Loading...
HomeMy WebLinkAbout~Master - Resolution approving Change Order No. 10 with Woodruff Construction, of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 ProjectRESOLUTION NO. 26-446 RESOLUTION APPROVING CHANGE ORDER NO. 10 ON CONTRACT WITH WOODRUFF CONSTRUCTION, OF AMES, IA, FOR WATER POLLUTION CONTROL FACILITY NUTRIENT REDUCTION MODIFICATIONS PHASE 1 PROJECT FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 10 in the amount of $230,920.52 on contract with Woodruff Construction, of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 14th day of July, 2026. _______________________________ _________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Junck Seconded by: Beatty-Hansen Voting aye: Beatty-Hansen, Betcher, Corrieri, Junck, Gartin, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 14th day of July, 2026.