HomeMy WebLinkAbout~Master - Resolution approving Change Order No. 9 with Woodruff Construction for Water Pollution Control Facility Nutrient Reduction Modifications Phase 1ProjectRESOLUTION NO. 26-371
RESOLUTION APPROVING CHANGE ORDER NO. 9
ON CONTRACT WITH WOODRUFF CONSTRUCTION, OF AMES, IA
FOR WATER POLLUTION CONTROL FACILITY NUTRIENT REDUCTION
MODIFICATIONS PHASE 1 PROJECT
FOR THE CITY OF AMES, IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper
on the above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames,
Iowa, that Change Order No. 9 in the amount of $81,379.80 on contract with Woodruff
Construction, of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction
Modifications Phase 1 Project be approved and adopted as attached hereto and made a
part hereof by this reference.
ADOPTED THIS 9th day of June, 2026.
_______________________________ _________________________________
Renee Hall, City Clerk John A. Haila, Mayor
Introduced by: Corrieri
Seconded by: Junck
Voting aye: Beatty-Hansen, Betcher, Corrieri, Junck, Gartin, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 9th day of June, 2026.