1. John Schuh, Ames Resident – July 9, 2026
RE: Mowing city property 1706 Amherst Dr
2. Ann Shuey, Ames Resident – July 20, 2026
RE: Flooding on Nixon Avenue
3. Craig Sackett, Ames Resident – July 21, 2026
RE: Safety concern for road curve located by Stonehaven Apartments
4. Mike McDaniel, Lightedge – July 23, 2026
RE: Lightedge Development Project proposal
5. Mike Frisk, Ames Resident – July 23, 2026
RE: Flooding in North Ames
6. Erin Ollendike, Civil Design Advantage, LLC – July 24, 2026
RE: Request to waive the requirement for Rural Subdivision covenants for a
Plat of Survey at 3500 360th St
7. ISU Interfraternity Council – July 24, 2026
RE: Request for golf cart use for fraternities and sororities
8. Mark Lambert, City Attorney – July 24, 2026
RE: Changes in State Law, SF 2378
From:Ann Shuey
To:City Council and Mayor
Cc:Ann Shuey
Subject:Request for Investigation and Action Regarding July 4 Storm Drain Failure on Nixon Avenue
Date:Monday, July 20, 2026 4:04:05 PM
Some people who received this message don't often get email from annmshuey@gmail.com. Learn why this is
important
[External Email]
Dear Mayor Haila and Members of the Ames City Council,
I am writing to express my serious concerns regarding the apparent stormwater infrastructure failure
that occurred on July 4 and the significant damage it caused to homes on my mother's street, Nixon
Avenue.
My mother is 83 years old, lives on a fixed senior income, and has owned her home on Nixon Avenue
for many years without ever experiencing a flooding issue of this magnitude. Like many responsible
homeowners, she maintained insurance coverage that included sump pump backup protection.
Unfortunately, her claim is now being denied because the damage is being classified as a "flood" rather
than a sump pump backup.
During the July 4 storm, the City's storm drain system backed up to such an extent that water
overflowed into residents' yards, flooded garages, filled window wells, and ultimately entered
basements. Many homeowners suffered thousands of dollars in property damage through no fault of
their own.
What makes this situation particularly troubling is that several years ago, homeowners were required by
the City to connect their sump pump discharges to the storm sewer system. Residents complied with
that requirement in good faith, trusting that the City's infrastructure would be capable of handling
significant rainfall events. Instead, when the storm drains became overwhelmed, the backup appears to
have created conditions that left homeowners vulnerable to flooding from the very system they were
directed to use.
To make matters worse, many insurance companies are denying claims because they contend the water
entered homes as "flood water" through window wells and other openings, rather than solely as a sump
pump backup. As a result, homeowners who believed they had purchased appropriate protection are
being told they are not covered. Many of these homes are miles away from any river, lake, or
designated flood-prone area, and residents had no reason to believe they needed separate flood
insurance.
As residents and taxpayers, we believe the following questions deserve answers:
1. What caused the storm drain system to fail so severely on July 4 on Nixon Avenue?
2. Was the stormwater infrastructure functioning as designed, or were there known capacity
limitations?
3. Has the City conducted, or does it plan to conduct, an engineering review of the affected area?
4. Has the City inspected the storm drains serving Nixon Avenue to determine whether any
blockages, maintenance issues, or system failures contributed to the backup?
5. What improvements are planned to ensure this does not happen again?
6. Will the City consider assistance or relief for homeowners who suffered property damage as a
result of the storm sewer backup?
Most importantly, residents need a clear plan of action. Homeowners should not have to fear that every
significant rain event will result in flooded yards, overwhelmed window wells, damaged basements, and
denied insurance claims. Stormwater infrastructure should be designed, maintained, and improved to
protect neighborhoods—not create additional risks for homeowners.
I respectfully request that the City thoroughly investigate this incident, communicate its findings to
affected residents, and prioritize the infrastructure improvements necessary to prevent future
occurrences. This may include increasing storm sewer capacity, inspecting and clearing existing lines,
implementing additional drainage solutions, installing backflow prevention measures, or pursuing other
engineering remedies recommended by qualified professionals.
The residents affected by this event deserve answers, accountability, and confidence that this situation
will not be repeated. I also ask that the City recognize the financial hardship this has placed on many
families, particularly seniors such as my mother, who now face substantial repair costs despite having
maintained insurance coverage.
Thank you for your attention to this matter. I look forward to learning what actions the City plans to take
to address these concerns and protect homeowners from future stormwater-related damage.
Respectfully,
Ann Shuey
On behalf of a Nixon Avenue homeowner
1
Hall, Renee
From:Craig S <sackett401@gmail.com>
Sent:Tuesday, July 21, 2026 10:57 AM
To:City Council and Mayor
Subject:Fwd: Street Parking Concern
Attachments:IMG_2400.jpeg
[External Email]
Hello,
I am writing to you today to bring a safety concern to your attention regarding the curve
located by the Stonehaven Apartments.
The curve is hazardous as I have almost been hit on numerous occasions from oncoming
traffic while navigating the curve.
I would like to know who the appropriate person or department is to speak with regarding
this issue to see what safety measures can be implemented.
If it is possible, I think making the highlighted area a no parking zone with rid the problem
entirely. I have attached a picture of the area I am referring to.
Thank you for your help and for your service to our community.
Best regards,
<IMG_2400.jpeg>
Craig Sackett
Email: Sackett401@gmail.com
Cell Phone: 641.221.0734
Some people who received this message don't often get email from sackett401@gmail.com. Learn why this is important
1
Hall, Renee
Subject:FW: Lightedge Development in Ames
Attachments:Ames_City_Council_Letter_23Jul2026.pdf
From: Mike McDaniel <mmcdaniel@lightedge.com>
Sent: Thursday, July 23, 2026 8:51 AM
To: City Council and Mayor <mayorcouncil@amescitycouncil.org>
Cc: Schainker, Steve <steve.schainker@cityofames.org>
Subject: Lightedge Development in Ames
[External Email]
Dear Mayor Haila,
Attached is a letter regarding our proposed colocation project in Ames.
As we have continued to engage with City staff, Council members, and the community, we have listened
carefully to the questions and concerns that have been raised. The attached letter outlines a series of
voluntary commitments and proffers that we believe address many of those concerns while reinforcing
our commitment to being a long-term partner to the City of Ames.
Our goal is to develop a project that delivers meaningful economic benefits while respecting the
community’s priorities related to utilities, infrastructure, environmental stewardship, and neighborhood
compatibility. We hope these commitments demonstrate our willingness to work collaboratively and
transparently throughout the development process.
We appreciate the time and consideration the Council has given this project and welcome the
opportunity to discuss any aspect of the attached letter or answer any additional questions.
Thank you for your consideration.
Sincerely,
Mike McDaniel
Mike McDaniel
Lightedge
SVP - Development
D 913-553-5975
Some people who received this message don't often get email from mmcdaniel@lightedge.com.
Learn why this is important
2
M
E
913-219-7392
mmcdaniel@lightedge.com
July 23, 2026
Mayor and Members of the Ames City Council
City of Ames
515 Clark Avenue
Ames, Iowa 50010
Dear Mayor and Council Members,
On behalf of Lightedge, thank you to the Council, City sta , and the Ames community for the time
and thoughtful consideration you have given our proposal. We recognize that projects like this raise
important questions, and we appreciate the opportunity to address those concerns directly.
Throughout this process, we've listened carefully to questions about utility capacity, water use,
lighting, noise, and long-term accountability. Those are reasonable questions, and we are prepared
to address each with binding commitments in a Site Development Plan, Development Agreement
Lease, or other mutually acceptable agreement.
Lightedge helps hospitals, banks, manufacturers, governments, and businesses securely store and
protect the digital infrastructure they rely on every day. In practical terms, that means bank
branches that run more e iciently for customers, healthcare providers who can focus on patients
instead of technology, and schools and local governments that can depend on the everyday
systems they use without interruption. We understand that being a good technology partner also
means being a good community partner and unlike a large-scale campus built to serve national
or global computing demand, this facility is sized specically to meet the everyday needs of
institutions right here in Ames.
Utility Usage and Infrastructure
Lightedge will fully fund any utility upgrade needed solely because of this project, and/or pay
our proportional share of any improvement that benets the broader system.
We will ensure that any required substation be built to City specications and transferred to the
utility upon completion.
Though the on-site generator plant is typically permitted for emergency use only, Lightedge will
work with the City's utility to explore emergency support or limited peak-shaving running our
backup generators briey during the City's highest-demand periods to reduce strain on the
local power grid subject to noise and air quality compliance.
Water Conservation
Water is the question we hear most from Ames residents, and rightly so it's the resource this
community depends on and cares most about protecting. We want to be direct about our approach
rather than leave it as a technical detail: this facility is designed to reuse the water in its cooling
system rather than continuously draw new water from the City supply, and to use only a small
fraction of what a large-scale facility would require. We believe this approach reects the Citys
broader commitment to sustainable growth, responsible stewardship of public resources, and
thoughtful long-term planning as reected in the Climate Action Plan, and we welcome the
opportunity to work with City sta to ensure the project complements those goals wherever
appropriate.
The facility is expected to use less than 10% of Iowa's threshold for a large water user the
states regulatory category for facilities with the highest water demand during normal
operations. Iowas large-user threshold is 25,000 gallons/day; our project falls well short of
that threshold. In addition, we will use only City-supplied domestic water and will not seek
large-user designation without prior written approval from the City Manager or Council.
Normal use covers restrooms, routine cleaning, and irrigation. Limited non-routine use may
occur for initial cooling-loop ll/ush, wintertime humidication, and re suppression.
Cooling is a closed loop system with air-cooled chillers meaning heat is removed using fans
and refrigerant, similar to a large air conditioner, rather than by evaporating water, and the water
in the system is recirculated and reused rather than continuously drawn from and returned to
an outside source. No open-loop or evaporative cooling methods that rely on continuously
consuming new water to cool the air is in any phase of the project's design.
We recognize a commitment is only as good as a community's ability to verify it. We welcome the
City identifying an independent party to conrm our water use against these commitments on an
ongoing basis, funded through the escrow described below, so this remains a standard the City can
check for itself rather than take on our word alone.
Wastewater Protection
The facility will comply with all City wastewater requirements.
Discharge from the initial cooling-loop ush will be sampled and coordinated with the City's
utility beforehand. Any water exceeding discharge standards will be hauled o -site for
permitted treatment and disposalrather than discharged to the City system.
Outdoor Lighting
All xtures will be fully shielded, with no light emitted above the horizontal plane.
A full photometric plan will be submitted with the Site Development Plan and revised as needed
until it meets City requirements.
Maximum point illumination after 10:00 p.m. will not exceed six foot-candles roughly the
brightness of a well-lit parking lot, well below typical commercial lighting levels.
Noise Monitoring and Accountability
We propose a project-specic noise framework that exceeds current industrial zoning standards
and provides the City with ongoing transparency and accountability. Technical commitments
include:
Binding limits of 70 dBA / 65 dBC during normal operation comparable to the sound of a
normal conversation or household air conditioner at the property line with temporary limits
of 80 dBA / 75 dBC, closer to a passing truck, permitted only during scheduled maintenance or
utility power instability.
A permanent acoustic monitoring system tracking dBA, dBC, and octave-band frequency data
di erent measurements of loudness and pitch feeding an ISO 9613-2 propagation model,
an internationally recognized method for predicting how sound travels outdoors, that estimates
our facility's contribution at surrounding locations via continuously updated noise maps.
Near real-time City access to both raw monitoring data and modeled maps, with post-
commissioning eld validation of model accuracy.
If validated data shows an exceedance: an interim report will be given to the City within 10 days,
showing identication of cause, as well as corrective action within 30 days. If unresolved after
that cure period, We will support enforcement penalties up to the maximum allowed under
Iowa Code § 364.22 (currently $750 for a rst violation, $1,000 thereafter, with each day a
separate o ense) beyond what Ames Municipal Code Chapter 16 currently provides, subject
to legal counsel review and nal agreement language.
Escrow for Independent Review
Lightedge will establish a $30,000 escrow account to reimburse the City's consulting and
professional services needed to prepare and nalize this agreement, including independent
verication of the water and noise commitments described above.
These project-specic commitments are part of a broader company-wide approach to
environmental stewardship. Lightedge has adopted Science Based Targets initiative (SBTi)-
validated greenhouse gas reduction targets, including a commitment to achieve net-zero emissions
across its value chain by 2050 and signicant near-term emissions reductions. While those
commitments apply across our operations, they reect the same emphasis on responsible growth,
resource e iciency, and long-term accountability that guides this project.
In closing, we recognize that trust is earned, not requested. That is why we are voluntarily o ering
commitments that go beyond existing zoning requirements and that provide measurable standards,
transparency, and accountability. We believe these commitments demonstrate how seriously we
take our responsibility to both the City and our neighbors and we believe a facility built at this
scale, with this level of accountability and resource e iciency, reects the same commitment to
responsible stewardship, long-term accountability, and thoughtful community investment that the
City has embraced through its Climate Action Plan.
We look forward to continuing to work with the Council, City sta , and the Ames community to
ensure this project reects the values and expectations of Ames.
Respectfully,
Rob Carter
CEO
4 1 2 1 NW UR B A N DA L E D R I V E , UR B AN D AL E , I OW A 5 0 3 2 2 • P 5 1 5 + 3 6 9+ 4 4 0 0 • W W W . C D A- E NG . CO M
July 24, 2026
Honorable Mayor & City Council
City of Ames
c/o Justin Moore, Planner
515 Clark Avenue
Ames, Iowa 50010
RE: 3500 360th Street – Story County
Parcels 1019100105 & 1019100210
Waiver – City Subdivision Requirements
Honorable Mayor & City Council;
On behalf of Des Moines Heavy Industrial LLC and Ag Land Specialist, LLC, we respectively request
that the Ames City Council grant a waiver from the City’s subdivision requirements and Urban Fringe
Land Use designation of Natural Area to allow the properties listed above to be final platted. We
understand that the City’s policies generally discourage land divisions resulting in parcels smaller than
35 acres and the city has subdivision jurisdiction over properties with a two-mile radius of city limits on
parcels less than 35 acres. Our request to waive these requirements is based on the unique
circumstances of this property and the development that has occurred between this property and the
city of Ames corporate boundaries.
Properties along the eastern side of the 560th Avenue corridor have been developed into mineral
extraction operations that are used in conjunction with concrete and HMA paving companies. In
October of 2025, CTI Ready Mix had a site plan approved by Story County to allow for the construction
of a concrete batch facility located on property owned by Des Moines Heavy Industrial LLC. For CTI
Ready Mix to purchase the property for construction a final plat is needed to split off 3.6 acres of
property. CTI Ready Mix is owned by the same individual that owns the property to the east which is
under the ownership of Ag Land Specialist, LLC. In lieu of purchasing the property the property owners
have agreed to a land swap which necessitates the creation of a second final plat to create the second
parcel which is the same size for the land swap. Future plans for the property owned by Ag Land
Specialist, LLC would include mineral extraction similar to the two adjacent properties to the north.
There is currently an agreement in place between Des Moines Heavy Industrial LLC and Ag Land
Specialist, LLC to allow CTI Ready Mix to utilize materials out of the current extraction occurring to the
north. These uses would be complimentary businesses to what is already in place along the corridor.
Before the site plan was approved, city staff indicated that the properties along this roadway are not
expected to be annexed into the City of Ames in the foreseeable future, if ever, and that city utilities are
not expected to be available for connection. Based on that guidance, CTI Ready Mix proceeded
through Story County to obtain approval of a site plan with private utility improvements.
For the reasons outlined above we would like to request that the Ames City Council grant a waiver from
the City’s subdivision requirements to allow the proposed final plats to proceed without requiring
compliance with the City’s full subdivision improvement standards. We appreciate your consideration of
this request and would be available for any questions you might have. Thank you.
Sincerely,
CIVIL DESIGN ADVANTAGE, LLC
Erin K. Ollendike, P.E.
1
Hall, Renee
From:Mike Frisk <mike@fpmofames.com>
Sent:Thursday, July 23, 2026 12:03 PM
To:City Council and Mayor
Subject:North Ames Flooding Concerns
[External Email]
Mayor and Council Members,
Thank you for reading this. I know you receive many emails from people who wish to vent. I do
appreciate what you do and know that you are looking out for our great City and its people.
I am a concerned citizen of Ames. I am frustrated with the flooding that occurred in North Ames on July
3rd and 4th, 2026.
I fully understand that stormwater retention can only handle so much before flooding occurs in areas
that normally don't flood. I was out of town for the 4th of July with family, but I know many residents and
friends in Somerset where I live and North Ames experienced flooding in basements and on streets, and
saw storm drains overflow in ways we haven't seen before. This raises concerns about the next
significant rainfall.
I met with Mindy Bryngelson, City Engineer at one of my problem areas, 2713 Luther Drive. Mindy is
working with City Staff to have the city-owned drain televised to better understand 1) the drain's size and
2) whether the pipe has an issue or simply couldn't handle the volume. This has been a recurring
problem that has often come close to causing bigger issues. I have previously added in better drainage
around our building and installed sump pumps outside of the garden-level apartment accesses to help
mitigate this recurring situation. We got over 2 feet of water in all 4 units. I have had to cancel leases and
I am currently gutting the 4 units and starting over without insurance coverage. I estimate the damage at
just this one property to be over $150,000. I need help finding answers regarding this drain and what can
be done to resolve this problem or I fear I will have to deal with this again.
I had another complex just North of the mall where 6 of the 8 garden-level units flooded; at 3000
Regency, a duplex on 28th Street, the furnaces and washer/dryers were ruined, and at a beautiful house
on Taft, the furnace, carpet, pad, drywall, trim, doors, were ruined in the basement. I know Ames Ace
Hardware had over 2 inches of water in their building as well.
I ask the council for two things today:
I request that the City Council include the North Ames area around the North Grand Mall in the existing
flooding study. I understand that a study is currently underway regarding flooding in other areas the
council has deemed necessary.
Some people who received this message don't often get email from mike@fpmofames.com. Learn why this is important
2
Please prioritize and place on a future agenda item to discuss the issues affecting residential
homeowners, rentals, and commercial flooding in the City of Ames. Please utilize City Engineers or
Private Engineers to make sure we as a City are doing our part to keep the flooding down where it is not
affecting people places they live or visit. This is devastating and affects more people than we all think. I
coach HS girls basketball and I always remind my players to control the controllables. Some things are
out of our hands and some things are not. I am just wondering if we are doing everything we can and
should be doing. I don't know that answer but I think we as a City and Council need to ask the questions
to feel confident about what we can control.
If you have questions please don't hesitate to ask.
Sincerely,
--
Mike Frisk
2425 Kingston Drive
Ames, IA 50010
First Property Management
Broker/Owner
mike@fpmofames.com
Office: 515-292-5020
Cell: 515-231-7150
B#38441000
1
From: IFC VP of Recruitment [SFE] <ifcrecruitment@iastate.edu>
Sent: Friday, July 24, 2026 9:20 AM
To: Schainker, Steve <steve.schainker@cityofames.org>
Cc: Canaday, Casey R [SFE] <canaday@iastate.edu>; Olberding, Austin [SFE] <aolber@iastate.edu>; Boulden, Billy [SFE]
<bboulden@iastate.edu>; Van Dyke, Kipp J [D S O] <kipp@iastate.edu>; Michael Newton <mrnewton@iastate.edu>
Subject: Golf Cart Request
[External Email]
Mr. Schainker,
You don't often get email from ifcrecruitment@iastate.edu. Learn why this is important
2
We are writing as the Vice Presidents of Recruitment for the Collegiate Panhellenic Council and the
Interfraternity Council, which govern the sororities and fraternities at Iowa State University. Each year in
August, we host our formal recruitment processes, which take place this year beginning on August 14th
and concluding on August 20th. Last year, during the formal recruitment process, we welcomed
approximately 750 incoming students to Iowa State between the Collegiate Panhellenic Council and
Interfraternity Council. To participate in the process, these students move to campus early, allowing
them to focus on formal recruitment prior to the school year starting. The purpose of formal recruitment
is to allow these students to find the sorority or fraternity that matches their values and provides lifelong
opportunities and connections. Over the course of this recruitment process, these incoming students
travel to and from sorority and fraternity houses to Seasons Dining Hall, the Memorial Union, and their
residence halls. For this experience to be fully inclusive and accommodate varying abilities, we are
requesting the use of golf carts as a means of transportation for official business purposes only, as
outlined in the plan below.
The large majority of golf cart use will be on Iowa State’s campus and in “Greekland”, directly south of
campus across Lincoln Way. The roads that will need to be used for transportation outside of Iowa
State’s campus include:
Beach Ave. north of Lincoln Way to get to and from Seasons dining hall and south of
Lincoln Way to Sunset Drive
Along Sunset Drive, Gray Ave., Greeley Street, Pearson Ave., Gable Lane, and Knapp Street
Ash Ave. from Lincoln Way to Knapp Street
Lynn Ave. from Lincoln Way to Storm St. and Storm St. From Lynn Ave. to Wallace and
Wilson Halls (Towers)
If a student living in Wallace or Wilson Halls requires transportation accommodations, we
will need to pick up and drop off at their residence hall. If no students living in Wallace or
Wilson Halls require transportation accommodations, golf carts will not go beyond Knapp St.
from Lynn Ave.
We recognize that Lincoln Way is a heavily trafficked road and would like to implement a plan to cross
Lincoln Way as few times as possible. While the Memorial Union is our “Recruitment Headquarters” and
where golf carts will be parked overnight, once the golf carts have crossed Lincoln Way to start the day,
we intend to keep them south of Lincoln Way until the events have concluded for the day. The only
exception of this would be to transport students requiring accommodations to dining halls for meals.
Along with this, we would like to reduce driver access to a small, designated group of people: seven
Sorority and Fraternity Engagement staff members, and six members each from the Collegiate
Panhellenic Council and Interfraternity Council each for a total of 19 potential drivers. All potential
drivers will complete a motor vehicle records check through Iowa State University. Additionally, we
would only use golf carts between sunrise and sunset, intentionally scheduling students requiring golf
cart transportation during daylight hours.
Additionally, due to construction on Sunset Drive, it will be very difficult for participating students to get
to and from sorority and fraternity houses in both a safe and timely manner. In previous years, students
have easily traveled around the Sunset Drive, Gray Avenue, Greeley Street, and Pearson Avenue loop.
The closure of the roads and sidewalks at the cross streets of Sunset Drive and Gray Avenue require
students to take a much longer route to get from one house to the next, and we would like to use golf
carts to help with transportation in order to avoid the construction.
3
The Collegiate Panhellenic Council will use the golf carts as follows: 3 golf carts equipped with proper
signage and flags will be used to transport students requiring accommodations on August 14-20.
The Interfraternity Council will use the golf carts as follows: 3 golf carts equipped with proper signage
and flags will be used to shuttle men to and from fraternity houses with great distances between them.
On Sunday, August 16th, this will be a shuttle service from Sigma Nu fraternity house to Seasons dining
hall. On Monday, August 17th, golf carts will not be used unless a student requires transportation
accommodations. On Tuesday and Wednesday, August 18th and 19th, we will provide a shuttle route
from the eas
Nu (ΣN). A map of the sorority and fraternity chapter facilities is included.
We strongly believe that the use of golf carts is the safest and most appropriate means of transportation
to make frequent stops to pick-up and drop-off students. If we are unable to use golf carts, we will have
to use vehicles or large passenger vans to transport students, which is far more challenging to navigate
with other drivers on the roads unknowing of the frequent stops we need to make.
We kindly ask that you consider our request to use golf carts for the dates of August 14th-20th to make
the recruitment experience possible for all students with varying needs and abilities. Thank you for your
time and consideration. We are more than willing to comply with any regulations or policies needed to
accommodate this request.
Sincerely,
Nora Graening and Maycin Sansgaard - Collegiate Panhellenic Council
Braydon Foster and Aaron Verdun - Interfraternity Council
CC:
Casey Canaday, Coordinator of Chapter and Council Operations, Sorority and Fraternity Engagement
Austin Olberding, Coordinator of Chapter and Council Operations, Sorority and Fraternity Engagement
Billy Boulden, Assistant Dean of Students for Student Leadership and Development/Director of Sorority
and Fraternity Engagement
Kipp Van Dyke, Associate Vice President for Student Affairs and Dean of Students
Chief Michael Newton, Associate Vice President for Public Safety and Chief of Police
Aaron Verdun & Braydon Foster
Interfraternity Council
Vice Presidents of Recruitment
Aaron: 815-419-8320
Braydon: 319-213-3252
Caring People Quality Programs Exceptional Service
515.239.5146
Legal Department
To:
From:
Date:
Subject:
SF 2378, enacted this year, made some changes that the Council may wish to
address.
ZONING PROTESTS
SF 2378 repealed a paragraph in the state law (Iowa Code section 414.5)
regarding zoning, eliminating the language that stated that if a written protest,
signed by twenty percent or more of the area of the lots included in the
proposed zoning change or repeal, was filed with the City Clerk before or at the
public hearing, it would trigger a requirement that three-fourths of the Council
would have to vote in favor of the zoning change (instead of a simple majority of
the Council).
We have the same requirement in our municipal code, at section 29.1507(8).
It is likely that the only reason that we have this provision in our municipal code
was because of the state law requirement. Now that the state requirement has
been repealed, the Council may wish to consider repealing the Ames Municipal
Code requirement or can choose to retain the municipal code language.
APPEALS TO COUNCIL OF VARIANCES APPROVED BY ZBA
The legislation also grants a right to an “affected person” to appeal to the
City Council the Zoning Board of Adjustment’s (ZBA) approval of a
variance.
A longstanding provision of Iowa law (Iowa Code section 414.7(2)), has allowed
a city council, on its own motion, to review a Board of Adjustment’s granting of a
variance. Under this law, the Council could only review the variance and then
can choose to remand it back to the ZBA for further study -- no other action by
the Council is allowed. This provision requires an ordinance to be in place
detailing the process before the Council can exercise this authority. There has
never been such an ordinance in Ames, so the City Council has never exercised
this authority.
The new legislation creates a right for “a person affected by the variance”
to appeal the ZBA’s granting of a variance to the City Council within 60
days of the ZBA’s decision. (Note: this is only for variances that have been
approved by ZBA, not for variance requests that have been denied by the ZBA).
The new law states that the Council, by a 2/3 vote, may overturn a variance
approved by the ZBA. The Council would be able to overturn an approved
variance whether the Council reviews the variance through an affected person’s
appeal or whether the Council reviews the variance on its own motion.
There are two things the Council may wish to consider:
1. Whether the Council wants to enact an ordinance giving the Council the
authority, on its own motion, to review variances approved by the ZBA, or
continue with the status quo of the Council not giving itself that authority.
2. Regarding the new provision allowing an affected person to appeal a
approved variance to the City Council, it seems prudent to have an ordinance in
place detailing the process for such appeals.
Staff recommends that the Council adopt a motion to place these issues
on a future agenda for consideration.