MEMO
To: Mayor and City Council
From: Renee Hall, City Clerk
Date: April 24, 2026
Subject: Packet of Communications to Council
Listed below are the communications to the City Council known to staff as of April 24,
2026:
1. Claire E. Hosch, Ames Resident – April 12, 2026
RE: Gray Ave & Sunset Drive Intersection
2. Jacquie Frick, Ames Resident – April 13, 2026
RE: Food Pantry Options in Ames
3. Damion Pregitzer, P.E., PTOE Traffic Engineer – April 24, 2026
RE: Pedestrian Crossing Evaluation – Lincoln Way @ South Russell Ave
4. Rhonda Frerichs – Ames Resident – April 18, 2026
RE: Ontario Scholl Rd Workforce Housing Proposed Development
5. Paul and Cindy Larson – Ames Resident – April 23, 2026
RE: Iron Way Annexation
6. Kelly Diekmann – Director of Planning & Housing – April 24, 2026
RE: 608 Burnett – Jensen Request
7. Kelly Diekmann – Director of Planning & Housing – April 24, 2026
RE: Response to Ames Silversmithing Request for Site Plan changes
1
Hall, Renee
From:Betcher, Gloria
Sent:Sunday, April 12, 2026 1:41 PM
To:Claire E Hosch
Cc:City Council and Mayor; Hall, Renee; Schainker, Steve; Phillips, Brian; Goldbeck, Pa
Subject:Re: Support for a 4-way Stop at the Intersection Sunset Drive and Gray Ave
Attachments:Screenshot 2026-04-09 at 1.25.06 PM.png; Gray Ave and Sunset Drive Intersection Survey Results.pdf
Dear Claire,
Thank you for your message about this complex intersection. Obviously, the position of the intersection
near the Greek houses means it’s in a well-traveled pedestrian area, and the safety of walkers should be
a concern for Council.
Your effort to poll others to determine a need for this improvement is commendable, and it certainly
helps us to understand the scope of concern. I’m forwarding this email to the other City Council
members, as well as the City Clerk and Manager’s Office, so that it can get into our Communications to
Council packet for future discussion. If Council believes this issue deserves further study, we will send it
on to staff for a memo on the situation.
Your concern is noted and most appreciated,
Gloria
Gloria J Betcher
Ward 3 Representative
Ames City Council
531 Hayward Avenue
Ames, IA 50014
(515) 292-5177
On Apr 9, 2026, at 1:48 PM, Hosch, Claire E <claireeh@iastate.edu> wrote:
[External Email]
Good afternoon, Councilwoman Betcher.
My name is Claire Hosch, I am an Iowa State University student living in your district. I live
in the Kappa Delta Sorority house, which is located right next to the intersection of Gray
Avenue and Sunset Drive. I have lived here for the last two years, and I have come to
recognize this intersection creates a bit of a safety issue for both pedestrians and drivers.
I've attached an image of the intersection, and I circled the current stop signs in red.
2
There are stop signs on both sides of Gray Avenue, but none on Sunset Drive. I have
observed that vehicles traveling on Sunset Drive, whether continuing straight or turning
right onto Gray Avenue, are often driving too fast. On the south side of the intersection, this
creates an issue for pedestrians crossing the road, especially when there are cars parked
along Sunset Drive. It's difficult to see around the parked cars until you're in the middle of
the road, but the speed at which the cars come through (and the fact that they don't have
to stop) makes it dangerous to walk into the road to peer around the parked cars to see if
the road is clear.
Because both Gray Ave and Sunset Drive curve and because cars park along the road, as a
driver stopped at the stop sign on the east side of Gray, it is difficult to see if there are cars
coming on Sunset. Again, the speed at which these cars come through creates an issue.
For example, I often check my shoulder to see if cars are coming, and Sunset is clear, but
by the time I begin to accelerate, a car comes speeding through Sunset that has the right of
way because Gray has a stop sign, but Sunset does not.
A similar problem arises when Gray and Gable meet on the left side of Sigma Chi
Fraternity. When stopped at the stop sign, it is nearly impossible to see cars coming from
Sunset because Gray curves around the Fraternity house. When the cars coming from
Sunset are driving the speed limit, this isn't a big deal because they come by slowly.
However, so many of these car's speed by because they aren't required to stop. These are
just a few of the problems I have observed while living next to, crossing, and driving through
this intersection for the last two years.
The cars coming from Gray Avenue, regardless of whether they are coming from the East or
the West, never seem to be speeding, which is presumably because the stop signs prevent
them from doing so. If this intersection weren't curved and didn't have so many cars parked
along the road, the current one-way stop probably wouldn't be an issue. I was worried I
was the only one who felt this way, and so I created a google form and sent it to some of
the neighboring Sorority and Fraternity houses. I had 74 survey responses, and the results
surprised me. I have attached a PDF Slideshow with the survey responses, which supports
my conclusion, in case you would like to check it out.
As you can see, I am very passionate about this issue. I am a friend of Emily Boland, so I
know that the City Council gets many frivolous complaints and I wanted to be sure I
provided evidence that this was an issue that affected many people, not just myself. I
would love to hear back if you get the chance.
Thank you,
Claire Hosch
Iowa State University | Political Science | Ethics
P.L.E.A. Lab | Research Assistant
(515) 480-6646
Gray Ave and Sunset Drive
Intersection Survey Results
1
Hall, Renee
From:Jacquie FRICK <frickdbq@msn.com>
Sent:Monday, April 13, 2026 1:41 PM
To:Hall, Renee
Cc:City Council and Mayor
Subject:Hello Mayor John and City council. I’m Jacquie from Feeding The 5,000…
[External Email]
Hello Mayor John and City council. I’m Jacquie from Feeding The 5,000 helping to fight hunger and
support the poor, oppressed and vulnerable in Story and Boone Counties. I am so blessed to be able to
have the opportunity to present to you God‘s Food Pantry, built in September 2025 in Boone, which is
very vital to the communities. It is another source of food, essentials and hope for many. It’s a place they
can go 24/7 for items such as paper products, fresh vegetables, a can of soup, granola bars, loaf of
bread, soap, and even cold and frozen items depending on the season/temps. I have many connections
including businesses in Ames and many other resources to stock a regular basis. At times in may be bare
but God has always replenished it! In the summer farmers and neighbors drop off their garden and field
vegetables! Whether it’s 6 am or 10 o’clock at night, by foot or by bicycle, it’s a rescue in times of need. It
has proven to bring a change to Boone community where people are digging into their cupboards &
sharing with others which again increases unity in the community keeping it growing strong and thriving.
It’s a way for other businesses/gas stations to share discontinued items or shortly expired food. Although
we have several food banks in town, not one of them are open 24 hours a day where people have an
outlet for emergency situations. And we have many poor that do not take advantage of food pantries due
to pride or shame they may feel which limits their access. The pantry itself It has solar lights inside and
out, always able to be seen and it is handicap accessible making it safe for all people. Feeding the 5000
is always watching out for the safety of the people as well as their health and physical needs. I have
already received two grants to help pay for this including $500 from Walmart in Ames and $500 each
from 4 Maverick stores in town who also believe in this project and want to be a part of it! It is about 4 ft x
8 ft tall made of wood, has a roof, door, very strong sits on pillars. Elite construction of Boone designed
and built it by hand from the visions I had. I would like to propose a few spots next to Bandshell Park. We
need it clearly seen by others and easy access for donations and people visiting it with places to park.
The one in Boone currently sits on a church’s land and we built a sidewalk as you can see from the
sidewalk up to the pantry for tracking of people. My insurance was able to add First Presbyterian church
to the policy as liability free. We can add Ames City as well. I clean Gods food pantry regularly, picking up
any trash and empty cartons or boxes inside and sweeping inside keeeping it free from fire hazards. I live
in Ames and can monitor it daily if needed. The church where it sits agreed to mow/weed around it
otherwise they have no other connection with it other than providing the land. They love it there and help
stock it! In the winter I and the community keep it salted on the sidewalk going up to the door. I keep a
bucket of salt inside. It is never locked. It is open all the time. If it’s needed to be moved in the future,
then that would be something we would need to discuss. Elite Construction kindly takes care of anything
that breaks or any updates needed. Currently they are planting beautiful hydrangeas around the
perimeter. If something breaks or needs repaired they have been wonderful to fix what’s needed. Any
funds needed to pay for repairs, FEEDING THE 5,000 has been able to pay for this through fundraising
and private donations. If you prefer a construction company in Ames of your choice, we can certainly
reach out to one and I’m sure they would love to help. I can be very flexible and we can work together to
2
make this happen. The entire community of Boone has joined together to help stock it and take care of it!
I’m
certain Ames people will too once they see it and find out it’s there! The poor count on this and some go
there every day to see what’s there. I also collaborate with Food at First and many other pantries across
the county including Bethseda, Loaves and Fishes, Iowa State University family services, Salvation Army,
IMPACT and more! Also, the city of Boone shovels snow in the parking lot next to it as this is the city’s
parking lot.
I hope you see the vision in the spots that I propose across from Bandshell park. There is a perfect
parking lot with recycling bins next to it in front of an Ames City foundry I believe. It has a sidewalk
running through it, easy access for the public, very easy to be seen which also decreases vandalism and
would frankly brighten up this barren spot of land! I just knew when I saw it that this would be a perfect
place should you and your team agree!
I feel grateful to you Mayor for your time and willingness to look at this matter with me! Please see
pictures below! I can send other documents as needed such as insurance information. Greg of Elite
construction who is in charge of this project would be happy to discuss any other questions such as
about the building/design itself at (515) 298-0960 personal or (515) 230-3872 office.
Yours in Christ,
Jacquie Frick
Feeding The 5,000, Inc.
3
From:
To:
Cc:
Subject:
Sent:
Jacquie FRICK
Hall, Renee
City Council and Mayor
Feeding the 5,000 pictures/documents, proposed City land
4/13/2026 1:46:54 PM
[External Email]
Yours in Christ✝,
Jacquie Frick
Feeding The 5,000, Inc.
MEMO
To: Mayor and City Council
From: Damion Pregitzer, P.E. PTOE, Traffic Engineering Manager
Date: 4/28/2026
Subject: Pedestrian Crossing Evaluation – Lincoln Way at South Russell
Avenue
BACKGROUND:
On February 28, 2026, the City Council referred to staff a request to evaluate potential
pedestrian crossing improvements at the intersection of Lincoln Way and South Russell
Avenue following a fatal pedestrian crash that occurred on February 18, 2026. Additional
referral requests included outreach to an Iowa State student group to coordinate potential
improvements as identified by that group.
Following the Council referral, staff reached out to the identified Iowa State student group
on multiple occasions to better understand the proposal. As of the date of this memo, staff
has not received a response.
The crash occurred during evening hours (8:01 PM) under dark conditions and involved
a westbound motorcycle and a pedestrian crossing north–south across Lincoln Way at
Russell Avenue. The location is a two-way stop-controlled intersection along an arterial
street with nearby CyRide stops. The intersection is unsignalized and does not include
enhanced pedestrian crossing treatments.
Staff delayed formal evaluation until the crash details were available through the Iowa
DOT to ensure that all available information could be considered. At this time, it is the
consensus of law enforcement that the dark lighting conditions were the primary
contributing factor. Speeding and impairment do not appear to be factors in this crash.
WALK BIKE ROLL AMES PLAN CONTEXT:
Plan Priorities
The Walk Bike Roll Plan identifies Lincoln Way as part of a broader network of arterial
corridors that present high-stress pedestrian crossing conditions due to traffic volumes,
speeds, and roadway width. While this corridor is recognized as challenging for
pedestrian crossings, the Plan prioritizes improvements based on a citywide evaluation
of factors such as traffic stress, proximity to destinations, and network connectivity (see
Prioritized Crossing Projects map).
Within the segment of Lincoln Way between Grand Avenue and University Boulevard, no
pedestrian crossing improvements were identified in the High or Med-High priority tiers.
As such, this location was not included among the implementation priorities established
in the Plan. This is due, in part, to the presence of signalized intersections within this
segment, which provide controlled crossing opportunities.
The Walk Bike Roll Plan identifies 108 crossing improvement locations citywide, with an
estimated total cost of approximately $22.5 million. As part of the Plan’s completion, it
was acknowledged that available funding would only allow implementation of High priority
and a portion of Med-High priority projects over a 15- to 20-year period. It should be noted
that the $22.5 million is part of the $101.9 million in overall identified needs (see Funding
Plan). The current City policy is to average at least $1.2 million per year for non-motorized
improvements.
Enhanced pedestrian crossings along multilane arterial corridors such as Lincoln Way
represent significant infrastructure investments, often on the order of $250,000 per
location, depending on the treatment applied. Constructing enhanced crossings at every
such location may not be feasible given funding and operational constraints of the
roadway. Given these funding limitations, the Plan establishes a framework for prioritizing
improvements over time.
Citywide Systematic Transportation Approach
The Walk Bike Roll Plan is intended to guide a phased and equitable approach to
pedestrian and bicycle improvements across the community. The prioritization process
was developed using a consistent set of criteria and informed by extensive community
engagement, including public input, stakeholder outreach, and participation from a
steering committee. This process was used to identify and rank locations with the greatest
demonstrated need.
While the recent crash raises important concerns at this location, reconsideration of
priorities or treatment levels should be evaluated within the context of the broader
transportation system. Implementing isolated improvements outside of this framework
may create inconsistencies in project selection and may not reflect the priorities
established through the community-driven planning process.
The Plan is intended to be updated periodically, and future updates provide an opportunity
to incorporate new safety information, including crash trends and observed conditions,
and to reevaluate priorities through a comprehensive and consistent process.
OPTIONS FOR CONSIDERATION:
Based upon the background and prior planning efforts noted above, the City Council has
several options to consider:
Option 1 – Continue Implementation of the Walk Bike Roll Plan
Under this option, the City would continue to implement pedestrian crossing
improvements based on the existing prioritization framework established in the Walk Bike
Roll Plan. This includes advancing projects identified in the High and Med-High priority
tiers as funding allows, while addressing other locations through the Plan’s established
phasing approach.
The Plan also contemplates periodic updates, which provide an opportunity to incorporate
new information, including changes in traffic conditions, pedestrian activity, and safety
data, and to adjust priorities through a comprehensive and consistent process.
This approach maintains consistency with the City’s adopted policy framework and
supports the equitable allocation of limited resources across the community by focusing
investment on locations identified as the highest priority through the planning process.
However, this approach would not result in near-term changes at this specific location.
Option 2 – Evaluate Increased Lighting Standards
Under this option, the City would evaluate whether enhanced roadway lighting or
pedestrian-scale lighting standards should be developed for arterial street crossings. This
would include defining what an enhanced lighting treatment would consist of, evaluating
associated costs, and identifying how such a standard could be applied across similar
crossing locations citywide.
This approach could improve visibility for both drivers and pedestrians, particularly during
nighttime conditions like those present at the time of the accident. Compared to more
substantial crossing improvements, lighting enhancements may represent a lower-cost,
faster implementation strategy and could be repeated more broadly across corridors with
similar characteristics. The estimated cost per location is in the magnitude of $10,000 -
$20,000.
Establishing and applying enhanced lighting standards would require additional analysis
and funding to implement the necessary improvements. While improved lighting may
increase visibility, it may not fully address other factors influencing pedestrian safety at
arterial crossings, such as driver yielding behavior, traffic speeds, or the availability of
controlled crossing opportunities.
In addition, significantly increasing lighting levels at select crossings may create conflicts
with the City’s dark sky ordinance and could result in concerns from adjacent residential
properties where such treatments are implemented.
Option 3 – Evaluate Increased Crossing Treatment Standards
Under this option, the City would evaluate whether pedestrian crossing treatments along
arterial corridors such as Lincoln Way should be enhanced beyond what is currently
assumed in the Walk Bike Roll Plan. This could include consideration of treatments such
as pedestrian hybrid beacons (PHBs), signals, or other measures at locations that may
not have been previously identified for higher-level improvements. Estimated costs for
PHB’s are in the $250,000 - $300,000 magnitude.
This approach could provide more direct safety benefits at specific crossing locations by
increasing driver awareness and improving opportunities for pedestrians to cross higher-
volume roadways. It is also generally consistent with the range of treatment options
identified in the Plan, though it may involve applying those treatments more broadly or at
lower thresholds than originally contemplated in the Walk Bike Roll plan.
Enhanced crossing treatments at arterial locations represent a significant investment and
may require reevaluation of priorities across multiple locations to maintain consistency
with available funding. In addition, certain treatments, particularly signalized or beacon-
controlled crossings, may have impacts on traffic operations and the environment, and
would require further analysis to determine appropriateness at specific locations.
It should be noted that enhanced crossing treatments would not include the use of
Rapid Rectangular Flashing Beacons (RRFBs). The use of these treatments has
been suggested in several communications regarding this accident. Current
guidance would not recommend their use on a multi-lane arterial street without
additional considerations for pedestrian refuge.
STAFF COMMENTS:
This accident at Lincoln Way and South Russell Avenue highlights the challenges
associated with pedestrian crossings along high-volume arterial corridors, particularly in
locations where crossing demand exists, and enhanced crossing infrastructure may not
be readily available at every intersection.
The Walk Bike Roll Plan identifies these conditions at a citywide transportation system
level and establishes a prioritized, phased approach to addressing them within available
funding constraints. The Lincoln Way and Russell intersection was not identified as a
priority location under the Plan’s current framework.
If the City Council choses to continue implementation of the existing Plan, staff would
proceed with advancing identified priority projects as funding allows through the City’s
annual Capital Improvement Plan process. The Plan reflects prior safety and operational
analysis, as well as extensive public input, and is intended to guide investment decisions
across the transportation system. Under this approach, no additional action specific to
this location would be taken at this time.
Staff recommends that any changes to crossing treatment levels or project prioritization
be considered systematically to maintain consistency across the City with the adopted
Plan and ensure a balanced allocation of resources. Options 2 and 3 would represent
potential changes to the assumptions, priorities, or implementation approach established
in the Plan. Should the City Council wish to pursue any of these options, placing this item
on a future agenda would allow staff to return with a staff report and facilitate additional
discussion with Council to define the scope of work necessary to evaluate the impacts of
those potential changes.
Future updates to the Walk Bike Roll Plan provide an opportunity to incorporate new
safety information and reevaluate priorities. As part of that process, additional emphasis
could be placed on pedestrian crossings along arterial corridors.
1
Hall, Renee
From:Rhonda Frerichs <randrfrerichs@gmail.com>
Sent:Saturday, April 18, 2026 10:08 AM
To:City Council and Mayor
Subject:Ontario Scholl Rd Workforce Housing Proposed Development
[External Email]
Hello,
Per your request from the council meeting April 14, 2026, I am sending you my questions and concerns.
1. Where does this development fit into the CDBG (Community Development Block Grant) and the
HOME program?
2. Are any of the funds from the above programs going toward this development?
3. Provide details on the Development Incentive Agreements and URAs.
4. I'm challenging the market-rate for this development - $350K - $450K townhouses/duplexes do
not appear to be moderate-income homeowners.
5. Provide details on NRSA (Neighborhood Revitalization Strategy Area), does this neighborhood fall
into this category?
Thank you for your attention to my questions and concerns. Please provide contacts or directly provide
the answers to my questions.
Rhonda Frerichs
3309 Kingman Rd, Ames, IA 50014
Department of Planning & Housing
Memo
TO: Mayor and City Council
FROM: Kelly Diekmann, Planning & Housing Director
DATE: April 24, 2026
SUBJECT: Request to Initiate Zoning Ordinance Changes and Incentives for Apartment
Development at 608 Burnett
On April 12th, City Council identified consideration of the request from Luke Jensen for changes
to development standards and for incentives regarding a project at 608 Burnett as a priority for
the Planning Division. The developer seeks a number of related changes to facilitate
redevelopment of a parking lot into a 4-story 38-unit +/- apartment building.
608 Burnett is a Neighborhood Commercial (NC) zoned property located midblock between 6 th
and 7th Street. All of the blocks between 6th and 7th Street from Clark to Duff are also zoned
Neighborhood Commercial. See map below. The developer notes the site was identified as a
potential housing location wihtin the Ames Main Street Downtown Guiding Vision.
This area has the highest concentration of NC zoning in the City and is a hybrid transitional
zoning district for commercial and residential uses. The NC contrasts greatly in its mix of uses
and design requirements compared to the Downtown Service Center (DSC) that applies to the
traditional Downtown Area south of 6th Street. Both areas have a “Core” land use designation
within Ames Plan 2040 (see page 62) reflecting the existing Downtown and commercial types of
land uses as wells as the general planning for intensification of commercial mixed use in this
area.
Zoning Changes
In order to construct the apartment building as envisioned, the developer requests that the
Council initiate changes related to zoning and to property tax abatement incentives. Although
NC zoning allows for apartments, several standards differ from the concept of the developer.
Staff believes the issues would include building height, roof type, floor area ratio, setbacks,
certain design guidelines, and the parking rate. The developers sees the project as
“Downtown Housing” and desires standards more akin to DSC zoning for parking and
setbacks, but without other requirements for mixed use.
The priority policy issues for zoning changes are likely the requested parking reductions, along
with building height and design requirements. The developer seeks approval of a parking rate
of approximately 1 space per unit, for up to 2-bedroom units. If this were to be the standard,
parking would be 38 spaces where otherwise 60 spaces would be required based upon the
conceptual mix of units as described to staff.
The height and design issues are a question of intent for the area as a transition from
traditional Downtown to Old Town to the north and what a compatible type of structure would
be, if it did not meet the current requirements. There are examples of other taller buildings in
this area and based upon final design elements the idea of a 4-story structure could be found
to meet the goals of the City for this area. A project of this size in NC would require a public
hearing and approval of Special Use Perm it by the Zoning Board of Adjustment, which
addresses overall building size and design compatibility along with function of a site.
Incentives
Staff has not reviewed any specific developer justification or pro forma for the project. This
issue of incentives with a proposed 10-year 75% tax abatement must be explored in greater
detail for its ramifications to all of Downtown and other URAs based upon current law.
The request states city requirements have additional costs and incentives are needed At this
point staff does not know what these costs are that are different compared to anywhere else in
the community.
If City Council were to extend the Downtown URA boundary to include this site, it has options
for a 3-year 100% tax abatement or a maximum 10 year partial sliding scale tax abatement,
which is consistent with other URAs in the City. Additionally, the qualifying criteria assume a
mixed-use building and conformance to Downtown Design Guidelines that may or may not fit
the project as proposed. Creating a new URA would require at least two properties to be
included in accordance with state law, the 608 Burnett site may meet this prerequisite as the
site appears to be two lots, but shown as one property.
The level of requested abatement exceeds any other incentive option that exists in the DSC or
CSC zoning districts, which are similar in allowing for larger redevelopment projects. While the
requested incentive is approvable, it may impact incentives for other URAs based upon
language in state law about custom tax abatement schedules.
The developer also plans to seek Workforce Housing Tax Credits (WHTC). Note that per the
state WHTC program requirements, some form of local match per unit is required to support
the application. For a 38 unit project, a value of at least $38,000 is needed. It would appear
one year of tax abatement would be worth at least $38,000 under current state taxation and
abatement policies for a project that exceeds a value of $5 million.
Options
Option 1-Explore changes to zoning standards for all NC properties between 6th and 7th
The site is one of many similarly situated NC zoned properties between Duff and Clark. If City
Council does not believe the current NC zoning is adequate to address current uses ,
transitions, and planned limited levels of redevelopment, changes as requested by the
developer would be appropriate. This option would explore potential changes on a district
basis and may result in a wholly new special purpose zoning district to an updated concept of
Downtown transition.
This option would need outreach and consultation with owners in the area and the Old Town
neighborhood to the north. Prioritization in the work plan would be required.
Option 2- Explore changes to zoning standards intended to address the Burnett site
only at this time
The same types of issues would be considered, but the result would likely be more generic in
its applicability to NC zoned properties and rely upon the current Special Use Permit process
to assess future projects. This process likely includes less consultation because of the
assumption of the Special Use Permit process allowing for public comment at a public hearing
for the specific type of project.
This option likely takes less time than Option 1 because it is focused on this particular request
and not other potential interests for this area, but is still needing to be prioritized with the work
plan.
Option 3- Financial Incentives
Separate from zoning issues, is the question of financial incentive amount, type, and qualifying
standards. As mentioned above, the rationale and process that would best fit the project is not
fully fleshed out at this time. If tax abatement is offered, a site specific URA that conforms to
standard abatement schedules would be consistent with other projects and the least likely to
have ramifications to other URAs. Staff also has some concerns that pending legislation could
also impact staff’s final recommendations on this issue.
Option 4-Current Zoning No Changes
The Developer could construct an apartment building within the standards of the current
zoning of NC with no changes by City Council. The overall building size would be smaller
primarily due to limitations related to height and accommodation of parking on site to serve the
use. Current design standards would apply, and the project would require ZBA approval as a
Special Use Permit.
Staff Comments
Although the request is intended facilitate this project, staff believes the questions brough up by
the developer have a broader application for discussion for all of the area adjacent to Downtown.
The requested changes do not currently fit well within any specific type of zoning that already
exists. Staff has not presented a specific approach on what to do at this point and would await
City Council’s direction on scope to define exactly what type of zoning amendment would be
best. With any option, work plan prioritization is needed, for which the developer is requesting
to be an immediate priority.
Staff does believe that the issue(s) should be put on the May 12th agenda for discussion because
it does relate to interests expressed in Ames Plan 2040 for the Core designation and in general
support of context sensitive infill. The May 12 th timeframe also meets the developers interest
of looking for direction on the request prior to June. If Council has no interest in the requests,
then no further action is needed.
Regardless of the selected option(s), final approval of zoning changes and a project are
unlikely to occur in the next 60 days.
Zoning Map Excerpt
608
Burnett
Caring People Quality Programs Exceptional Service
515 Clark Ave.
MEMO
main
To: Mayor and City Council
From: Kelly Diekmann, Planning & Housing Director
Date: April 24, 2026
Subject: Ames Silversmithing Request for Site Plan Changes for Parking to Rear of
the Building
Background:
On April 14, 2026, the Council referred to staff a request from Kirk Youngberg of
Ames Silversmithing regarding parking behind a new addition. The letter describes the
conditions of their planned expansion and permitting process. He requests Council
involvement in the process of allowing parking.
The proposed parking at question is to the rear of their planned expansion to the east.
As is the case with many buildings along Main Street, property owners park behind
their buildings even though the informal access is not from an alley, but from the City-
owned parking lot.
Staff has been in discussion with the applicant about their interest in parking and the
site plan conditions. The referral from Council requires consultation by Planning with
the City Attorney’s Office to coordinate responses. Planning staff will work with the
Legal Department to better understand Mr. Youngberg’s request and to understand
where and how Council may act. The requested relief, as stated in the letter, may or
may not be allowable or even require City Council consideration.
At this time, the City Council could either 1) direct staff to put the request on the May
12th Agenda to review staff’s findings and provide direction, or 2) City Council can
direct staff to provide an updated non-agenda memo before the May 12th meeting and
then decide how to proceed.