Loading...
HomeMy WebLinkAbout~Master - Resolution approving Change Order No. 9 with Woodruff Construction for Water Pollution Control Facility Nutrient Reduction Modifications Phase 1ProjectRESOLUTION NO. 26-371 RESOLUTION APPROVING CHANGE ORDER NO. 9 ON CONTRACT WITH WOODRUFF CONSTRUCTION, OF AMES, IA FOR WATER POLLUTION CONTROL FACILITY NUTRIENT REDUCTION MODIFICATIONS PHASE 1 PROJECT FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 9 in the amount of $81,379.80 on contract with Woodruff Construction, of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 9th day of June, 2026. _______________________________ _________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Corrieri Seconded by: Junck Voting aye: Beatty-Hansen, Betcher, Corrieri, Junck, Gartin, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 9th day of June, 2026.