 Name Plates shall follow Wärtsilä's naming convention; Engine name plates will have engine type, Serial number, Power, manufactrung month/year and rpm. Y Acceptable to use Wartsila naming convention. Please confirm that tags will also include manufacturers name and project number. 6/19/2026 Wartsila confirms the tags will have the manufactures names. We can not confirm the project number will on compenent tags. We will request to be included where possible. However, for some components they can not include this. We can further discuss this on 7-JUL. 6/25/2026 Acceptable 53 General 016500 / 102 The 18V50DF engine will be disassembled for transportation into major components; the base frame, engine block, turbo charge and air reciever. Wärtsilä field service engineers will reassemble the Engine which will then be staged until the last engine is assembled. The minimum site requirements are shared in Appendix D Y Acceptable 6/12/2026 54 General 016500/ 103.2 The Equipment is transported via a vessel from Finland then a train and/or trucks, a GPS tracker can be added to the engines while being transported via rail. The three Directional impact recorders cannot be provided. Y To be discussed in 7/7 meeting 7/1/2026 Discussed in 7/7 meeting. Impact recorders can not be provided for engine transport, but can be provided for generator transport. Acceptable 55 General 016500/ 103.4 Equipment other than the engine will be packed in containers, pallets and boxes. Y Acceptable 6/12/2026 56 General 016500/ 103.10 - 103.11 Containers shall be identified with a weather proof marking Packing lists will be secured on the outside Y Acceptable 6/12/2026 57 General 016500/ 104.2 A notice of shipment will be sent to the buyer and packing lists and shall follow Wärtsilä specification, the BOL description shall follow the guidance of Warsila's importation team. A Packing list will accompany the shipment and will be submitted 15 days before shipment Y Acceptable 6/12/2026 58 General 016500/ 104.3 The Purchaser's site manager will be notified of the delivery date as soon as it is determined, notification of delivery time within one hour 24 hours in advance is not feasable due to the transportation method. Site will need to be notified in advance of delivery so contractor is available for offloading. Please confirm what advanced notice will be available. 6/12/2026 COA will receive weekly updates from our freight forwarder and the project team once the shipment has departed Vaasa port. 6/25/2026 To be discussed in 7/7 meeting 59 General 016500/ 104.5 This will be governed by the contract. Y Acceptable 6/12/2026 60 General 016500/ 105.3a It is the responsibility of the buyer to fascilitate and provide access to the site Y Acceptable 6/12/2026 61 General 016500/ 105.4 The responsibility of storing the engines after assembly will be governed by the contract. Y Acceptable 6/12/2026 62 General 016500/ 105.6 The Supplier is responsible for the delivery of engines on the foundation, the Balance of plant shall be the responsibility of the buyer to unload and maintain once delivered at site. The division of responsibility is shown on Appendix A and will be governed by the contract. Y Acceptable 6/12/2026 63 General 016500/ 106.1 The owner shall inspect the equipment and can be accompanied by the installation contractor Y Acceptable 6/12/2026 64 General 016500/ 106.2 Product, equipment and material inspection shall occur in the presence of the supplier site representative Y Acceptable 6/12/2026 65 General 016500/ 106.3 The Genset delivery point is on Foundation, while the balance of plant delivery point is site once the BOP has been delivered it is the responsibility of the site owner or owner representative to track any of the material as they are being pulled out to be used. No inventory management system will be used Y Acceptable 6/12/2026 66 General 99113 An exception is taken to the entire Article Wärtsilä uses standard coating specifications and protocal and cannot comply with article 99113. Wärtsilä's Coating specifications and protocol can be provided after EKO - Specifications are compliants with the EU specifications Y Acceptable 6/12/2026 67 General 99113/ 102 Wärtsilä Uses International/European codes Y Acceptable 6/12/2026 68 General 99113/ 103 Wärtsilä is providing the preliminary ITP as appendix K, QA cannot be shared for sub suppliers unless approved by them. Y Acceptable 6/12/2026 69 General 099113/ 104 Wärtsilä Uses International/European codes and follows internal QA/QC process Wärtsilä's Coating specifications and protocol can be provided after EKO Y Acceptable 6/12/2026 70 General 099113/ 308.1 Repair of damaged coating will occur at site and will be performed by the installer via a change order directed towards the responsible party. Y Acceptable 6/12/2026 71 I&C 481127 / 103 B6 Control functionality is not provided from the Local Generation Control Panel located at the engine hall. However the description in this section refers to control functionality that is implemented through the Generating Control Panel, typically installed at the Control Room Y Acceptable 6/12/2026 72 I&C 481127 / 103.2 A2,A3,A4A fault-tolerant design philosophy is not included.Y Acceptable 6/12/2026 73 I&C 481127 / 103.3 A3.5.2 Our standard, proven design does not employ HART transmitters; therefore, no HART modules are included in the Common Control System.Y Acceptable 7/1/2026 74 I&C 481127 / 103.4 A3.5.1 In alignment with our standard design, HART transmitters are not utilized. As a result, the Local Generating Set Control Panel does not include HART modules. Y Acceptable 7/1/2026 75 Electrical 481127 / 103.4 A5 Our standard, proven design does not use SEL meters; Crompton or DEIF meters will be provided.Y Can you provide a cost adder to use SEL relays instead? 7/1/2026 SEL relays only used for protection relays Acceptable 76 Electrical 481127 / 103.4 A6 Synchronization will be accomplished via the AVR in combination with a DEIF Sync Check Relay. An SEL synchronizing relay is not included.Y Can you provide a cost adder to use SEL relays instead? 7/1/2026 SEL relays only used for protection relays Acceptable Page 4 of 5 24 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Wartsila 77 I&C 481127 / 103.6 B Our standard, proven design does not employ SOE modules, however alarm time stamp is done at the device level (as Protection relays, PLC’s, Engine controller [governor]) as well our design has RAID 5 configuration. Y Acceptable 6/16/2026 78 I&C 481127 / 103.9 C1.2.1 Our standard, proven design does not employ HART-type transmitters and transmitters with local displays. Y Acceptable 6/16/2026 79 I&C 481127 / 103.9 C1.2.2 Wire labeling is unique and consistent, with identical numbering at both ends.Y Acceptable 6/16/2026 80 I&C 481127 / 103.9 C1.4 Thermocouples are supplied only for engine cylinders. All other temperature measurements are RTDs. Y Acceptable 6/16/2026 81 I&C 481127 / 103.9 C1.5 Only when is required by Code Redundancy and will be supplied. Our proven design mitigates the single point of failure from shutting down the plant however do not always have redundant instrumentation. Y Acceptable 6/16/2026 82 I&C Appendix 1 D1.7.1 Only communication cables will be supplied by Wärtsilä Y Acceptable 6/16/2026 83 Electrical Appendix 1 D2.10 An Auxiliary Power Study in ETAP is not included.Y Clarify, an aux power study is required if Wartsila is to provide the electrical equipment as shown in Option F. 6/16/2026 All documentation is shared in pdf format, OP895963-0146, shows the supply documents, however they are listed below. •Simulation Model Report •MV 1-Line (Simple) •MV 1-line (Detailed) •Short-Circuit Calculation Report •Short-Circuit Appendix •Load Flow Calculation Report •Load Flow Calculation Appendix •CT Sizing Calculation •MV Protection Relay Settings Calculations •Arc-Flash Analysis Report •LV Breaker Settings 6/25/2026 Please provide the native files the documentation is based on for future revisions. For example, if the city were to add future units, these could be included in the model. Aux power studies only provded as PDF 84 Commercial 7.4 The Warranty included in this offer is as per Wartsila Warranty defined in Section 10.2 and 10.3 of the WNA draft contract proposal. The warranty shall apply for a period ending twenty-four (24) months after the Provisional Acceptance Date or thirty (30) months after the arrival of the Generator Sets in the Country, whichever occurs first (the “Primary Warranty Period”). The warranty period with respect to parts which have been repaired or replaced during the Primary Warranty Period shall be six (6) months from the date of repair or replacement or until the expiration of the Primary Warranty Period, whichever occurs later (the “Extended Warranty Period”); provided, however, that in no event shall the Extended Warranty Period extend beyond thirty-six (36) months after the Primary Warranty Period began. The Extended Warranty Period applies only to parts or components of the Equipment which are repaired or replaced during the Primary Warranty Period and not to the remaining parts or components or other items of Equipment. Y See Questions tab Item 2 for question on warranty. 6/12/2026 The 5 year LTSA does not extend the 2 year warranty included in the equipment contract. The LTSA does provide a separate warranty on the parts and services that are provided. 6/25/2026 Acceptable 85 Commercial 4 Contract Price, Progress Payments, Delivery/ 4.3 Payment terms will be in accordance with Exhibit 2 - Milestone Payments In Review - pending COA input - to be discussed 7/7 7/1/2026 86 Commercial Standard Terms & ConditionsThe Wartsila Equipment Supply Contract (Draft) submitted with Wartsila Firm Offer will replace the Standard Terms and Conditions except where otherwise noted. In Review - pending COA input - to be discussed 7/7 7/1/2026 87 Commercial Special Conditions for RICE EngineThe Wartsila Equipment Supply Contract (Draft) submitted with Wartsila Firm Offer will replace the Standard Terms and Conditions except where otherwise noted. In Review - pending COA input - to be discussed 7/7 7/1/2026 88 Commercial Special Conditions Insurance Requirements for Supplier Applied with some modifications per WNA Firm Offer Exhibit 6 - Insurance Requirement In Review - pending COA input - to be discussed 7/7 7/1/2026 Page 5 of 5 25 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Everllence No. Department Comment Requirement Different than Seller's Standard Offering (Y/N) Commercial Impact to Comply (Y/N) Acceptable? Owner / Engineer Responses Response Date Proposer Response Response Date Owner / Engineer Responses Proposer Response 1 Mechanical EVR guarantees noise emissions for its scope of supply according to EVR 'Sound Emission List'. Y Acceptable 6/12/2026 2 General Applying Codes and Standards for project scope of supply are according to EVR 'Technical Specification'. Y Acceptable 6/12/2026 3 General LOTO concept is not part of EVR standard design. Requirements and impacts shall be discussed prior to any design change Y Acceptable 6/12/2026 4 Electrical terminal boxes comply with NEMA 3 standard.Y Clarify which terminal boxes this applies to. Term boxes outdoors, preference is NEMA 3R, those in hazardous areas NEMA 4X. 6/16/2026 Based on our IP protection classifications, we need to evaluate the corresponding NEMA ratings. According to our gas safety concept, there are no terminal boxes in hazardous areas. Therefore, terminal boxes with a NEMA 4X rating are not required. 6/26/2026 Acceptable 5 General verification of 3rd party (PE stamp) of any module/system/structure is not offered; exception: genset foundation documentation Y Acceptable 6/12/2026 6 Mechanical Lube oil pump will be shipped loose installed by Others due to transport reasons Y Please confirm if lube oil pumps provided will be skid mounted with appropriate isolation and instrumentation. If not provided, please provide scope adjustment to include skid mounted pumps with components for isolation and instrumentation included within the pump skid boundary. 6/12/2026 Lube oil supply or transfer pumps are simple pumps that are not modularised and are part of the plant piping. They have no isolation valves or instruments, as these are also part of the plant piping. 6/23/2026 Acceptable. 7 Mechanical EVR will not offer lube oil storage and maintenance tanks, forwarding pump module will be provided. Y Additionally, Please confirm if an option can be provided for Lube Oil Bulk Storage tanks. See Questions tab Item 7. 6/12/2026 According to the design philosophy, the EPC/construction company is responsible for supplying the tanks. 6/23/2026 Acceptable. 8 Mechanical EVR will not offer reagent storage tanks, forwarding pump module will be provided. Y Please confirm if an option can be provided for reagent storage tank. See Questions tab Item 8. 6/12/2026 According to the design philosophy, the EPC/construction company is responsible for supplying the tanks. 6/23/2026 Acceptable. 9 Mechanical EVR will not offer any type of ventilation units for power house or auxiliary buildings Y Please confirm if an option to supply these units can be provided. See Questions tab Item 10. 6/12/2026 According to the design philosophy, the EPC/construction company is responsible for supplying all building ventilation systems and HVAC. 6/23/2026 Acceptable. 10 Mechanical EVR will not offer a engine coolant heat recovery system as the engine does not require preheating of the intake air. As a result, heat recovery benefits decrease significantly Y Acceptable. 6/12/2026 11 Mechanical EVR will not offer SCR-preheating system, as operating temperature will be reached in approx. 30 mins Y Acceptable. 6/12/2026 12 Mechanical Clarification: An intake air heating is even with temperatures down to -40°F not needed and will not be offered. Y Acceptable. 6/12/2026 13 Mechanical Optional low noise components are offered by EVR. Based on an acoustic study and its findings, further optimizations can be made. Possible resulting costs are not included in the EVR quote. Please confirm lowest noise option available is being offered for radiator. 6/12/2026 The standard sound power level for the quoted engine size is offered. Further reductions will be discussed in detail, as different levels require different improvements to the cooler design and/or sizing (quantity of units). 6/23/2026 To be discussed in 7/15 meeting Discussed in 7/15 meeting - lower noise options available, but must be discussed more 14 Mechanical P&IDs will be delivered during project execution. The EVR offer includes PFDs Y Acceptable 6/12/2026 15 Mechanical All specifications for consumables such as fuel gas, fuel oil, urea-solution, ethylene glycol and lube oil, are specified by EVR. Y Acceptable 6/12/2026 Page 1 of 9 26 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Everllence No. Department Comment Requirement Different than Seller's Standard Offering (Y/N) Commercial Impact to Comply (Y/N) Acceptable? Owner / Engineer Responses Response Date Proposer Response Response Date Owner / Engineer Responses Proposer Response 16 General The offer includes a list of the auxiliary electric loads. Indicative numbers for water and compressed air are given with the PFDs. Y Acceptable 7/1/2026 17 General The following will not be provided by EVR with the offer: Equipment performance curves and data sheets for operation at the provided conditions included in the Specification, including speed torque curves for the equipment. Y Please confirm why this information cannot be provided. 6/12/2026 The main characteristics of the generator are included in our technical specification. However, specific equipment is subject to the main requirements of the power plant and may change during the basic and detail engineering phases. 6/23/2026 Acceptable 18 General Planning and performance data as per EVR technical specification and its attachments Y Please confirm the following will be provided post award with document submittals "Curves for: start-up and shutdown; Load vs. Time and Emission Rates (NOX, CO, VOC), Exhaust Flow Rate, and Exhaust Temperature vs. Load" 7/1/2026 Ramping and Loading Curves" (start-up and shut-down, load over time) and emission rates are part of our technical specification and were already provided as part of our offer. Exhaust flow rate and temperature over load are part of the "Planning Data" and could be provided on short notice. 6/23/2026 Acceptable. 19 General EVR will submit standard documents without external certification. Per article 102.23 in section 013300, drawings and documents shall be certified and stamped in accordance with the state where the project is being performed. This requirement apples to structural steel drawings and pressure vessels. Please confirm this requirement can be met 7/1/2026 20 General The EVR offer includes 3D-Models based on the RFP requirements. Additional requirements are not considered. Y Acceptable. 6/12/2026 21 General EVR will provide an Engineering Documentation Submittal List (EDSL) which shall replace Table 102-1. See item 51 in the questions to propser tab. 6/19/2026 Answer in item 51 in the questions to propser tab. 6/23/2026 22 Structural EVR will provide their equipment with corrosion protection according to EVR guideline <Q10.09028-5013>, based on ISO 12944, with C3-H for inside and outside application. Structural Steel will be hot dip galvanized. Y Acceptable 7/1/2026 23 General EVR can not guarantee that each supplied equipment is capable of a mechanical and electrical isolation. Acceptable for mechanical. In Review for electrical. 7/1/2026 24 General Clarification: EVR is only responsible for delivered scope. The scope is defined in the EVR-Document “Division Of Works” (DoW). Y Agreed, but based on final scope agreed upon at time of award. 6/12/2026 Ok 6/23/2026 Acceptable. 25 Structural The alternator is mounted on a concrete foundation. The alternator has no connection to the welded steel base frame of the engine. Y Acceptable 6/12/2026 26 General Generator exhaust air will be blown vertically to the top. Position of ridge vent has to be defined according to generator positioning and overall flow requirements and restrictions proposed with the help of a CFD study (not in EVR scope) Y Acceptable. 6/12/2026 27 Mechanical Clarification: EVR will provide a recommendation about the crane coverage and rating requirements but since the crane is not in EVR scope, no guarantees are provided for this. Y Acceptable. 6/12/2026 Page 2 of 9 27 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Everllence No. Department Comment Requirement Different than Seller's Standard Offering (Y/N) Commercial Impact to Comply (Y/N) Acceptable? Owner / Engineer Responses Response Date Proposer Response Response Date Owner / Engineer Responses Proposer Response 28 Structural EVR will provide the standard design for platforms. Here, there are a few rarely used platforms that can only be reached by ladder. Y Please confirm which platforms will included stair access and which are currently assumed to provided ladder access. Preference is for stairs but will need to be reviewed. 7/1/2026 Engine and auxiliary service platform inside powerhouse: - Levels 1 and 2: Stairs - Level 3: By ladder. SCR and intake air service platform: - By stairs for all levels. Exhaust gas stack: - No access. Radiator service platform: - By stairs. 6/23/2026 Acceptable. 29 Mechanical The provided EVR gas control line is only able to fulfill the requested requirements if the fuel gas upstream of it meets certain pre conditions e.g. pressure and temperature range. The pre conditions are defined in the EVR technical specification. Y Acceptable. 6/12/2026 30 Mechanical Emergency shutdown valve with automatic vent valve will not be provided by EVR. Y Please confirm if option for emergency shutdown valve with automatic vent valve can be provided. 6/12/2026 A plant-related fuel gas shut-off valve with automatic venting will not be provided. 6/23/2026 Acceptable. 31 I&C EVR flow meter will be of type 'flowsic500', which is self- monitoring but not officially called OBMV. No trim pressure regulation (not required for metering), no automatic vent valving (plant scope), not automatic isolation (plant scope) will be included. Y Flow meter type in review. If no trim pressure regulation is required at the engine units that is acceptable. See item 30 above regarding automatic vent valving and isolation. 6/12/2026 Noted. For more information, please see the answer to item 30. 6/23/2026 Acceptable. 32 Mechanical Shut off valves for each engine and for common fuel line will not be provided by EVR. Y See item 30 above. 6/12/2026 ok 6/23/2026 Acceptable. 33 I&C EVR will offer their standard flow meter which has the following main features: Coriolis mass flow meter with transmitter, accuracy at pump nominal capacity +/- 0.5%, calibration certificate, pressure drop of less than 0.3 bar at 70°C. Y Acceptable 6/16/2026 34 I&C Fuel oil flow meter will not have 40CFR60 certification.Y Acceptable 6/19/2026 35 Mechanical Fuel oil forwarding pumps, which have the purpose to transport fuel from storage tank to engine booster cycles, will be designed for indoor installation. The recommended EVR layout places the pump in the pump house next to the unloading area. Y See item 16 in questions tab. 6/12/2026 See answer in item 16 in Questions tab. 6/23/2026 36 Civil The foundations have to be designed meeting pipe and utility racks requirements. Y Acceptable 6/12/2026 37 Mechanical EVR will not provide storage tanks for lube oil.Y See Questions tab item 7 6/12/2026 See answer in Questions tab item 7 6/23/2026 Acceptable 38 Mechanical The mobile pump units will not be provided by EVR.Y See Questions tab item 19 6/12/2026 See answer in Questions tab item 19 6/23/2026 Acceptable 39 Mechanical To keep the piping system simple, EVR will provide two lube oil pumps for the connection between storage tank to RICE and two lube oil pumps between maintenance tank and RICE, each pump is 100% redundant. Y See Questions tab item 12 6/12/2026 See answer in Questions tab item 12 6/23/2026 Acceptable 40 Mechanical EVR will provide pumps as single components to be installed in free piping. The other components suction side strainer, filtration, thermometer, temperature transmitter, piping, fittings, valves, specialties, electric heater, and a control panel will not be provided by EVR. Y See Questions tab item 12 6/12/2026 See answer in Questions tab item 12 6/23/2026 Acceptable 41 Mechanical EVR concept does not consider filtering in lube oil supply line. Filtering is applied in the lube oil cycle and the cleaning is done in the secondary cycle (See Lube oil PFD). Y Acceptable 6/12/2026 42 Mechanical For starting air EVR provides one skid with two mounted compressors and each compressor has 100% of the needed capacity. Y Acceptable 6/12/2026 43 Mechanical The air receivers provide six starts in total. Two receivers with 5.500 ltr each are foreseen. Y Acceptable 6/12/2026 Page 3 of 9 28 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Everllence No. Department Comment Requirement Different than Seller's Standard Offering (Y/N) Commercial Impact to Comply (Y/N) Acceptable? Owner / Engineer Responses Response Date Proposer Response Response Date Owner / Engineer Responses Proposer Response 44 Mechanical Each by EVR provided starting air compressor can be electrical isolated. For mechanical isolation, manual shut off valves are mounted at the compressors outlet. Y Acceptable 6/12/2026 45 Mechanical A automatically disengage of the starting pinions is not needed and not provided by EVR. The starting air compressors operate independently from the RICE engines and their starts. The compressors are controlled by the pressure of the starting air receivers. Y Acceptable 6/12/2026 46 Mechanical From EVR provided starting air compressors will not be equipped with exhaust silencer and vapor arrestor. Y Please confirm if option can be provided to reduce Starting air Compressor dB(A) provided in Annex 9 - Equipment Sound List. 6/12/2026 We can offer optional encapsulation of starting air compressor modules. 6/23/2026 To be discussed in 7/15 meeting Discussed in 7/15 interview and deemed not required 47 Mechanical From EVR provided starting air receivers will be equipped with pedestals instead of support base rings. Y Acceptable 6/12/2026 48 Mechanical Instead of a manhole, an inspection hole will be part of the starting air receivers. Vacuum relief valve will not be included as operation range will be 15-30 bar(g). Ladders, handrails, support clips for piping, conduit will not be included in EVR scope. Y Acceptable 6/12/2026 49 Mechanical The starting air receivers will not have a manhole, they are equipped with a inspection hole with a size of 15”. Y Acceptable 6/12/2026 50 Mechanical The EVR concept uses the atomization air compressors also to generate instrument air. The requested redundancy for instrument air compressors is not applicable. The atomization air compressors are designed to fulfill two times 100% of the needed air which is atomization air plus instrument air (instrument air is also called control air in EVR terminology). Y Acceptable; however, please confirm if additional compressor capacity can be provided to support 100 scfm of periodic service air usage. 6/12/2026 Confirmed. Additional 100 SCFM are included in the compressor capacity. 6/23/2026 Acceptable 51 Mechanical The EVR layout recommends to install the compressor in a compressor house and not inside of the power house. The compressors are not designed for ambient temperatures above 40°C (104°F). Y Please confirm if an alternative option can be provide that would allow for the compressors to be located internal to the engine hall. 6/12/2026 Compressor units must be installed in an air-conditioned room to maintain the required maximum temperature level, taking the treatment process into account. This requires installation in a specific compressor building or an extension of the compressor room within the E-Annex. However, this solution may directly lead to a larger E-Annex, which could be avoided by planning a "low-budget" compressor house. 6/23/2026 To be discussed in 7/15 meeting Discussed in 7/15 meeting. Compressors should be located in a dedicated compressor room. 52 Mechanical Atomisation air modules will be provided as single modules. Electrical and mechanical isolation will be possible. Y Acceptable 6/12/2026 53 Mechanical Climatic design conditions for compressors are given in EVR technical specification and have to be fulfilled. Y See item 51 above. 6/12/2026 See answer in item 51. 6/23/2026 To be discussed in 7/15 meeting Discussed in 7/15 meeting. Compressors should be located in a dedicated compressor room. 54 Mechanical Since a desiccant air dyer is used, no E-stop button near the front interface for emergency stopping is by EVR considered. The only moving parts are changeover valves. Y Acceptable 6/12/2026 55 Mechanical For mechanical isolation only manual shutoff valves at the compressor’s outlet are provided. Y Acceptable 6/12/2026 Page 4 of 9 29 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Everllence No. Department Comment Requirement Different than Seller's Standard Offering (Y/N) Commercial Impact to Comply (Y/N) Acceptable? Owner / Engineer Responses Response Date Proposer Response Response Date Owner / Engineer Responses Proposer Response 56 Mechanical The EVR layout recommends to install the instrument air dryers in a compressor house and not inside of the power house. The modules are not designed for ambient temperatures above 40°C (104°F). Climatic design conditions are given in EVR technical specification and have to be fulfilled. Y See item 51 above. 6/12/2026 See answer in item 51. 6/23/2026 To be discussed in 7/15 meeting Discussed in 7/15 meeting. Compressors and associated equipment should be located in a dedicated compressor room. 57 Mechanical If the stamp is due to the low volume not required by law, EVR will deliver it without stamp. Y Stamps are required for pressure vessels above 15 psi. Please confirm this will be provided. 6/12/2026 will be provided 6/23/2026 Acceptable 58 Mechanical Technical features like velocity will follow subsuppliers standard design. Y Acceptable 6/12/2026 59 Mechanical Technical execution will follow subsuppliers standard design. Y Acceptable 6/12/2026 60 Mechanical Piping will be made of carbon steel.Y Please confirm if an option can be provided for system to be provided in stainless steel. 6/12/2026 We see no need for an air system with stainless steel piping. Standardized modules and components are made with carbon steel. The system includes an oil and water separator, as well as an air dryer. 6/23/2026 Acceptable 61 Mechanical The filters will remove only water, oil and particles.Y Acceptable 6/12/2026 62 Mechanical All filters will be designed according to ISO 8573-1. The specific compressed air requirements are defined in the EVR Technical specification in the chapter compressed air. Y Acceptable 6/12/2026 63 Mechanical Filters will not be equipped with isolation and bleed valves.Y Acceptable 7/1/2026 64 Mechanical EVR will provide two receivers with 5000 ltr. for atomization air which will also be used by instrumentation air. Y Acceptable 6/12/2026 65 Mechanical Instrument and atomization air receivers will be equipped with pedestals instead of support base rings Y Acceptable 6/12/2026 66 Mechanical Instead of manhole an inspection hole will be part of the atomization air receivers. Ladders, handrails, support clips for piping and conduit will not be included. Y Acceptable 6/12/2026 67 Mechanical For EVR RICE units, ethylene glycol has to be used for anti- freezing. Propylene glycol is not permitted. To be discussed in 7/15 meeting 7/1/2026 68 Mechanical The cooling system will be controlled by motor driven 3 - way-valves as defined in b3.1. Thermostatic valves will not be needed and not delivered. Y Acceptable 7/1/2026 69 Mechanical Clarification: thermal short circuit is not an issue of the cooling water radiators if linear inlet and outlet air flow is provided. This has to be assured by appropiate alignment of the power plant. Therefor EVR recommends to carry out a CFD analysis of the plant configuration (by others). Y Acceptable 6/12/2026 70 I&C Cooling pumps will not be equipped with vibration and axial position transmitters. Y Acceptable 6/16/2026 71 I&C Vibration switches will not be in scope of EVR supply.Y Acceptable 6/12/2026 72 I&C Coolant pumps will not be equipped with bearing and motor temperature transmitters. Y Acceptable 6/12/2026 73 Mechanical Intake air heaters are not needed and therefor not provided. Y Acceptable 6/12/2026 74 Mechanical The size of the maintenance water tank is designed to hold the coolant from single sections of the RICE cooling. The tank is not designed to hold the whole coolant of one engine. Y Acceptable 6/12/2026 75 Mechanical The piping material to mechanically lock the maintenance water tank is not part of EVR scope. Y Acceptable 6/12/2026 Page 5 of 9 30 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Everllence No. Department Comment Requirement Different than Seller's Standard Offering (Y/N) Commercial Impact to Comply (Y/N) Acceptable? Owner / Engineer Responses Response Date Proposer Response Response Date Owner / Engineer Responses Proposer Response 76 I&C The maintenance water pump will not include flow transmitters. Y Acceptable 6/16/2026 77 Mechanical Clarification: Intake air modules will be equipped with snow protection. This will be a non-movable louvre or hood solution. Y Acceptable 6/12/2026 78 Mechanical Pocket filters (dry type) will be part of the intake air module which is positioned close to the power house wall. Y Acceptable 6/12/2026 79 Electrical intake air module area contains no hazardous zone, explosion proof components are not foreseen Y Acceptable 6/12/2026 80 Mechanical Clarification: The test ports will be located near the ground in horizontal ducting. Please confirm if test ports can be provided on the stack as well. Test port locations must meet EPA method 1 requirements. 6/19/2026 not with current design: - vertical exhaust gas silencer doesn't allow for test ports after silencer outlet with current height --> extension of ducting (outlet height) and steel structure necessary - with test ports at horizontal ducting there is no need for access to the top of the chimney --> redesign of steel structure necessary EPA method 1 requires 2D+0.5D in minimum. Our design is based on 3D+1D. This shall be enough in our opinion, please advice 6/23/2026 To be discussed in 7/15 meeting Discussed in 7/15 meeting. Current design is acceptable and can be adjusted post award if needed. 81 Mechanical design and delivery of exhaust gas insulation is by others.Y Acceptable 6/12/2026 82 Mechanical The offer includes a stack described as per EVR Layout Proposal and Technical Specification. Y Acceptable 7/1/2026 83 Mechanical Exhaust gas test ports will be located near the ground in horizontal ducting. Test ports are not part of the stack Y See item 80 6/19/2026 see answer to item 80 6/23/2026 Acceptable 84 Mechanical Drain piping and drain pot are not in the scope of EVR.Y Acceptable 6/12/2026 85 Mechanical EVR will not deliver or design the insulations Y Acceptable 6/12/2026 Page 6 of 9 31 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Everllence No. Department Comment Requirement Different than Seller's Standard Offering (Y/N) Commercial Impact to Comply (Y/N) Acceptable? Owner / Engineer Responses Response Date Proposer Response Response Date Owner / Engineer Responses Proposer Response 86 Mechanical Clarification: The exhaust gas treatment system is equipped with NOx analyzer to maintain necessary urea mass flow for injection purpose. We assume parameter monitoring will be used for emission control. A Continuous Emission Monitoring System (CEMS) is not foreseen and the catalyst is not designed for such operation. Y Acceptable 6/12/2026 87 Mechanical Type and size of maintenance access will be according to supplier standard. Y Acceptable 6/12/2026 88 Mechanical The catalyst layer are not designed for test blocks. Sampling can be done by test drills. Y Please provide more information about how test drilling process works so it can be determined if this is acceptable. 6/19/2026 In a first step a hole is drilled in the honeycombs using a hole saw with approximately 1 in. diameter. The drilling process is dry and done with a commercially available drill. The hole is usually not drilled through the entire depth of the catalyst honeycomb. The probe is then shipped in the laboratory for analysis. The hole is filled with high temperature cement to seal the area. The area of the 1 in. hole is neglectable compared the total cross section of the catalyst and has only a minor impact on the catalyst performance. 6/23/2026 Acceptable 89 Environmental General comment: -Emission limits and test methods as EVR Technical Specification and EVR Site Acceptance Test Procedure. -Emission control is assumed via parameter monitoring Y Acceptable 6/12/2026 90 Mechanical A test port upstream and downstream of the reactor is considered. Each test port has two ports which have an offset of 90 degrees. Y Acceptable 7/1/2026 91 Mechanical The test port will have blind flanges and no threaded ball valves. Y Acceptable 6/12/2026 To be discussed in 7/15 meeting 92 I&C Clarification: EVR provides a separate control system for the urea dosing unit. Communication between the RICE control system and the dosing unit control system is ensured. Y Acceptable 6/12/2026 93 Mechanical EVR will not provide calculations, equations, and curves for liquid reagent control system and SCRs. To be discussed in 7/15 meeting 7/1/2026 94 General Clarification: Test procedures will be determined and executed according to sub suppliers standards. Y Acceptable 6/12/2026 95 Electrical Installation of power cables on modules will be done with the installation at site. Y Acceptable 6/16/2026 Page 7 of 9 32 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Everllence No. Department Comment Requirement Different than Seller's Standard Offering (Y/N) Commercial Impact to Comply (Y/N) Acceptable? Owner / Engineer Responses Response Date Proposer Response Response Date Owner / Engineer Responses Proposer Response 96 Electrical EVR will provide skids with electrical design/components according to EVR standard. Y Provide EVR standard for review 6/16/2026 There is no document available to provide the EVR design standard for all mentioned requirements. We define minimum design and construction requirements towards our sub-suppliers which have finally the flexibility and competence on their own authority to comply with it. Summary of the main issues for single components or materials: - UL, NEMA, NEC, NFPA, …, standards will be followed where applicable and necessary - Proper design and construction fit for purpose in terms of cable routing, installation and termination to avoid any damage due to mechanical (e.g. vibration) or climatic (e.g. exposure to excessive ambient temperatures) conditions - explosion rated equipment if neceessary due to location / ambient conditions - optimized in terms of safety, operational flexibility, performance and system reliability Although we meet the basic requirements, there may be some specific points where design differs finally. 6/26/2026 Acceptable 97 Electrical Electrical motors will be designed and supplied acc. to following minimum EVR standard requirements: - Standard: UL certified / approved for use in USA - Motor type: Squirrel cage, TEFC-types (total enclosed fan cooled) - Rated voltage: AC 3~ with voltage tolerance according to NEMA +/- 10% - Inculation class: Min. F - Temperature rise class: B - IP Class: Min. NEMA 3S (acc. to NEMA 250) - Efficiency Standard: NEMA MG-1 equivalent (min IE36) - Efficiency Requirement: Min. NEMA premium (IE3) - Operation mode: Continuous duty - Anti-condensate heaters: Required for all motors located outside (except EC) and indoor motors ≥ 25 kW Y Acceptable 6/16/2026 98 Mechanical Exhaust gas test ports will be located near the ground in horizontal ducting. No test ports at the stack are considered. Y Acceptable 7/1/2026 99 I&C EVR will not provide a RTU Please confirm if Everllence can provide option for RTU 6/16/2026 No dedicated RTU will be provided. A non-redundant communication link to the dispatch system will be established via the DNP3 protocol. 6/26/2026 100 I&C EVR will not provide a SEL meter, it is a Siemens meter for measuring. No metering for tariff purpose. Only for operator information. Y Acceptable 6/12/2026 101 I&C EVR will not provide a SEL sync relay. Genset synchronization is possible via AVR sync function (ABB Unitrol 1020). Y Acceptable. Please confirm if generator protective relays will be SEL 6/16/2026 Confirmed, generator protective relays will be SEL. 6/26/2026 Acceptable 102 I&C EVR will not provide a Plant Historian Server. EVR´s plant control system is able to store data for trends longer then 3 months. EVR will provide a OPC-UA communication link to purchasers historian server. Please confirm if a historian can be provided a a cost adder. 6/19/2026 Providing a plant historian is technically feasible. EVR can offer a plant historian solution as an optional scope and provide the associated cost adder. 6/26/2026 To be discussed in 7/15 meeting Discussed in 7/15 meeting. Can be provided, but still need to see the optional cost. Page 8 of 9 33 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification PROPOSER TECHNICAL EXCEPTIONS AND CLARIFICATIONS Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER:Everllence No. Department Comment Requirement Different than Seller's Standard Offering (Y/N) Commercial Impact to Comply (Y/N) Acceptable? Owner / Engineer Responses Response Date Proposer Response Response Date Owner / Engineer Responses Proposer Response 103 I&C According to EVR standard, separate servers will not be provided. Y Acceptable 6/16/2026 104 I&C EVR will not provide a DMZ server. All external connections are via VPN router. Y Acceptable 6/16/2026 Page 9 of 9 34 C-2520 Letter of Recommendation Date: July 24, 2026 Exhibit 2 – Proposer RFC Logs 35 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification Questions to Proposer Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER: Wartsila # Discipline Specification Reference/Proposal Reference Question Question Date Proposer Response Response Date Cost Impact Owner Response Acceptable? Proposer Response 1 Structural Appendix A Section B In sections B1.1, B1.10.1, B1.10.2, B1.10.6 and B1.10.7, the note "Wartsila provides material" follows the line item for superstructures and foundation bolts. Additionally, both Wartsila and City of Ames are marked as responsible for these items. Please clarify Wartsila's scope for these items. 6/12/2026 Wartsila provides material and customers EPC contractor installs the materials. 6/25/2026 Acknowledged Y 2 Commercial Bid pricing form A cost adder was provided for a 5-year LTSA, and separate adder was provided to extend the warranty from 2 years to 5 years. Does the 5 year LTSA cost also include extension of the warranty to 5 years (i.e. if the 5 year LTSA is executed, is the warranty automatically extended to 5 years without having to pay the additional adder)? 6/12/2026 The 5 year LTSA does not extend the 2 year warranty included in the equipment contract. The LTSA does provide a separate warranty on the parts and services that are provided. 6/25/2026 Acknowledged Y 3 Instrumentation and Controls Appendix B, section 0.4 Calibration gases for a CEMS system are discussed. Please confirm continuous monitoring system is for control of SCR reagent injection and no CEMS is being provided as it is not required for plant air emissions permitting. 6/12/2026 No CEMS is provided. The Wartsila control system will control Urea injection without a CEMS system. Most of our Wartsila power plants to not have CEM's systems installed. 6/25/2026 Acknowledged Y 4 Mechanical Appendix F Confirm that reagent consumption rates (73 l/hr on gas and 473 l/hr on LFO) are on a per engine basis 6/12/2026 Yes, consumption rates are per engine 6/25/2026 Acknowledged Y 5 Mechanical Appendix B A2.3 Please confirm the lubricating service oil tank is sized to hold 100% of the oil from one engine. The service oil tank is sized at 16M^3 while the new and used lube oil tanks are each 31 M^3. 6/12/2026 Each engines has ~3,620 gal. (13.7 M'3) 6/25/2026 Is the 3,620 gal for the oil resevoir, or the entire filled engine lube oil system? Y Per 7/7 meeting, it is for the oil resovoir. 6 Mechanical 481127 101.30.b/Appendix B A5.2 It is stated that the SCR reducing agent storage capacity is sized for all engines (size listed is 190 m^3). What is the duration and operation mode assumed for this sizing? Per the specification section referenced, COA desires this tank to be sized to support 2 days of full load operation on fuel oil for 6 engines (this size is in order to accommodate a future expansion of 3 additional engines). What would be the cost adder to increase the size to this capacity? 6/12/2026 Urea storage tank is sized for 2 days of full load on fuel oil for 6 engines which is 36,000 US gallons but we sized the tank for wrose case scenario. Wrose case scenario consumption rate is 600 l/h on fuel oil at base load which is 158.5 US gal/h. 158.5 x 24 hours is 3,804 gallons per engine. 3,804 gallons x 2 days is 7,608 gallons. 7,608 x 6 engines is 45,648 gallons 6/25/2026 Please confirm diemsnions of the tank. Y 7 Mechanical Proposal pricing form No costs were provided for 'Spare parts for 2 years of operation and maintenance'. Please provide a cost adder to furnish 2 years spare parts. 6/12/2026 The parts needed to cover 2 years of operation and planned maintenance are already included in the indicative estimates provide in the LTSA. (The indicative pricing assumes running hours as stated in the 5 year LTSA: maximum of 11,750. 6/25/2026 To be discussed in 7/7 meeting. Will spares be sent to site? How much space is required for storage on site? Y Discussed in 7/7 meeting. Spares provided as part of LTSA. Critical spares and the space associated with them provided as proposal addendum. 8 Mechanical Proposal pricing form No costs were provided for the option 'Spare parts (recommended for 3-5 years)'. Please provide a cost adder or estimated cost for this item. 6/12/2026 The parts needed to cover 3-5 years of operation and planned maintenance are already included in the indicative estimates provide in the LTSA. (The indicative pricing assumes running hours as stated in the 5 year LTSA: maximum of 11,750. 6/25/2026 To be discussed in 7/7 meeting Y Discussed in 7/7 meeting. Acceptable 9 Commercial Proposal pricing form No costs were provided for the option 'Two- Year Long Term Service Agreement (LTSA)'. Please confirm that an option for a 2 year LTSA can be provided. 6/12/2026 We strongly recommend the 5 year LTSA which provides optimized cost and benefit for COA. However, we can discuss shorter terms if COA has critical preference. (Note: At 2 years with the run hour assumptions the engines are only reaching 4,700 hours). 6/25/2026 To be discussed in 7/7 meeting Y Discussed in 7/7 meeting. Acceptable Page 1 of 4 36 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification Questions to Proposer Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER: Wartsila 10 Mechanical General Arrangement Please see attached GA. Fuel Oil pumps are currently planned to be located next to fuel oil tanks and not adjacent to the unloading plan by the engine hall. Please confirm pumps quoted can accommodate the anticipated location for this equipment. 6/12/2026 The unloading pumps are located next to the pirmary storage tanks. The unloading pumps are in the customer scope. The forwarding pumps are indoor rated and are located in the pump building next to the fuel tanks and this appropriately located to supply forwarding of fuel oil to the engine locations. 6/25/2026 Acknowledged Y 11 Mechanical Appendix 2 Performance Guarantees Please see Appendix 2 Performance Guarantees file in original specification posting. Please fill in information requested and return for review. 6/12/2026 Wartsila is only providing Guarantee at 100% load for full plant output. We have already provided the other performance load points, but these are indicative reference only. 6/25/2026 This sheet is used as part of the proposal evaluation. Please fill out the the highlighted cells in the sheet, which indicate infromation that was not found in the proposal. Y Filled out and provided as proposal addendum 12 Electrical Appendix A Scope of Supply Please provide cost adder for emergency diesel generator. It is recommended this unit be furnished by OEM due to complexity with coordinating with OEM provided electrical system. 6/12/2026 Yes, we can proivde black start generator option. Wartsila will provide the price for this option on or before the 7-JUL meeting. 6/25/2026 Acknowledged Y 13 Mechanical Appendix G - Noise Guarantee Wartsila has previously provided more detailed noise inputs for consideration. Can Wartsila provide this detailed noise datasheet? Please also include equipment based sound offerings and optional equipment (i.e.. low noise radiator) sound offerings. 6/12/2026 Wartsila has provided a well documented noise gauranteee in Appendix G - Noise Guarantee. The source references are; engine, exhaust stack exit, intake, & radiator. Wartsila has already provided our lowest noise attenuation options for the following scope items: - radiators (level 4) - exhaust stacks (inlcudes 45 dba and exhaust gas silencer with a pre-silencer). - Intake plenum (includes 45 dba charge air silencer and 600 mm baffles). 6/25/2026 Acknowledged Y 14 Mechanical Appendix A Scope of Supply Please provided cost add to furnish fuel gas emergency shutdown and vent valves. 6/12/2026 Wartsila will provide a price adder to include this in our scope of supply. The price for this option will be provdided on or before 7-JUL mtg.6/25/2026 Acknowledged Y 15 Instrumentation and Controls Appendix F Exhaust Emission Guarantee Please provide locations of emissions monitoring ports according to relevant EPA guidelines. 6/12/2026 Appendix J2 - Engine Hall Section notes the location of the emissions measuring ports. 6/25/2026 Please confirm there are ports upstream of the SCR as well. Also, please confirm that these ports conform to EPA testing method 1.Y Discussed in 7/7 meeting. Flexible to adjust emission port sizes and location after award. Acceptable 16 Mechanical Exhibit 8 Performance Test Guidelines No FAT protocols were given for the engines, generators, or controls system(s). Please provide FAT protocols for engines, generators, and controls system(s). 6/12/2026 FAT Protocols are provided after Contract signature and 15- 30 day before FAT. 6/25/2026 Acknowledged Y 17 Instrumentation and Controls Appendix B Technical Specification Please provide WDAAA184151 document referenced in Appendix B. 6/12/2026 Attached is document WDAAA184151 which is a simple P&ID as showen in figure 2 in Appendix B 6/25/2026 Acknowledged Y 18 Commercial/Gener al Exhibit 8 Performance Test Guideline/ Price Form Please provide option for blackstart testing of gensets. 6/12/2026 This will be provided during the pre- commissioning phase of the project. 6/25/2026 Acknowledged Y 19 Electrical Appendix B Technical Specification Confirm all necessary LV cubicles are included as is noted in the specification Single Line Diagram, two tie breakers, and an incoming feeder breaker for a RAT, and a black start generator breaker 6/16/2026 All the provided cubicles are indicated in the doc P26415-WAR-0010 and P26415-WAR-0009 6/25/2026 Adjust offering based on the recently transmitted Single Line Y Adjusted per 7/17 offer 20 Electrical Appendix B Technical Specification Confirm the LV Switchgear and Wartsila auxiliaries are black start capable 6/16/2026 Yes, it will be black Start capable. 6/25/2026 Acknowledged Y 21 Electrical Appendix B Technical Specification Clarify where the Radiator panels are to be fed from 6/16/2026 Electrically from the Engine MCC's, to the VFD and later to a field distribution panel typically install under the generators. 6/25/2026 Acknowledged Y 22 Electrical Appendix B Technical Specification Confirm arc flash study will be performed and arc flash labels will be provided if Option F is exercised 6/16/2026 Yes, it will be performed and labels will be provided. 6/25/2026 Acknowledged Y 23 General App C1A and C1B Please confirm whether the guaranteed electrical output listed (54,396 kW) is on a net or gross basis. If it is a gross value, please provide a net value as well.6/19/2026 kW guarantees are defined at the generator terminals as a gross value, since certain parasitic loads are excluded from our scope of supply 6/25/2026 Acknowledged Y 24 Mechanical App C1A and C1B Please confirm whether the heat rate provided is on gross or net value. If it is a gross value, please provide net value as well. 6/19/2026 Heat rate guarantees are defined at the generator terminals as a gross value, since certain parasitic loads are excluded from our scope of supply 6/25/2026 Acknowledged Y Page 2 of 4 37 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification Questions to Proposer Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER: Wartsila 25 Mechanical App G - Noise Guarantee Confirm whether the exhaust stack exit sound level (92 dBA) includes the 45 dBA attenuation from the silencer. i.e., is the final measured sound at the exit 92 dBA or 47 dBA? 6/19/2026 The guarantee level is 92dB(A) which includes 45dB(A) exhaust gas silencer, nonwool resistive pre-silencer, and SCR 6/25/2026 Acknowledged Y 26 Mechanical App G - Noise Guarantee Confirm whether the intake sound level (88 dBA) includes the 45 dBA attenuation from the silencer. i.e., is the final measured sound at the exit 92 dBA or 43 dBA? 6/19/2026 The guarantee level is 88dB(A) which includes 45 dB(A) charge air silencer and 600 mm baffles 6/25/2026 Acknowledged Y 27 General Appendix I - Document Submittal Schedule Please confirm that the Document Submittals will include: '-Master Document List (updated monthly) submitted 30 days after EKO '-Project Schedule (updated monthly) submitted 30 days after EKO '-Monthly progress reports '-O&M Training Program and Training Manuals 90 days after EKO '-Quality Assurance / Control Procedures 90 days after EKO -3D model models of all mechanical equipment, skids, and Wartsila provided piping / ducting, etc. 6/19/2026 The Monthly progress reports will include the Master Document List and Project Schedule will be submitted 30 days after EKO. Preliminary Training Program will be provided 90 days after EKO Wartsilä provides ITP, Engine PCT protocol 30 days before engine PCT, FAT protocols for the control system 30 days before testing and Generator FAT Protocols ahead of the Generator FAT. Site Quality Assurance Documentation (SQAD) will be available after the equipment is delivered to site. 3D model models for Wärtsilä’s scope of supply will be provided 6/25/2026 Submittal schedule updated per S&L comments. Acceptable Y 28 Mechanical App B - Technical Specification A2.3 Please confirm the lube oil system will include a lube oil heater and all required skid mounted piping and valves. 6/19/2026 Confirmed. The lube oil heater is included in the tank. The tank insulation is not included in Wartsila scope. The tank will need to be insulated by others. The forwarding pump skid includes the piping, valves, strainers. The forwarding pump is not heat traced and needs to be located in a heated location. 6/25/2026 Acknowledged Y 29 Mechanical App B - Technical Specification A2.4 Please confirm the compressed air systems will include all skid mounted piping and valves. 6/19/2026 The compressed air sytems includes separate units for the dryer and receiver tanks. The relief valves, piping, and regulators between these units are not included in the Wartsila scope. 6/25/2026 Acknowledged Y 30 Mechanical App J.4 - Power Plant Site Please provide dimensions of radiators 6/19/2026 There are (5) banks of radiators per engine. Each radiator bank has the following dimensions: Length: ~460 inches Width: ~102 inches Height: ~83 inches 6/25/2026 Acknowledged Y 31 Mechanical App B - Technical Specification A2.5 Please confirm if cooling system includes high temperature circuit expansion vessels and skid mounted piping and valves 6/19/2026 Each engine exhaust gas module is equipped with its own cooling water expansion tank. 6/25/2026 Acknowledged Y 32 Mechanical / Structural App B - Technical Specification A2.6 Please confirm a platform will be provided for access to the charge air filters and engine hall ventilation 6/19/2026 The Wartsila scope includes a platform for the charge air filer and engine hall ventilation. 6/25/2026 Acknowledged Y 33 Mechanical App B - Technical Specification A5.2 Please confirm the SCR system includes Nox analyzers, sampling umbilical, sample line raceway, and the required steel supports. 6/19/2026 The Wartsila scope includes Nox analyzers. The sampling umbilical, sample line raceway, and the required steel supports are note in Wartsila scope and need to be provided by others. 6/25/2026 Please confirm that this scope can be provided as an option per option C. To be discussed in 7/7 meeting Y Discussed in 7/7 meeting. Umbilical, raceway, and steel supports to be provided by others. Acceptable 34 Mechanical App B - Technical Specification A5.2 Please describe the emissions monitoring ports that are included upstream and downstream of the SCR system for performance testing. 6/19/2026 The emission measuring ports are referenced in the Appendix J2 - Engine Hall Section drawing. 6/25/2026 See item 15 Y 35 Mechanical App B - Technical Specification A5.2 Please confirm the SCR system will include all skid mounted piping and valves. 6/19/2026 The Wartsila provided reagent pump includes skid mounted valves and piping. 6/25/2026 Acknowledged Y 36 Structural Appendix A, scope of supply, b1.10.6 Stack superstructures are shown as in City of Ames scope. We would expect this to be in Wartsila scope. Please confirm 6/19/2026 Wartsila has defined single self supported stacks in our scope of supply per Appendix J4 - Power Plant Site. Cluster stacks could be provided an option if COA prefers. 6/25/2026 Acknowledged Y Page 3 of 4 38 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification Questions to Proposer Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER: Wartsila 37 General App B - Technical Specification, K1 Which Wartsila facility would training occur at? Is it possible for the training listed for 'At Wartsila Facility' to be performed at site instead? 6/19/2026 For the equipment contract we have proposed 2 training sessions in Wärtsilä land and sea academy in Ft. Lauderdale, and 2 training sessions at site. Additional travel cost will need to be added to perform additional Site training. For the LTSA, we considered onsite training meeting minimum requirements, as per bid section 019500, part 103. 6/25/2026 Acknowledged Y 38 General App B - Technical Specification, G1.2.1, J1 Will Wartsila provide any civil technical advisory? 6/19/2026 A Civil Chief Project Engineer will be involved in the design of Wärtsilä's Scope of Supply, Civil Technical Advisory can be provided while at site but will consume days from other deciplines. 6/25/2026 Acknowledged Y 39 General W50DF maintenance schedule Per provided schedule, it appears a major overhaul occurs at 36,000 hrs of operation. What is the expected duration of this overhaul? 6/19/2026 Roughly 30 days with an exchange set of parts and working one shitf. Roughly 45 days without an exchange set and working one shift. This is rough estimate only. It can be less days with 2 shifts but also depends on number of people . 6/25/2026 Included on agenda for discussion on 7/7 Y 40 General W50DF maintenance schedule Are the parts required for all maintenance and overhaul activities available in the US? 6/19/2026 As part of an LTSA, through maintenance planning we ensured that parts are available when needed for planned maintenance. Our main warehouse is located in Netherlands, but we do hold inventory in Houston as well. 6/25/2026 Acknowledged Y 41 General W50DF maintenance schedule Are contractors for all maintenance and overhaul activities available in the US?6/19/2026 Yes, our field service resources are available in the US.6/25/2026 Acknowledged Y Page 4 of 4 39 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification Questions to Proposer Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER: Everllence # Discipline Specification Reference/Proposal Reference Question Question Date Proposer Response Response Date Cost Impact Owner Response Acceptable? Proposer Response 1 Mechanical App II Technical Specs/C-2520 Appendix 2 Please confirm that the following specifications are the same for gas and oil operation: Lube Oil Consumption: 1.64 gal/hr 6/12/2026 confirmed 6/23/2026 Acknowledged Y 2 Mechanical App II, Section 4.1, Items 030.120.040 and 060.005.010 Annex 9 The intake air and exhaust gas silencer are listed as optional per App 2. An adder cost of $455,351 EUR was provided for the exhaust gas silencer. Does this adder also include the intake air silencer? If no, please provide the cost adder for the intake air silencer. 6/12/2026 It does not incluse the Intake Air Silencer. The optional cost is 1,179,119.00 euros 6/23/2026 $1,418,020.30 Acknowledged Y 3 Commercial Cover Letter, Price Form Cover letter states that the prices do not include any taxes, but the notes in the submitted form states that a 7% tax was included in the base bid cost. Please confirm whether base bid cost includes tax. 6/12/2026 The cover letter is correct. Our price does not include the 7% Iowa Sales Tax. Applicable Iowa sales tax on taxable Work shall be charged separately by Supplier to Owner and itemized on Supplier’s invoices in accordance with applicable laws as indicated in Clause 5.2 of the provided Agreement. 6/23/2026 Acknowledged Y 4 Structural App III, Item 130.030 Please clarify if exhaust gas stack steel support structure is included in item 130.030.910. 6/12/2026 The steel support structure for the exhaust gas stack is included in the EVR bid (130.030.910). 6/23/2026 Acknowledged Y 5 Mechanical Price Form Please confirm the cost provided for 'Spare Parts for 2 years operation and maintenance' of 1,492,536 EUR is not included in the base equipment cost of 74,297,246 USD. 6/12/2026 Confirmed. Costs are not included in the base bid. 6/23/2026 Acknowledged Y 6 Commercial Price Form No cost was provided for 'Freight, DDP Station'. Please provide an estimated cost for this to allow for a complete bid evaluation. It is understood that this cost could vary at time of shipment. 6/12/2026 The cost estimate includes transportation of the engines and alternators to the foundation (unloaded), as well as delivery of the equipment to the site (not unloaded). The difference between DAP/DPU and DDP mainly relates to applicable tariffs, which depend on the rates in effect at the time of import. 6/23/2026 Please confirm that Everllence will cover all tariff costs associated with DDP at the time of import as part of the base. Per cover letter page 4, the shipping costs are indictive and non-binding-please confirm that these costs are covered in the base bid. Y Per 7/15 interview, COA would pay all tariff and shipping costs. Costs are not co 7 Mechanical Price Form No costs were provided for the Lube Oil Bulk Storage tanks; however, the lube oil transfer pumps and lube oil supply pumps are being provided as part of the base scope. Please provide the cost breakout for lube oil pumps included in the base scope. Additionally, please confirm if an option can be provided to furnish the Lube Oil Bulk Storage tanks. 6/12/2026 According to the design philosophy, the EPC/construction company supplies the tanks. 6/23/2026 Acknowledged Y 8 Mechanical Price Form No costs were provided for the Reagent Bulk Storage tank; however, the forwarding pump system is being provided as part of the base scope. Please provide a breakout cost of the pump forwarding system that is included in the base scope. 6/12/2026 At this stage, we regret to inform you that we are unable to offer tanks. 060.105.020 Pump Module for Reduction Agent: 83,204 € 6/23/2026 Acknowledged Y 9 General/Commerci al Price Form Estimated cost for the 5 year LTSA is significantly higher than for the 2 year LTSA. Please explain this large price difference. Please also confirm if the cost includes spares or if this spare components would be paid for separately by Owner. 6/12/2026 According to assumptions engines will run around 2,350 RH per year and auxiliaries on warm stand-by (continuous operation). With such assumptions, within first two(2) years of the plant operation, engines are not reaching 6,000 RH which is the first main maintenance interval to take place. Within five(5) years engines are reaching up 11,750 RH per engine including main intervals which is 6000 RH. LTSA amount also includes auxilliaries (Balance of Plant scope provided by Everllence). LTSA includes spare parts and service for all planned maintenance events. 6/23/2026 Acknowledged Y 10 Mechanical Price Form No costs were provided for the 'Aux Side Ventilation Units'. Please confirm if an option to supply these units can be provided. In S&L's experience, having an OEM furnish the Aux Side Ventilation Units and support platform for both the ventilation units and the charge air units simplifies the design coordination efforts and helps reduce errors. 6/12/2026 Design, capacity, and positioning of "Aux side ventilation units" is highly affected by main ventilation concept and design, linked to the final engine hall dimensions and design. With this, an overall CFD study shall be executed to maintain the required temperature levels inside the power house. Therefore, a split scope of supply is not beneficial for the project in EVR point of view. 6/23/2026 Acknowledged Y 11 Commercial Price Form All cost adders were provided in EUR. A conversion rate of 1.20261 was used to convert to USD for evaluation. Please confirm this is the correct rate to use or provide pricing in USD with adjusted conversion rate. 6/12/2026 Confirmed 6/23/2026 Acknowledged Y 12 Mechanical Appendix II Tech Spec Please confirm if lube oil pumps provided will be skid mounted with appropriate isolation to switch between pumps. If not provided, please provide scope adjustment to include skid mounted components for isolation and instrumentation required for operation of lube oil pumps. 6/12/2026 Please refer to line item 6 in "Except Clar" sheet 6/23/2026 Acknowledged, not skid mounted Y Page 1 of 6 40 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification Questions to Proposer Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER: Everllence # Discipline Specification Reference/Proposal Reference Question Question Date Proposer Response Response Date Cost Impact Owner Response Acceptable? Proposer Response 13 Mechanical Section 011900, Table 106.1 For LTSA operating hours per year, Owner estimates the following based on Section 011900, Table 106.1: Gas Operation - 2000 hrs Fuel Oil Operation - 350 hrs Please confirm LTSA pricing is based on assuming hours of operation on each fuel. 6/12/2026 Confirm running hours assumptions are correct: Gas annual Operation 85% and Fuel Oil 15% running hours: Gas Operation: 2,000 RH per year Fuel Oil Operation: 350 RH per year 6/23/2026 Acknowledged Y 14 Mechanical Price Form If a 5 year LTSA is selected, would the validity of the warranty be extended to 5 years? 6/12/2026 LTSA warranty is separate from any warranties under equipment supply contract. Once LTSA is effective, the LTSA warranty will be 18 months, from delivery of spares parts or completion date of Service . Also12 months after repair or replacement with a maximum cumulative warranty of 24 months from the original delivery date. . 6/23/2026 What is the cost for extending the warranties under the equipment supply contract? 15 Commercial Price Form Proposal indicates pricing in EURs is firm but the costs will be adjusted for USD at time of award/contract signing. Please confirm if costs provided in USD can remain firm through bid validity date of July 31st, 2026. 6/12/2026 The prices indicated in USD in the cover letter are for informational purposes only. The final USD price would be determined shortly before Agreement signature, according to the forward rates applicable then in the financial markets, in close coordination with City of Ames, on a banking day when banks are open for business in Copenhagen and Augsburg. At that time, the price would be fixed in USD for a period of 3 years, as per Appendix I of the Agreement, and payable as agreed in the Agreement. 6/23/2026 Acknowledged Y 16 Mechanical General Arrangement Please see attached GA. Fuel Oil pumps are currently planned to be located next to fuel oil tanks and not adjacent to the unloading plan by the engine hall. Please confirm pumps quoted can accommodate the anticipated location for this equipment. 6/12/2026 confirmed 6/23/2026 Acknowledged Y 17 Electrical Appendix A Scope of Supply/Appendix III Division of Work Please provided cost adder to emergency diesel generator. It is recommended this unit be furnished by OEM due to complexity with coordinating with OEM provided electrical system. 6/12/2026 Everllence will provide a concept describing the required control and interfacing approach. However, please note that the Emergency Diesel Generator is not included within Everllence's scope of supply and responsibility. 6/23/2026 Per item 16 of the filled out bid form, EVR states that the Emergency Diesel Generator could be provided. A black start capable design is required as well as a diesel generator sized appropriately. Confirm EVR is providing. Y Per 7/15 interview, EVR is not able to provide a quotation for the black start diesel generator at this time 18 Mechanical Appendix A Scope of Supply/Appendix III Division of Work Please provide cost adder to furnish fuel gas emergency shutdown and vent valves. 6/12/2026 please refer to line item 30 in "Except Clar" sheet 6/23/2026 Acknowledged, not providing Y 19 Mechanical Appendix A Scope of Supply/Appendix III Division of Work Please provide cost adjustment to furnish mobile lube oil pumps. 6/12/2026 Mobile transfer pumps are not considered in EVR design. The EVR standard includes one permanently installed pump with the same design as the LO supply pump. It is located between the engine and the maintenance tank. The pump drains and refills specific engines via a diverter valve as part of the plant piping. 6/23/2026 Acknowledged Y 20 Mechanical Appendix 2 Performance requirements Please provide guaranteed values for requested parameters. 6/12/2026 Guarantee values are part of Appendix 2: EVR's Technical Specification. Section '1.2 Performance data' 6/23/2026 Acknowledged Y 21 Instrumentation and Control Appendix II Tech Spec Please provide product datasheet of SaCoS engine control system. 6/12/2026 SaCoS One brochure is attached 6/23/2026 Acknowledged Y 22 General/Commerci al Price Form Please provide description of recommended LTSA based on Section 019500 of document C-2520 - RICE Spec_R0. 6/12/2026 Please refer to LTSA for 5 Years attached 6/23/2026 Acknowledged Y 23 General/Commerci al Price Form/ Appendix II Tech Spec Please provide operations and maintenance trainings per Section 019500 of document C-2520 - RICE Spec_R0. 6/12/2026 - Price for the training as listed in 2026 net Euro 269,500.00. We expect a price increase of about 3% per year. - Included: 2×10 ‑day Operations & Maintenance training courses covering engine operation, maintenance, safety procedures, and dual‑fuel technology (incl. control system basics); plus 2×5 ‑day on‑site courses covering operator training, engine automation, normal operation, start/stop procedures, troubleshooting, and data monitoring; training delivered via theoretical and practical sessions (simulators/engines in Augsburg), training materials and certificates included. - The electrical training has yet to be consulted with subsuppliers. 6/26/2026 To be discussed in 7/15 meeting Y Offered training discussed in 7/15 meeting and deemed acceptable 24 Mechanical Appendix II Tech Spec Please provide recommended maintenance schedule for engine/genset. 6/12/2026 51/60DF Engine Maintenance Schedule Attached 6/23/2026 Acknowledged Y 25 Commercial/Gener al Price Form/Appendix II Tech Spec Please provide option for blackstart testing of gensets. 6/12/2026 We regret to inform you that we are unable to provide this option at this time. 6/23/2026 To be discussed in 7/15 meeting Y Per 7/15 interview, EVR is not able to provide a quotation for the black start diesel generator at this time 26 Electrical Annex 7 - LVM Tech Spec Preference is for a LV SWGR, Everllence to provide 6/16/2026 LV SWGR confirmed 6/23/2026 Acknowledged Y Page 2 of 6 41 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification Questions to Proposer Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER: Everllence # Discipline Specification Reference/Proposal Reference Question Question Date Proposer Response Response Date Cost Impact Owner Response Acceptable? Proposer Response 27 Electrical Annex 7 - LVM Tech Spec Everllence to confirm breakers are provided for incoming RAT feed as shown on Preliminary Single Line Diagram as well as tie breaker for isolation of an essential services bus as well as a tie breaker for future connection. 6/16/2026 Based on the submitted preliminary SLD, Everllence can provide, at additional cost: - one incoming circuit breaker for the Reserve Auxiliary Transformer (RAT) supply; - one tie/bus-coupler breaker for isolation of the essential services bus section; - one tie breaker provision for future connection. The current offer is based on a single 480 V LV busbar arrangement. Any arrangement requiring separate bus sections, essential-services bus segregation, or bus-coupler functionality is not included in the present scope and can be offered upon request. 7/1/2026 Please provide cost adder for this. 28 Electrical Annex 7 - LVM Tech Spec Document states black start is excluded. This is unacceptable. Everllence to provide. 6/16/2026 The startup of the islanded house-load operation following a grid blackout is included and will be provided by the dedicated black-start diesel generator connected to the LV Main Distribution. The exclusion stated in the specification refers only to the black start of the utility grid. Black start of the utility grid remains excluded from Everllence's scope of supply. If line charging of the step-up transformers is required, further information will be needed. 6/23/2026 To be discussed in 7/15 meeting Y Per 7/15 interview, EVR is not able to provide a quotation for the black start diesel generator at this time 29 Electrical Annex 7 - ACDP This document is for a panel to supply lighting. This is not required. Lighting design will be done by detailed design Engineer. Lighting panels will be supplied by GWC. Unless this is a panel to supply lighting supplied by Everllence, eliminate from scope. 6/16/2026 The ACDP supply AC 120 V to all Everllence supplied panels for air condition, panel illumination and power outlets inside them. 6/23/2026 Acknowledged Y 30 Electrical Annex 7 - CCP Everllence to provide top entry panels. 6/16/2026 Top entry cannot be offered. Everllence's standard design is based on Rittal cabinets, which are not designed for top cable entry. Cable installation is carried out via the plinth using bottom cable entry. 6/23/2026 Noted Y 31 Electrical Annex 7 - CAP Everllence to provide top entry panels. 6/16/2026 Top entry cannot be offered. Everllence's standard design is based on Rittal cabinets, which are not designed for top cable entry. Cable installation is carried out via the plinth using bottom cable entry. 6/23/2026 Noted Y 32 Electrical Annex 7 - MCC Everllence to provide top 6/16/2026 Top entry is confirmed. 6/23/2026 Noted Y 33 Electrical Annex 7 - MCC Everllence to clarify what loads would be controlled via MCC that would necessitate a Profibus connection 6/16/2026 The MCC is used for power distribution and motor feeder functions only. All control functions are performed via the associated Interface Panel (IP), which serves as the communication and signal interface to the MCC. PROFIBUS is not part of Everllence's current project standards. PROFINET is used instead. 6/23/2026 Clarify what signals will be transmitted via PROFINET from the MCC 34 Electrical Annex 7 - CAPP Clarify scope, not required if Everllence is not supplying a pumphouse 6/16/2026 Pump House is not part of Everllence Scope. Nevertheless, considering the multiple interfaces with the control system (CCP), Everllence recommends that the CAPP-IP be supplied by Everllence to ensure clear responsibility for integration and effective interface management. 6/23/2026 Noted Y 35 Electrical Annex 7 - CAPP MCC Clarify scope, not required if Everllence is not supplying a pumphouse 6/16/2026 Pump House is not part of Everllence Scope, CAPP will be removed from the scope 6/23/2026 Noted Y 36 Electrical Annex 7 - GCP Everllence to provide top entry panels. 6/16/2026 Top entry cannot be offered. Everllence's standard design is based on Rittal cabinets, which are not designed for top cable entry. Cable installation is carried out via the plinth using bottom cable entry. 6/23/2026 Noted Y 37 Electrical Annex 7 - GCP Everllence to provide SEL protective relays 6/16/2026 SEL generator protection relay is confirmed. 6/23/2026 Noted Y 38 Electrical Annex 7 - ERP-IP Everllence to provide top entry panels. 6/16/2026 Top entry cannot be offered. Everllence's standard design is based on Rittal cabinets, which are not designed for top cable entry. Cable installation is carried out via the plinth using bottom cable entry. 6/23/2026 Noted Y 39 Electrical Annex 7 - ERP- MCC Everllence to provide top entry panels. 6/16/2026 Top entry is confirmed. 6/23/2026 Noted Y Page 3 of 6 42 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification Questions to Proposer Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER: Everllence # Discipline Specification Reference/Proposal Reference Question Question Date Proposer Response Response Date Cost Impact Owner Response Acceptable? Proposer Response 40 Mechanical Proposal Form Everllence noted for the Cooling Systems that 'most piping inside PowerHouse is included. Some piping outside Powerhouse is not included in base bid.' Can you please elaborate on what piping inside the PowerHouse is included? Is there piping inside the PowerHouse for other systems that is also included in the base bid? 6/19/2026 part of our offer is a 'large module design' containing most of the process piping inside power house. Part of the design is also a 'Media Hub Skid' containing the relevant process header lines (besides cooling water and natural gas). Result is, that most of the piping inside power house is already covered with these modules. They are located on the floor and build the lower level (1) of the service platform inside power house. Piping not covered by this design is interconnecting piping between the 3 service platform levels (1-3) and connection to the header lines at 1st engine. Addtionally, for this piping not delivered by EVR, detail design will be carried out and MTO and isometric drawings will be forwarded. Cooling water piping is not part of these modules due to concept and sizing. Design Interface is at the power house wall. responsibility of interconnecting line from PH wall to radiator field could be discussed and agreed 6/23/2026 Acknowledged Y 41 Mechanical C-2520 - Appendix 2 Performance Requirements, item d.2 Please confirm that the net electrical output @ 100% full load (excluding BOP loads by others) would be 17,458 kW for NG and 17,369 kW for LFO. This is gross output minus aux power consumption. It is preferred for this to be guaranteed, but OK if it cannot be guaranteed. 6/19/2026 Confirmed 6/23/2026 Acknowledged Y 42 Mechanical C-2520 - Appendix 2 Performance Requirements, item d.7 Please provide as a net heat rate. Preferred if this can be guaranteed. 6/19/2026 We have provided a gross heat rate as Everllence has not the complete scope of the power plant. But we can agreed to guarantee the Consumption of EVR's scope. See Apendix II, Annex 8. 6/23/2026 Acknowledged Y 43 Mechanical C-2520 - Appendix 2 Performance Requirements, item d.4 Please provide aux power consumption at 0% load (standby) 6/19/2026 standby operating conditons shall be defined first: different operating philosophies and ambient conditions will lead to different values. When stopping the plant with standby request and the temperature inside the engine hall is at around 20C (68F), the average standby consumption is approx. 330kW per engine. Main consumers are the LO and HT cooling water preheater to maintain the required media temperature to allow for start 6/23/2026 EVR to indicate on load list which loads require standby power. 44 Mechanical App 2 - Technical Specifications 9.1.4 Please provide the lube oil pressure and temperature requirements at the interface of your system. 6/19/2026 working temperature shall be >=20C(68F), working pressure is hydrostatic linked to filling level of tank. Please also refer to submitted PFDs 6/23/2026 Acknowledged Y 45 Mechanical C-2520 - Appendix 2 Performance Requirements, item d.6 Please confirm these provided fuel flow rates are provided on a per engine basis 6/19/2026 confirmed. Values have to be corrected, there was a typo: Gas: instead of 6562 --> 6431 Diesel: instead of 7756 --> 7601 6/23/2026 Acknowledged Y 46 Mechanical C-2520 - Appendix 2 Performance Requirements, item f.1.12 Please confirm reagent flow rates are provided on a per engine basis 6/19/2026 confirmed 6/23/2026 Acknowledged Y 47 Mechanical C-2520 - Appendix 2 Performance Requirements, item d.11 Please confirm lube oil consumption rates are provided on a per engine basis 6/19/2026 confirmed 6/23/2026 Acknowledged Y 48 Mechanical C-2520 - Appendix 2 Performance Requirements, item d.13 / Annex 9 Please provide sound level of exhaust gas duct. This is not currently provided in Annex 9 6/19/2026 could be included in next revision 6/23/2026 Please provide. Y Provided 49 Mechanical Annex 9 Please confirm if the provided sound level of the intake air opening (106 dBA) includes the sound attenuation. i.e, is 106 dBA what the final sound level will be after the 45 dBA of attenuation? 6/19/2026 confirmed 6/23/2026 Acknowledged Y Page 4 of 6 43 City of Ames Ames Municipal Energy Center Project No. 15790.002 RICE Specification Questions to Proposer Specification: C-2520 Issue: For Proposal Rev. 0 Date: 03-13-2026 NAME OF PROPOSER: Everllence # Discipline Specification Reference/Proposal Reference Question Question Date Proposer Response Response Date Cost Impact Owner Response Acceptable? Proposer Response 50 Mechanical Annex 9 Please confirm if the provided sound level of the exhaust gas (97 dBA) includes the sound attenuation. i.e, is 97 dBA what the final sound level will be after the 42 dBA of attenuation? 6/19/2026 confirmed 6/23/2026 Acknowledged Y 51 General Appendix X - EngDocsSubmittalL ist Please confirm that the EDSL will include: '-Master Document List (updated monthly) submitted 30 days after CD '-Project Schedule (updated monthly) submitted 30 days after CD '-Monthly progress reports '-O&M Training Program and Training Manuals 90 days after CD '-Quality Assurance / Control Procedures 90 days after CD 6/19/2026 EVR's EDSL does not include project management reports. -It is possible to provide the status of the documents in EDSL on a monthly basis. -Project Schedule (updated monthly) submitted 30 days after CD: confirmed -Monthly progress reports: confirmed -O&M Training Program and Training Manuals 90 days after CD: If the training is part of the contract, is possible to provide the standard the training plan and the training material based on the standard training Everllence offer. Plant specific details and specific customer requests can not be included at this early stage. -Quality Assurance / Control Procedures 90 days after CD: confirmed 6/26/2026 52 Mechanical App 2 - Technical Specifications 4.2 Please confirm that Everllence is not providing the Fuel Oil Forwarding Pumps described in Spec Section 481127 101.8. The fuel oil forwarding pumps are intended to forward oil from the owner's fuel oil storage tank to the vendors fuel oil module. The only fuel oil pumps described are on the Diesel Oil Supply Pump Module, and these do not appear to accomplish this function. 6/19/2026 Please see answer to item 16 and also submitted PFDs. Offered supply pumps accomplish this function. Main issue is the outdoor installation. A shelter may also be sufficient as a weather protection. Could be discussed 6/23/2026 Acknowledged, pumps included Y 53 Mechanical App 2 - Technical Specifications 4.2 Please confirm for the fuel gas system that Everllence will provide pressure trim / regulating for fuel gas to each engine and any required piping / valves for the system will be skid mounted. 6/19/2026 For skid mounted valves part of the control line please refer to submitted PFDs. Gas control line with described function will be delivered for each engine separately. 6/23/2026 Acknowledged Y 54 Mechanical App 2 - Technical Specifications 4.2 Please confirm the lube oil system will contain oil mist coalescer units for mist separator vent pipe for each engine 6/19/2026 Please refer to submitted PFDs. Oil mist eliminator is part of our offer. It contains the coalescer and a fan, to send extracted air from crankcase to the intake air system 6/23/2026 Acknowledged Y 55 Mechanical App 2 - Technical Specifications 4.2 Please confirm that on-skid piping and valves for the starting air, control air, and atomisation air systems are included. 6/19/2026 Confirmed, for the single modules. No skid for the entire system available 6/23/2026 Acknowledged Y 56 Mechanical - 57 Mechanical App 2 - Technical Specifications 4.2 Please confirm that the intake air system includes an air heater, ducting downstream of the turbocharger, and a platform for accessing the system 6/19/2026 Confirmed. The air heater is not required for engine function; however, the filter section must be protected against freezing. An IR panel could also be the chosen solution later on. 6/23/2026 To be discussed in 7/15 meeting Y Discussed in 7/15 meeting and acceptable 58 Mechanical Annex 9 It appears the option for the additional exhaust gas silencer only attenuates the sound by 1 dBA. Please confirm. 6/19/2026 Correct. The main function of this additional (resonator) silencer is to reduce low- frequency noise, not the total sum value. 6/23/2026 Acknowledged Y 59 Mechanical Annex 9 It appears the option for the additional intake air silencer attenuates the overall sound by 0 dBA. Please confirm. 6/19/2026 Correct. The main function of this additional (resonator) silencer is to reduce low- frequency noise, not the total sum value. 6/23/2026 Acknowledged Y 60 Mechanical App 2 - Technical Specifications 4.2 Please confirm that all exhaust gas ducting, including outside of the engine hall, is included 6/19/2026 Confirmed 6/23/2026 Acknowledged Y 61 General Cover Letter, Proposal Form, Draft Project Schedule There seem to be discrepancies in the equipment delivery date. Please confirm what the DPU delivery date is for the equipment. Please clarify if this date will be guaranteed. 6/19/2026 Everllence's proposal is based on the FCA delivery scheduled for February 2030. At this stage, the delivery of the engines and alternators to the DPU site (Ames, Iowa) and the remaining supply to the DAP site (Ames, Iowa) (not unloaded) is an option. If the option is accepted, we will of course be able to discuss this topic further at a later stage. 6/26/2026 To be discussed in 7/15 meeting Y Discussed in 7/15 interview. Guaranteed FCA updated to August 2029. Cannot guarantee delivery date, but assumed Oct-Nov 2029 62 General Please provide a document to outline the liquidated damages associated with project guarantees. 6/19/2026 Liquidated Damages are indicated in Clause 12 of the Equipment Supply Agreement submitted with Everllence proposal 6/26/2026 Acknowledged Y 63 Mechanical App 2 - Technical Specifications 4.2 Please confirm the SCR system includes Nox analyzers, sampling umbilical, sample line raceway, and the required steel supports. 6/19/2026 Confirmed. Besides the raceway, not part of the system. 6/23/2026 Acknowledged Y 64 Mechanical - 65 Mechanical 'Appendix V PerformanceTestPr ocedure Please confirm if Everllence will perform Reagent Injection Tuning 6/19/2026 Yes, confirmed 6/23/2026 Acknowledged Y 66 General App 2 - Technical Specifications 8.6 Do commissioning services include commissioning management & supervision? 6/19/2026 Yes, but only for the scope of supply of Everllence. 6/23/2026 Acknowledged Y Page 5 of 6 44