HomeMy WebLinkAboutA012 - Resolution approving preliminary plans & specs for 2026/27 Airport Airside Improvements Project (Reconstruction of Runway 01/19)ITEM #:13 DATE:06-09-26 DEPT:PW SUBJECT:2026/27 AIRPORT AIRSIDE IMPROVEMENTS (RECONSTRUCT RUNWAY 01/19) COUNCIL ACTION FORM BACKGROUND: The Capital Improvements Plan (CIP) includes the Airport Airside Improvements program, which provides for the reconstruction of Runway 01/19 and associated airfield improvements at the James Herman Banning Ames Municipal Airport. The project is programmed in FY 2025/26 and FY 2026/27 and represents a major airfield infrastructure investment intended to maintain long-term operational reliability, safety, and compliance with Federal Aviation Administration (FAA) design standards. Runway 01/19 is the primary runway at the Airport and has reached a condition where full reconstruction is needed. The existing pavement has a Pavement Condition Index (PCI) score of 45 out of 100 and is in need of full replacement. On April 8, 2025, the City Council approved a Professional Services Agreement with Bolton & Menk, Inc. for design, FAA coordination, construction phasing, bidding documents, and grant administration services associated with the project. On September 9, 2025, the City Council accepted an FAA Airport Improvement Program (AIP) grant agreement in the amount of $1,140,095 to fund the design phase of the project. At the May 26, 2026 City Council meeting, staff provided an informational update regarding the anticipated two-part FAA construction grant process, phased Notices to Proceed, construction sequencing, runway closure impacts, and the planned approach for bringing the project forward for bidding and future grant consideration. No action was requested with that report; it was instead intended to make the City Council aware of the unusual grant timing and phased project delivery strategy before formal action on the project. (Note: A copy of the report has been attached for reference.) The project includes full reconstruction of Runway 01/19 and associated airfield improvements, including portions of taxiways, lighting, drainage, grading, signage, and pavement markings necessary to maintain FAA design standards and long-term operational functionality. The runway is being designed to support regular use by larger business jet aircraft and to accommodate aircraft operations up to approximately 100,000 pounds without special operating restrictions. The project also includes work associated with airfield navigational aids . Although these NAVAIDs are owned and operated by the FAA, the FAA requires the Airport owner to reimburse FAA staff costs associated with project-related work on these facilities. These reimbursement costs are eligible for FAA grant participation as part of the project. 1 Although the Airport Master Plan conceptualizes a future extension to Runway 01/19, no runway extension is included as part of this project. However, the improvements are being designed to accommodate potential future extension considerations without jeopardizing the current investment. The FAA has indicated that construction funding is anticipated to be awarded through two separate grants over two federal fiscal years. The project specifications and contract documents have been prepared with phased Notices to Proceed (NTPs) tied to anticipated FAA grant authorizations. This approach is intended to limit the City’s financial exposure while ensuring that each authorized portion of work results in a usable unit of work and does not leave the runway in an unusable condition if grant timing changes. Preparatory work and drainage improvements are anticipated to begin in late 2026 without runway closures. Major runway paving and runway closure activities are anticipated during calendar year 2027, with Runway 01/19 anticipated to be closed from April through October 2027 and Runway 13/31 anticipated to be closed from July through September 2027 during runway intersection reconstruction activities. Remaining restoration and closeout activities are anticipated to extend into 2028. The Engineer ’s Opinion of Probable Cost for the construction work to be bid is $24,415,000. The total construction phase project cost, including professional services and FAA reimbursement costs, is estimated at $27,980,000. Final project costs will be dependent upon bid results and FAA participation eligibility. The FY 2024/25 Capital Improvements Plan included a standalone Airport drainage improvement project with an estimated cost of $250,000, including $25,000 from the Airport Improvements Fund as the local match. During final project development, the FAA authorized these drainage improvements to be incorporated into the Runway 01/19 Reconstruction Project as eligible work. As a result, approval of the plans, specifications, form of contract, and estimate of cost for this project will also authorize the reprogramming of the previously budgeted $25,000 Airport Improvements Fund contribution from the standalone drainage improvement project to the Runway 01/19 Reconstruction Project. This action does not increase the overall Airport Improvements Fund commitment previously programmed by the City, but instead allows the drainage improvements to be completed as part of the larger runway reconstruction effort. The project also includes a Bid Alternate A to replace the shelter that houses the precision approach equipment at the end of runway 01/19. The project is anticipated to be funded primarily through FAA Airport Improvement Program (AIP) grants, with local matching funds provided through General Obligation Bonds and Airport Improvement Funds consistent with the adopted CIP. The table below summarizes the anticipated revenues and expenses associated with the project. 2 Fiscal Year Revenues Amount Expenses Amount Design Phase Design Phase 2024/25 Federal Grant - Design (95/5)$1,140,095 PSA Design $1,196,000 2024/25 Airport Improvements Fund $130,000 Design Independent Fee Evaluation (IFE)$3,500 Construction Phase Construction Phase 2025/26 Federal Grant - Construction (95/5)$10,450,000 Construction Independent Fee Evaluation (IFE)$5,000 2026/27 Federal Grant - Construction (90/10)$15,282,000 PSA Amendment 1: AGIS Design Survey $120,000 2024/25 Airport Improvements Fund (Reprogrammed) $25,000 PSA Amendment 2: Construction Admin $2,500,000 2025/26 G.O. Bonds $531,750 PSA Amendment 3: Glide Slope Coordination $150,000 2026/27 G.O. Bonds $623,250 Construction: Base Bid Div A + Div B $24,182,500 2026/27 G.O. Bonds (previously issued)$975,000 Construction: Bid Alternate A $232,500 2026/27 Airport Improvements Fund $42,500 Work By FAA on Navaids Glide Slope - Watts Antenna - Refurbishment Kits, Assistance and Setup $320,000 FAA RA - End Fire Glide Slope Design Review $100,000 FAA RA - End Fire Glide Slope Construction Observation and Support $200,000 FAA Flight Check for Visual Navaids $50,000 FAA Flight Check for Electronic Navaids - End Fire Glideslope, Localizer, MALSR $120,000 Total Revenue $29,199,595 Total Expense $29,179,500 3 ALTERNATIVES: 1. Approve the preliminary plans and specifications for the 2026/27 Airport Airside Improvements Project (Reconstruction of Runway 01/19); establish June 30, 2026, as the date for receipt of bids; and establish July 14, 2026, as the date of public hearing and consideration of bids. 2. Direct staff to make changes to the project plans and specifications. CITY MANAGER'S RECOMMENDED ACTION: The reconstruction of Runway 01/19 is necessary to maintain the long-term safety, operational reliability, and functionality of the Ames Municipal Airport. The project will replace deteriorated pavement infrastructure, improve associated airfield systems, and maintain compliance with applicable FAA design standards while positioning the Airport to continue serving existing and future aviation needs. Staff has worked closely with consultant and FAA staff to ensure grant funding opportunities align with the project scope and timeframe to minimize the downtime of the airport during construction. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as noted above ATTACHMENT(S): FAA Authorization to Bid Runway Staff Report.pdf Runway 1-19 Overview Map 4 U.S. Department of Transportation Federal Aviation Central Region 1100 Main St. Suite 800 Administration Iowa, Kansas, Missouri, Nebraska Kansas City, MO 64105 May 22, 2026 Mr. Damion Pregitzer Traffic Engineer City of Ames 515 Clark Avenue Ames, IA 50010 Re: Ames Municipal Airport (AMW); Ames, IA Potential Grant No. 3-19-0004-034/036 Reconstruct Runway 1-19 Subject: Concurrence to Advertise for Bids Dear Mr. Pregitzer: Safety Plan At this time, the Construction Safety & Phasing Plan (CSPP) is under review within OE/AAA (Aeronautical Study Number 2026-ACE-3114-NRA). Our approval of the construction safety plan is contingent upon proper resolution of any comments that result from the aeronautical review. Once the internal review is complete, you will receive the formal approval of the CSPP. Concurrence to Advertise for Bids After you have incorporated the attached comments and submitted written responses to our comments, you may advertise the project. We are open to discussion regarding any comments you do not understand or with which you disagree. Our review does not relieve you, the Sponsor, or your Engineer of the responsibility for the accuracy, completeness, and technical content of the plans and specifications. What you need to submit now • An annotated copy of the review comments, indicating how each comment was addressed (if you have not done so already). • One copy of the As-bid advertised Plans, Specifications, and Final Engineer’s Report. • Draft Engineering Agreement for Construction Observation Services for review, if applicable. What you need to submit after you open bids • Consultant Evaluation of Bids • Sponsor Recommendation for Award of the Construction Contract • Bid Tabulation • Buy American Certification Form • Proposal of the Successful Bidder (Proposal Form, DBE Forms, etc.) 5 Page 2 of 2 AMW 034/036 Ready to Advertise • List of DBE subcontractors including each DBE’s name, phone number, the dollar amount and nature of their work, and evidence of when and by whom they were last certified (their current DBE certification) What we will do next Upon receipt of the above information we will be in a position to evaluate the bids and offer our concurrence in award. Please note that any construction contract awards made prior to receipt of our letter could jeopardize Federal participation in the project. Questions If you have any questions, please contact me at (816) 329-2628 or ryan.m.dametz@faa.gov. Sincerely, Ryan DaMetz, P.E. State Airport Engineer - Iowa 6 ITEM #:40 DEPT:PW May 26, 2026 Staff Report UPDATE ON RUNWAY 01/19 RECONSTRUCTION PROJECT BACKGROUND: Runway 01/19 is the primary runway at the Ames Municipal Airport and has reached a condition where full reconstruction is needed to maintain long-term operational reliability and safety. The existing pavement has a Pavement Condition Index (PCI) score of 45 out of 100 and is in need of full replacement. On April 8, 2025, the City Council approved a Professional Services Agreement with Bolton & Menk, Inc. for project design, FAA coordination, construction phasing, bidding documents, and grant administration. On September 9, 2025, the City Council accepted an FAA Airport Improvement Program (AIP) grant agreement in the amount of $1,140,095 to fund the design phase of the project. The construction and inspection portion of the project continues to be coordinated with FAA staff regarding future construction grant timing and eligibility. This portion of the project is programmed in the City’s Capital Improvements Plan (CIP) in two fiscal years: FY 2025/26 ($10,635,000) and FY 2026/27 ($16,440,000), for a project total of $27,075,000. PROJECT OVERVIEW: The project includes full reconstruction of Runway 01/19 and associated airfield improvements, including certain taxiways, lighting, drainage, grading, signage, and pavement markings necessary to maintain FAA design standards and long-term operational functionality. The runway is being designed to support regular use by larger business jet aircraft, with a proposed pavement section intended to accommodate aircraft operations up to approximately 100,000 pounds without special operating restrictions. This is not an absolute regulatory limit; larger aircraft may still be accommodated on a case-by-case basis when operational conditions, pavement capacity, and airport procedures allow. Although the Airport Master Plan conceptualizes a future extension to the existing length of Runway 01/19, there is no extension included as part of this project at this time. However, the proposed improvements are being designed so that a future runway 1 7 extension could be considered without jeopardizing the improvements included in this project. The future runway profile would continue from the elevations established at the south end of the current reconstruction limits. GRANT APPLICATION AND CONSTRUCTION TIMING: The FAA has indicated that construction funding is anticipated to be awarded through two separate grants over two federal fiscal years. Staff intends to bring preliminary plans and specifications to the City Council for consideration to solicit bids at the June 9, 2026 meeting, with bid results and contract award anticipated for consideration at the July 14, 2026 meeting. Following bid receipt and a conditional award which will be contingent upon FAA grant approval, Staff expects to apply for the first FAA construction grant, with the first grant offer award anticipated in August or September 2026 . The second FAA construction grant application is anticipated after October 1, 2026, with the second grant offer award anticipated in Spring 2027, likely around May 2027. The project is being designed with separate Notices to Proceed (NTP) tied to the applicable FAA grant awards . NTP #1 would authorize preparatory work, drainage, and some runway paving following the first grant offer award in 2026. NTP #2 would authorize the remaining major 2027 construction phases after the second grant authorization is in place. This structure is intended to limit the City’s financial exposure while ensuring that each authorized portion of work results in a usable unit of work and does not leave the runway in an unusable condition. If the second FAA grant offer award is delayed, NTP #2 could also be delayed. This could compress the 2027 construction window, extending runway closure periods later into the 2027 construction season, or require additional work to carry over into 2028. Preparatory work and drainage improvements are anticipated in late 2026 without runway closures. Major runway paving and runway closure activities are planned for calendar year 2027, with Runway 01/19 closed from April through October 2027 and Runway 13/31 closed from July through September 2027. Remaining Phase 3 work, restoration, punch list items, and project closeout activities are anticipated to extend into 2028, including a temporary Runway 13/31 closure in March and April 2028. PROJECT SCHEDULE AND PHASING: The schedule below summarizes the anticipated grant sequence, Notices to Proceed, construction phases, and runway closures. The overall schedule remains dependent on FAA grant timing, annual federal funding availability, issuance of Notices to Proceed, and final approval of the Construction Safety and Phasing Plan. 2 8 Activity Jun 2026 Jul 2026 Aug 2026 Sep 2026 Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Apr 2028 May 2028 Bid Opening Grant Application #1 Grant Offer #1 Award NTP #1 Grant Application #2 (earliest submittal) Grant Offer #2 Award NTP #2 Phase 1 Preparatory Work Phase 1 Major Construction Phase 2 Intersection Work Phase 3 Work Punch List / Final Restoration Runway 01/19 Availability Runway 13/31 Availability Legend: Bid / Grant Application / Grant Offer Notice to Proceed (NTP) Potential Grant Offer Window Construction Activity Runway Open Runway Closed Phase Description Phase 1 Preparatory Work Limited preparatory work in late 2026, including select storm sewer, grading west of Taxiway A, and northeast access improvements. This work is anticipated to occur without runway closures. Phase 1 Major Construction Major Runway 01/19 reconstruction work excluding the Runway 13/31 intersection area. Runway 01/19 would be closed during this phase while Runway 13/31 remains open. Phase 2 Runway 01/19 and Runway 13/31 intersection reconstruction. This phase requires closure of both runways and represents the most critical operational closure period. Phase 3 Remaining work outside the Runway 01/19 Runway Object Free Zone, including Runway 13/31, taxiway, lighting, signage, pavement marking, shoulder, and tie-in improvements. Runway 01/19 is anticipated to be open, with Runway 13/31 temporarily closed again in March and April 2028. Punch List / Final Restoration Final punch list, restoration, and project closeout activities anticipated in 2028, with only single-runway closures expected as needed. STAFF COMMENTS: No action is being requested of the City Council with this report. This update is intended to provide notice that construction funding is anticipated to be awarded through two separate FAA grants and that the construction plans and specifications are being prepared with phased Notices to Proceed to address FAA grant timing. Staff continues to coordinate with Bolton & Menk and regional FAA staff regarding final design, construction phasing, operational impacts, and funding strategy. The current schedule reflects 3 9 anticipated FAA grant sequencing and available federal funding levels while attempting to minimize impacts to airport users, tenants, and Fixed Base Operator (FBO) operations. Runway 01/19 is anticipated to be closed from April through October 2027. Runway 13/31 is anticipated to be closed from July through September 2027, including the runway intersection work. During the runway-runway intersection work, both runways will be closed, resulting in a full closure of Airport flight operations. Outside of that full- closure period, the phasing is intended to maintain limited Airport operations where feasible, although operations will be constrained by runway, taxiway, and construction area closures. Runway 13/31 is also anticipated to be temporarily closed in March and April 2028 for remaining Phase 3 work. The construction contract is anticipated to use multiple Notices to Proceed tied to FAA grant authorizations. Staff intends to maximize eligible work included in the first grant offer to the extent feasible, while maintaining the phased NTP structure to preserve operational flexibility, minimize financial exposure to the City, and keep the Airport functional as work progresses. FAA staff has informed City staff that the current intent is to award a second construction grant for the remaining eligible runway project costs. While City staff believes the risk is low, the second grant could be delayed or not awarded as anticipated. The plans and specifications are being prepared so each authorized portion of work results in a usable unit of work and the Airport can be left in a functional condition if grant timing changes. A delay in the second grant could compress the 2027 construction window, extend runway closure periods later into the season, or require additional work to carry over into 2028. This strategy is intended to allow authorized work to proceed while limiting the City’s financial exposure if the second grant is delayed or not awarded as anticipated. The City Council will have additional opportunities to consider project approvals, award actions, grant agreements, and any necessary project adjustments at future meetings. Staff will continue coordination with airport tenants, FAA representatives, emergency service providers, and other stakeholders as the project advances toward bidding and construction. Additional updates will be provided as project milestones are reached, FAA funding commitments are finalized, and construction phasing details continue to develop. No action is being requested from the City Council at this time. However, because of the unusual nature of a two part grant process, staff wants the City Council to be aware of the planned approach prior to being asked to take action on the first grant submittal. ATTACHMENT(S): Project Overview Map 4 10 > > > > POTENTIAL BATCH PLANT/ STAGING AREA DETENTION POND DETENTION POND WETLAND AREA RO F Z ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ RO F Z ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZRS A RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RS A RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RO F A RO F A ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA RO F A RO F A RO F A ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF A ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z ROF Z RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA LO C C R LOC CR LOC CR LOC CR LOC CR LOC CR LOC CR LOC CR LO C C R LOC CR LOC CR LOC CR LOC CR LOC CR LOC CR PO F Z PO F Z PO F Z POFZ PO F Z PO F Z PO F Z IAOFZ IAOFZ IAOFZ IAOFZ IAOFZ IAOFZ IAOFZ IAOFZ IA O F Z IAOFZ IAOFZ IAOFZ IAOFZ IAOFZ IAOFZ IAOFZ IAOFZ IA O F Z GS CR GS CR GS CR GS CR GS CR GS CR GS CR GS CR GS CR GS CR GS C R TW A 1 TW A 2 TW A 4 TW B RUN W A Y 1 3 / 3 1 RUNWA Y 1 / 1 9 TW B 3 TW A TW A TW A TW B TW B TW B 2 TW B 1 WEST A P R O N SO U T H AP R O N TAXIL A N E C TW A 3 S RIVERSIDE DRIVE TW A XXXXX X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXX X X X X XXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX X X XXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X PR O P PROPPROP PR O P PR O P PR O P PROP PRO P PR O P PR O P PR O P PR O P PROPPROPPROPPROP PR O P PR O P PR O P PR O P PR O P PR O P PR O P PROP PROP PROP PROP PROP PR O P PROP PR O P PROP PR O P PR O P PROP PROP PROP PROP PROP PROP PROP PROP PR O P PR O P PROP PROP PR O P PROPPROPPROP PR O P PROPPROPPROPPROP PROPPROPPROP PR O P X X X X X X XXX X X X X X X X X X X EXISTING DRAINAGE SWALE SHOWN FOR REFERENCE TEMPORARY CULVERT LIKELY NEEDED FOR ACCESS ROUTE ACROSS FEILD. AI R P O R T R O A D EXTRA STAGING/STORAGE AREA SHEET B o l t o n & M e n k , I n c . 20 2 6 , A l l R i g h t s R e s e r v e d c H: \ A M E S \ 2 4 X 1 3 6 1 2 1 0 0 0 \ C A D \ C 3 D \ 1 3 6 1 2 1 J 0 1 . d w g 6/ 4 / 2 0 2 6 1 1 : 3 3 : 4 9 A M DESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO.AMES MUNICIPAL AIRPORT RECONSTRUCT RUNWAY 1/19 0T5.136121 1519 BALTIMORE DRIVE AMES, IA 50010 Phone: (515) 233-6100 Email: Ames@bolton-menk.com www.bolton-menk.comR CDW CDW JPR KEY MAP J.00 CONSTRUCTION SAFETY & PHASING PLAN - BOTH DIVISIONSFEETSCALE 0 300 600 HORZ. OVERALL PHASING PLAN - BOTH DIVISIONS R WIDEN EXISTING FIELD ACCESS TO 50' OR WHAT EVER IS NEEDED FOR CONSTRUCTION REMOVE AND REPLACE FENCE AS NEEDED. NO CULVERT NEEDED. LOCATION OF EXISTING CONCRETE FIELD ACCESS. DO NOT DISTURB. 12" WATER MAIN AND FIRE HYDRANT AVAILABLE CONTRACTOR SHALL COORDINATE WITH UTILITY AND IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE CONNECTION, METERING AND USE OF ANY WATER APPROXIMATE LOCATION OF POWER POLE SINGLE-PHASE OR THREE-PHASE POWER IS AVAILABLE CONTRACTOR SHALL COORDINATE WITH UTILITY AND IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE CONNECTION, METERING AND ELECTRICITY USED FOR UTILITY ACCOMMODATIONS AND COORDINATION CONTACT MARK IMHOFF (CITY OF AMES ELECTRIC) AT 515-239-5175 WATER CONTRACTOR: AMES UTILITY SERVICES AT 515-239-5120 OR PUBLIC WORKS 515-239-5160  LEGEND AIRPORT PROPERTY LINE AIRPORT PERIMETER FENCE CONTRACTORS ACCESS ROUTE - CURRENT PHASE CONSTRUCTION STAGING/STORAGE/STOCKPILE LOCATION RUNWAY CLOSURE MARKER TAXIWAY CLOSURE MARKER LOW-PROFILE BARRICADES PHASE 1 PREPARATION WORK - OCCURRING IN 2026 PHASE 1 WORK AREA PHASE 2 WORK AREA PHASE 3 WORK AREA PROP PROP PROP PROP PROP XXXXXXXXXXXX X INSTALL 18" MIN CULVERT AND PROVIDE A NEW CONSTRUCTION ACCESS FIELD ENTRANCE. REMOVE AND REPLACE FIELD FENCE AS NEEDED. NOTE: CONTRACTOR MAY USE MILLINGS FOR ACCESS OR HAUL ROUTES BUT MUST REMOVE AND DISPOSE OF ON DEDICATED WASTE AREAS. 40' ACCESS GATE 40' ACCESS GATE ACCESS IMPROVEMENTS TO AIRPORT ROAD/FIELD ENTRANCE 11