BACKGROUND:
This is the annual program for rehabilitation/reconstruction of deficient sanitary sewers and
deteriorated manholes at various locations throughout the city. The goal of this program is to
identify and remove major sources of inflow/infiltration (I/I) as a means of lowering the peak
wet weather flow at the treatment plant. By eliminating I/I in these sewer mains, the sanitary
sewer system will also regain needed capacity. This project includes the rehabilitation of
sanitary sewer segments and manholes within Basin 11, which is located on the east
side of Ames.
On February 18, 2026, bids for the project were accepted by City Council. However, the
award of the project was delayed to comply with the requirements of the State Revolving Fund
(SRF) Clean Water Loan process. Bids were accepted as shown below:
Bidder Bid Amount
Engineer's Estimate $2,100,000.00
Municipal Pipe Tool Co.$1,616,102.90
Visu-Sewer $2,560,299.25
A State Revolving Fund (SRF) Clean Water Loan in the amount of $2,100,000 has been
secured as the funding source for this project. Repayment of the loan will be from the Sanitary
Sewer Fund. The not-to-exceed amount for the public hearing has been established at
an amount to cover possible cost increase; however, the City will only borrow the
amount needed to fund the project. A Public Hearing is required to enter into the Sewer
Revenue Loan and Disbursement Agreement to borrow the funds in a principal amount
not to exceed $2,100,000.
The revenues and expenses associated with this program are estimated as follows:
Description Available Revenue Estimated Expenses
State Revolving Fund (SRF)$2,100,000
Construction (est.) $1,616,102.90
Engineering/Administration (est.) 250,000.00
TOTAL $2,100,000 $1,866,102.90
1
The Sanitary Sewer System Improvements Program (Basin 11) are shown in the Capital
Improvement Plan with $2,500,000 in State Revolving Fund (SRF) proceeds.
ALTERNATIVES:
1. Approve the following for the Sanitary Sewer and Manhole Rehabilitation (Basin 11)
Project:
a. Resolution proceeding to take additional action for the authorization of a Loan and
Disbursement Agreement and this issuance of Sewer Revenue Bonds (SRF Loan)
not-to-exceed $2,100,000.
b. Resolution approving final plans and specifications and awarding contract to
Municipal Pipe Tool Co. LLC of Hudson, Iowa, in the amount of $1,616,102.90.
2. Do not proceed with this project at this time.
CITY MANAGER'S RECOMMENDED ACTION:
This project will improve the sanitary sewer system by restoring structural integrity of
deteriorating sewer segments and by removing inflow and infiltration to regain valuable
capacity within the system. Therefore, it is the recommendation of the City Manager that the
City Council adopt Alternative No. 1, as described above.
ATTACHMENT(S):
Basin 11.pdf
2
US Highway 30
N 500TH AVE
SAND HILL TRL
S 500TH AVE
NORTH DAKOTA AVE
240TH ST
270TH ST
13TH ST
215TH ST
200TH ST
265TH ST
24TH ST
S 530TH AVE
ZUMWALT STATION RD
C
I-35 HWY
LINCOLN WAY
TIMB RD
SE 16TH ST
STAGECOACH RD
S US HIGHWAY 69
KEN MARIL RD
DAYTON AVE
STATE AVE
E 13TH ST
GEORGE W CA
RV
ER AVE
BE
A
C
H
A
V
E
245TH ST
ONTARIO ST
276TH ST
E RIVERSIDE RD
S RIVEDR
PULLMAN ST
ONION CREEK LN
Access to city wells
OLD BLOOMINGTON RD
ADAMS ST
AIRPORT RD
560TH AVE
250TH ST
AVE
260TH ST
600TH A
VE
11
6
2
1
5
13
8
7
9
12
4
3
10
15
14
µ
0 4,200 8,4002,100
Feet
City Limits
Roads
Sanitary Study Basins
City of Ames
Sanitary System Evaluation Study
1 inch = 4,200 feet Project Locations: Basin 11
3