HomeMy WebLinkAboutA001 - Council Action Form dated July 14, 2026ITEM #:41 DATE:07-14-26 DEPT:PW SUBJECT:RESOURCE RECOVERY AND RECYCLING CAMPUS CONSTRUCTION - CHANGE ORDER COUNCIL ACTION FORM BACKGROUND: On March 24, 2026, the City Council approved final plans and specifications and awarded contracts for the construction of the Resource Recovery and Recycling Campus (R3C). At that meeting, 11 separate bid packages (BPs) were award to various contractors. Ten change orders have been approved for the various bid packages to date, with the majority of the changes resulting from the value engineering process that occurred follow bid opening. City staff indicated to City Council in a memo on May 12, 2026 that unsuitable soil and buried rubble had been uncovered at the R3C site and that a change order would be forthcoming once the scope of work was better defined. During conceptual and final design efforts a total of 21 soil borings were taken to characterize the existing soil conditions expected on site. Though the soil borings did indicate areas of existing fill on the site, the extent of the unsuitable soils across the 9.5 acres was not readily apparent until construction activities began. The R3C site development work was designed such that in any areas where excavation is necessary, the excess soil could be utilized in areas where fill is necessary to increase the site elevation. The eastern portion of the site was utilized as a yard waste area for many years prior to the City acquiring the property. Though the existing yard waste was removed from the site and the site returned to the original elevation, one to two feet of the upper part of the site were compressed through the years and contained partially decomposed yard waste. This material was not suitable as fill for the R3C construction because the amount of organic material it contained was too high to use as compacted fill, and testing indicated the decomposition process was too far along for the material to provide value as compost. Staff and Story Construction were able to identify two locations within three miles that would accept the material as cover at no cost. For each cubic yard of material that was trucked off the site, an equal amount of suitable fill material was required to be imported. Con-Struct was able to import material from stockpiles that were adjacent to the project site. In total, 490 loads, or approximately 7,350 cubic yards of unsuitable material were removed and replaced at a cost of $136,051. This equals a unit cost of $18.51 per cubic yard. This unit cost is in alignment with recent bid costs in other Public Works projects that range from $15 to $30 per cubic yard for similar work. 1 Additionally, other areas of the site had been filled in by previous owners over the course of their ownership. Pockets of large buried concrete rubble, debris, and other material that would be best classified as garbage were encountered during excavation. The debris and garbage materials were removed and disposed of at the landfill. The concrete rubble was not suitable for recycling due to the amount of dirt contamination. Rather than haul away the concrete rubble, it was moved to one of the storm water detention areas and buried a minimum of 6 feet below the bottom of the stormwater detention area. This area is outside of any future potential expansion of the R3C site. The excess material from the excavation was necessary for the additional fill during site development activities. The cost of this work was $24,800. Change Order No. 2 to Con-Struct, Inc of Ames, IA in the amount of $160,851 ($136,051 + $24,800) is the combination of two work activities noted above. Revenue for this change order will come from the project contingency fund which currently has $582,358. A summary of awarded project contracts and proposed change orders is below: BID PACKAGE CONTRACTOR AS BID AMOUNT PREVIOUSLY APPROVED CHANGE ORDERS PROPOSED CHANGE ORDER REVISED CONTRACT TOTALS 01-1 – General Construction Work RH Grabau Construction, Inc., Boone, IA $1,601,000 ($126,538) $1,474,462 03-1 – Concrete and Steel Work Jensen Builders, Ltd., Des Moines, IA $4,675,500 ($174,948.97) $4,500,551.03 09-1 – Gypsum Board Assembly Work Heartland Finishes, Inc., Des Moines, IA $430,675 ($30,000) $400,675 14-1 – Elevator/Lift Work TK Elevator Corporation, Urbandale, IA $109,800 -- $109,800 21-1 – Fire Suppression Systems Work Tri-City Fire Protection LLC, Davenport, IA $169,284 -- $169,284 22-1 – Plumbing & HVAC Work ACI Mechanical, Inc., Ames, IA $1,180,000 -- $1,180,000 26-1 – Electrical, Communications, & Electronic Safety and Security Work Enterprise Electric, Inc., Boone, IA $1,329,000 ($50,970) $1,278,030 2 Budgeted Revenues Budgeted Expenses Revenue Abated G.O. Bonds $22,006,730 Land Acquisition (220, 306, 312, 318, 400 Freel Drive)$1,077,500 Fleet Services Reserve Fund 425,000 Due Diligence prior to closing 15,465 FY 2025/26 Stormwater Quality Improvements CIP 159,077 Conceptual Design and Financial Modeling 50,000 Electric Services Rebate 3,000 Final Design 965,715 Solid Waste Alternatives Program (SWAP) Grants 100,000 Final Design Contingency 75,000 Permitting 38,000 Construction Contracts (as bid)$19,619,767 Previously approved change orders (1,627,770.97) Proposed Change Order #2 (this Council Action)160,851 Construction Incentives 100,000 Items by Owner (FFE/Cameras/Fiber Network/Tree Clearing) 266,600 Construction Contingency (revised)421,507 31-1 – Site Demolition & Earthwork Con-Struct, Inc., Ames, IA $575,000 $57,717 $160,851 (this Council action) $793,568 32-1 – Paving & Sidewalk Work Lakeside Contractors, LLC, Ames, IA $1,028,129 ($16,410) $1,011,719 33-1 – Site Utility Work On Track Construction LLC, Nevada, IA $723,370 ($31,695) $691,675 40-1 – Millwright/Process Integration Work RRT Design & Construction, Melville, NY $7,798,009 ($1,254,926) $6,543,083 ORIGINAL BID TOTAL $19,619,767 SUM OF CHANGE ORDERS ($1,627,770.97)$160,851 REVISED CONTRACT TOTAL $18,152,847.03 A revised project budget is provided below: 3 Construction Inspection (est)75,000 Construction Manager Fee (Fixed fees plus 2.25% of contract amounts) (revised) 956,479 Construction Manager General Conditions Costs (est.) 448,000 R3C Construction Revenue Subtotal $22,693,807 R3C Construction Subtotal $22,642,113.03 Electric Utility Fund $2,340,000 Mobile Equipment (transfer trucks and trailers)$2,340,000 G.O. Bonds $975,000 Unobligated G.O. Bonds 225,000 Water Utility Fund 40,000 Freel Drive Paving (as bid + contract admin)$1,102,310 Total Project Revenues $26,273,807 Total Project Expenses $26,066,904.03 ALTERNATIVES: 1. Approve Change Order No. 2 to Con-Struct, Inc of Ames, IA, in the amount of $160,851. 2. Do not approve the change order and direct staff to make other modifications to the project. CITY MANAGER'S RECOMMENDED ACTION: A portion of the the soils encountered onsite during excavation did not meet project specifications to support construction of the R3C. Staff has worked closely with the contractor to identify these locations and has implemented cost effective solutions while keeping the overall project in alignment with the schedule necessary to begin operations at the R3C before July 1, 2027. Therefore, it is the recommendation of the City Manager that the City Council approve Alternative 1, as described above. 4