HomeMy WebLinkAboutA046 - Hearing on Sanitary Sewer and Manhole Rehabilitation (Basin 11) ProjectITEM #:49 DATE:03-24-26 DEPT:PW SUBJECT:SANITARY SEWER SYSTEM IMPROVEMENTS PROGRAM (BASIN 11) COUNCIL ACTION FORM BACKGROUND: This is the annual program for rehabilitation/reconstruction of deficient sanitary sewers and deteriorated manholes at various locations throughout the city. The goal of this program is to identify and remove major sources of inflow/infiltration (I/I) as a means of lowering the peak wet weather flow at the treatment plant. By eliminating I/I in these sewer mains, the sanitary sewer system will also regain needed capacity. This project includes the rehabilitation of sanitary sewer segments and manholes within Basin 11, which is located on the east side of Ames. On February 18, 2026, bids for the project were accepted by City Council. However, the award of the project was delayed to comply with the requirements of the State Revolving Fund (SRF) Clean Water Loan process. Bids were accepted as shown below: Bidder Bid Amount Engineer's Estimate $2,100,000.00 Municipal Pipe Tool Co.$1,616,102.90 Visu-Sewer $2,560,299.25 A State Revolving Fund (SRF) Clean Water Loan in the amount of $2,100,000 has been secured as the funding source for this project. Repayment of the loan will be from the Sanitary Sewer Fund. The not-to-exceed amount for the public hearing has been established at an amount to cover possible cost increase; however, the City will only borrow the amount needed to fund the project. A Public Hearing is required to enter into the Sewer Revenue Loan and Disbursement Agreement to borrow the funds in a principal amount not to exceed $2,100,000. The revenues and expenses associated with this program are estimated as follows: Description Available Revenue Estimated Expenses State Revolving Fund (SRF)$2,100,000 Construction (est.) $1,616,102.90 Engineering/Administration (est.) 250,000.00 TOTAL $2,100,000 $1,866,102.90 1 The Sanitary Sewer System Improvements Program (Basin 11) are shown in the Capital Improvement Plan with $2,500,000 in State Revolving Fund (SRF) proceeds. ALTERNATIVES: 1. Approve the following for the Sanitary Sewer and Manhole Rehabilitation (Basin 11) Project: a. Resolution proceeding to take additional action for the authorization of a Loan and Disbursement Agreement and this issuance of Sewer Revenue Bonds (SRF Loan) not-to-exceed $2,100,000. b. Resolution approving final plans and specifications and awarding contract to Municipal Pipe Tool Co. LLC of Hudson, Iowa, in the amount of $1,616,102.90. 2. Do not proceed with this project at this time. CITY MANAGER'S RECOMMENDED ACTION: This project will improve the sanitary sewer system by restoring structural integrity of deteriorating sewer segments and by removing inflow and infiltration to regain valuable capacity within the system. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as described above. ATTACHMENT(S): Basin 11.pdf 2 US Highway 30 N 500TH AVE SAND HILL TRL S 500TH AVE NORTH DAKOTA AVE 240TH ST 270TH ST 13TH ST 215TH ST 200TH ST 265TH ST 24TH ST S 530TH AVE ZUMWALT STATION RD C I-35 HWY LINCOLN WAY TIMB RD SE 16TH ST STAGECOACH RD S US HIGHWAY 69 KEN MARIL RD DAYTON AVE STATE AVE E 13TH ST GEORGE W CA RV ER AVE BE A C H A V E 245TH ST ONTARIO ST 276TH ST E RIVERSIDE RD S RIVEDR PULLMAN ST ONION CREEK LN Access to city wells OLD BLOOMINGTON RD ADAMS ST AIRPORT RD 560TH AVE 250TH ST AVE 260TH ST 600TH A VE 11 6 2 1 5 13 8 7 9 12 4 3 10 15 14 µ 0 4,200 8,4002,100 Feet City Limits Roads Sanitary Study Basins City of Ames Sanitary System Evaluation Study 1 inch = 4,200 feet Project Locations: Basin 11 3