Loading...
HomeMy WebLinkAboutA001 - Council Action Form dated March 24,ITEM #:3 DATE:03-24-26 DEPT:AAMPO SUBJECT:AWARD OF FFY 2027-2030 STBG FUNDS TRANSPORTATION POLICY COMMITTEE ACTION FORM BACKGROUND: On December 18, 2025, the Ames Area Metropolitan Planning Organization (AAMPO) released a 2026 Notice of Funding Opportunity (NOFO) for the Surface Transportation Block Grant (STBG) Program and Transportation Alternatives Program (TAP). The NOFO was distributed electronically to all AAMPO member agencies and was also made publicly available on the MPO website. The document outlined the funding programs, eligible project types, application requirements, and the scoring criteria that would be used to evaluate submitted applications. Funding was available for projects wishing to receive funds between federal fiscal years (FFYs) 2027-2030. Applications were due to the MPO on February 20, 2026. A total of four (4) STBG applications were received (see attachments). No TAP applications were submitted during this cycle. All STBG applications were evaluated by MPO staff and scored on a 100-point scale using the criteria identified in the NOFO, which included: Impact on the regional transportation network (60 points) Alignment with Ames Connect 2050 and other adopted plans (25 points) Project readiness and understanding of the federal-aid process (10 points) Public involvement (5 points) The following table summarizes the received STBG applications, requested funding amounts, final application scores, and award recommendations: Sponsor Project Description FFY STBG Amount Requested Application Score Award Recom- mendation CyRide Purchase 40’ Heavy-Duty Transit Bus 2030 $400,000 89 Award Full Amount City of Ames E 13th St EB (Between I-35 Ramps) & Lincoln Way/Dayton Ave Intersection Reconstruction 2028 $864,000 88 Award Full Amount City of Ames E 13th St (McCormick Ave to Dayton Ave) Reconstruction 2030 $995,000 84 Award Full Amount City of Ames Duff Ave (6th St to 13th St) Mill & Overlay 2028 $840,000 81 Award Full Amount 1 All four projects scored well under the adopted evaluation criteria and demonstrated meaningful regional transportation benefits. It was determined that each project: Is consistent with the goals and priorities identified in Ames Connect 2050. Can be accommodated within anticipated STBG funding targets while maintaining fiscal constraint. Demonstrates adequate project readiness and committed local match. Reflects an understanding of federal-aid requirements and delivery procedures. Includes appropriate public involvement efforts. Based on the scoring results and available funding targets, the recommendation is to award the full requested STBG funding amount to all four projects. Projects that receive STBG funding will be incorporated into the AAMPO’s FFY 2027–2030 Transportation Improvement Program (TIP). ALTERNATIVES: 1. Award the full amount of requested STBG funds to all four projects. 2. Award alternative amount(s) of STBG funds. 3. Do not award STBG funds to any project. MPO DIRECTOR'S RECOMMENDED ACTION: The STBG project selection process was conducted in accordance with the December 18, 2025, NOFO and all applicable state and federal requirements. Scoring was completed using the adopted evaluation criteria and reflects a transparent and consistent review process. All recommended projects support regional transportation system preservation, mobility, and safety goals and are fiscally constrained within anticipated STBG funding targets. Additionally, the Transportation Technical Committee unanimously recommends the full award of STBG funds to all four projects. Therefore, it is the recommendation of the MPO Director that the Transportation Policy Committee adopt Alternative No. 1, as noted. ATTACHMENT(S): STBG Projects Presentation Slides.pdf CyRide - Purchase 40' Heavy-Duty Bus.pdf Ames - E 13th St EB (Between I-35 Ramps) & Lincoln Way-Dayton Ave Intersection.pdf Ames - E 13th St (McCormick Ave to Dayton Ave).pdf Ames - Duff Ave (6th St - 13th St).pdf 2 STBG PROJECT APPLICATIONS FOR FFY 2027-2030 3 AWARD OF FFY 2027-2030 STBG FUNDS The MPO administers three formula grant programs: Surface Transportation Block Grant (STBG) Transportation Alternatives Program (TAP) Carbon Reduction Program (CRP) Each year, the MPO releases a notice of funding opportunity (NOFO) soliciting project applications from member agencies for the above grant programs. This year, the MPO released a NOFO on December 18, 2025, with an application deadline of February 20, 2026 for projects in FFYs 2027-2030. Carbon Reduction Program (CRP) applications were not accepted this year due to the uncertainty of the continuation of this grant program after the expiration of the current infrastructure bill later this year (IIJA/BIL).4 AWARD OF FFY 2027-2030 STBG FUNDS Basic Project Requirements: Project must be directly identified as a short-term fiscally-constrained project in the MPO’s current Metropolitan Transportation Plan (MTP), Ames Connect 2050. Exception: Roadway maintenance/reconstruction-type projects do not need to be directly identified but must demonstrate alignment with the MTP’s goals and priorities. Project must be located within the MPO planning area and be sponsored by one or more member agencies of the MPO. This year, the MPO received 4 applications for STBG funding. No applications were received for TAP funding. 5 AWARD OF FFY 2027-2030 STBG FUNDS Per the NOFO, STBG projects are scored using the following criteria: Impact on the regional transportation network (60%) Alignment with Ames Connect 2050 and other adopted plans (25%) Project readiness and understanding of the federal-aid process (10%) Public involvement (5%) 6 AWARD OF FFY 2027-2030 STBG FUNDS The following table shows the received STBG applications, requested STBG amount, final application scores, and staff funding recommendations: 7 AWARD OF FFY 2027-2030 STBG FUNDS CyRide Route Map 8 AWARD OF FFY 2027-2030 STBG FUNDS E 13th St EB (Between I-35 Ramps) & Lincoln Way/Dayton Ave Intersection Reconstruction 9 AWARD OF FFY 2027-2030 STBG FUNDS E 13th St (McCormick Ave to Dayton Ave) Reconstruction 10 AWARD OF FFY 2027-2030 STBG FUNDS Duff Ave (6th St – 13th St) Mill & Overlay 11 FY2030 Surface Transportation Block Grant Program Application Submitted to: AMES AREA METROPOLITAN PLANNING ORGANIZATION By: AMES TRANSIT AGENCY (CYRIDE) 601 N. University Blvd. Ames, Iowa 50010 February 20, 2026 12 13 14 15 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 1 Instructions: Type out responses to the following questions in the space provided. Once this form is complete, covert it to a PDF document and include it as Attachment A with the STBG application. Please be as concise as possible with responses to each question. Images and tables may be included with responses, but do not include images/tables shown in other attachments (e.g. detailed map, sketch plan, etc.). If referring to attachment images/tables, simply state which attachment they can be found in (e.g. Attachment B for a detailed map). 1. Provide a detailed descrip�on of the project, including informa�on such as loca�on, project termini, exis�ng site condi�ons, required easements/acquisi�ons, general construc�on ac�vi�es planned, etc. For non-construc�on projects, provide a summary of the planned ac�vi�es and procurements that are a part of the project with a descrip�on of each. Only provide details of project that are included within the scope of the funding request. Do not provide details of completed or future phases of the project, or por�ons of the scope not included with the funding request. CyRide is reques�ng the Ames Area MPO dedicate a por�on of their FY2030 Ames STBG funding alloca�on, $400,000, for a par�al purchase of a 40’ diesel heavy-duty (HD) transit bus to replace an older transit bus approximately 20 years old. Per federal regula�ons, this size of bus reaches its useful life for a transit system when the bus is 12 years of age. The planned ac�vi�es and procurements that are a part of this project are included on the project schedule within Part D of the STBG applica�on form. Addi�onally, Ques�on 6 on the Atachment A - Project Narra�ve discusses the technical aspects of the STBG grant and funding approval process for this project in detail. CyRide es�mates the funding will be approved/obligated in an grant with FTA by May 15, 2030. A�er CyRide officially approves a bus manufacturer and issues a purchase order for a 40’ HD transit bus, it will take 12 to 18 months for delivery of the bus. CyRide will follow all federal regulatory guidelines in the development of the grant applica�on and procurement of the vehicle. CyRide es�mates that delivery will occur by June 30, 2032. Upon delivery, CyRide will make payment to the bus manufacturer, make appropriate draws to FTA and close the grant within FTA’s grantmaking system called TrAMS by December 31, 2032. The new bus will operate throughout Ames, Iowa and Iowa State University campus in CyRide’s service area on bus routes shown within Atachment B - Detailed Map. 16 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 2 2. Describe this project’s benefits to the regional transporta�on network. Poten�al discussion points include improvements to opera�ons, accessibility, safety, pavement condi�on, connec�vity, efficiency/reliability, cost-benefit analysis, emissions reduc�on, etc. Where applicable, relate benefits to performance measures or targets included in the MPO’s planning documents (e.g. roadway safety targets, PM2/PM3 targets, TAM targets, transit safety targets). CyRide believes this project will provide outstanding benefits to the regional transportation network due to the following six evaluation criteria as developed by the AAMPO. 1. Benefit to the Regional Transportation Network (60%): • Operational Improvements: o Improved Transit Image: New buses make transit service more attractive to current riders, as well as riders completely unfamiliar with the service to provide an improved image of transit for Ames. A modern-looking and efficient bus fleet will alleviate fears that a single-occupant vehicle rider may have as they choose transit for their travel alternative throughout Ames. With frequent service along many corridors, choosing transit may become a more preferred option for residents travelling throughout Ames, whether for work, school, medical appointments, or social engagements. o Unique Branding: CyRide has developed a unique brand or image for our buses which may be seen in the under the C. Sketch Plan, even though this is only required for construction projects. This wavy swoop outside branding will allow the public to know that they are riding a newer bus with the newest technology (automatic vehicle location, automatic passenger counters, automatic announcements – verbal and audible) with wavy details instead of an older style bus when they board the bus. o Community Support of Public Transit: The Ames City Council continues to value environmental sustainability within their goals by supporting projects that increase the use of public transit and active transportation. Newer buses for CyRide will operate cleaner throughout the community as opposed to the 20-year-old vehicles they replace. The Council also encourages initiatives that help meet the Climate Action Plan including the purchase of battery-electric buses. If funding allows, CyRide may be able to upgrade a 40’ diesel bus to a 40’ battery-electric bus but we will not know if this is possible until 2030. Battery electric buses were recommended by the Ames City Council as well as supported by the entire community within the Ames’ Climate Action Plan. The Transit Board has already begun to implement its commitment to fund battery electric bus technology and infrastructure by approving to purchase up to 17 battery 17 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 3 electric buses in service. In the future, it is anticipated that batteries will eventually be able to operate the 18-20 hours CyRide operates and the quantity of buses can be increased beyond 17 buses. Currently, CyRide has seven BEBs operating in service as of February 2026. CyRide hopes to continue utilizing STBG funding to upgrade 40-foot diesel transit buses to battery electric buses and achieve the 17 battery-electric buses within its fleet by 2050, if not sooner. • Accessibility Improvements: The following accessibility features are available on all CyRide buses including the bus that would be purchased for this project: o Ramps or power lifts for passengers with mobility devices to get on or off the bus. Some buses also have a kneeling feature that lowers the first step of the bus closer to the curb for easier boarding. o Priority seating is located in the front of the bus for seniors and riders with limited mobility, as well as contain areas to secure passengers with mobility devices. Passengers with mobility devices must allow the driver to secure the mobility device to the bus. Seat belts are available as an option for passengers with mobility devices. o Passengers utilizing respirators, concentrators, or portable oxygen are allowed to ride CyRide’s services. o Public information and communications can be made available in accessible formats upon request. o CyRide announces major stops and transfer locations with its automatic voice annunciation (AVA) system providing riders with a better sense of where they are during their bus ride. This verbal announcement is also made visually through infotainment signage that CyRide has been implementing on buses within the fleet. Drivers will manually announce bus stops if this automated system becomes non-functional. Passengers can also request the driver manually announce any specific bus stop they need in addition to those that are provided automatically. o Speakers on the outside of the bus automatically announce the route and direction of the bus when the bus doors open at any transit bus stop. Drivers will announce at bus stops servicing more than one route if this automated system becomes non-functional. Typically, CyRide will switch out the bus if there are issues with the automated announcement information. o Service animals are permitted on all CyRide buses. Non-service animals are not permitted. o Reduced fares are available for seniors age 65 and older, passengers with a disability, passengers in Kindergarten through 12th grades and Medicare/Medicaid card holders. o Token Transit was added on January 21, 2025 allowing passengers to skip the trip to a pass sales outlet and pay their bus fare with their cell phone or other mobile device by using CyRide’s Token Transit. Payment for rides is more 18 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 4 accessible and all tickets/passes can be kept digitally on an individual’s cell phone. The transit rider no longer needs to keep track of their paper pass or ticket booklets or make a trip to a pass sales outlet to purchase their bus fare. A passenger can simply buy and then ride with their cell phone via Token Transit! • Safety: This project will help lower CyRide’s fleet age and thereby provide a safer fleet operating throughout the Ames community while furthering the community’s goal for reduced greenhouse emissions. Under the passing of MAP-21 transportation bill, Congress recognized the critical relationship between safety and asset condition when developing the National Safety Plan. They included the “state of good repair” definition for transit asset management (TAM) as “the condition in which the capital asset is able to operate at a full level of performance.” As a result of TAM, the federal government is placing more emphasis on transit agencies, as well as metropolitan planning organizations, to establish performance measures for their transportation modes, including public transit. CyRide communicated its performance measures and targets to the AAMPO and submitted their full TAM Plan in October 2025 which the AAMPO will utilize in future planning documents. CyRide has determined its performance measures and performance targets for FY2026-2030 for Rolling Stock and anticipates that 27% of assets will exceed the useful life benchmark of 15 years in 2030. These figures are updated annually each year. CyRide’s fleet age will become an important measurement for the Ames Area MPO to identify, as well as document, set future targets and rate projects for future funding within its LRTP documents. • Pavement Condition: This project is not a public works project and therefore, no concrete improvements will be provided from this project. • Connectivity: According to the Ames Area MPO’s Passenger Transportation Plan (pgs. 25-37), approximately 67-80% of the Ames population lives within a quarter mile of a transit route and therefore have ‘access’ to CyRide’s interconnected bus routes. A quarter mile is traditionally what a person would walk (two to three blocks) when catching a bus along a transit route. While this percentage fluctuates at night and on weekends, these times are when public transit isn’t as high in demand. This project would provide high connectivity throughout Ames as passengers can transfer to any bus route in the system as shown on the detailed map section (Attachment B) of this application. • Reliability & Efficiency: Mechanical breakdowns causing customer delays are significantly reduced by operating newer vehicles. Additionally, newer buses are easier to start during the cold Iowa winters. As buses age, their service reliability 19 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 5 decreases by approximately 39% which is evidenced by less miles between work orders for CyRide’s 2002 Orion fleet versus our newer 2020 Gillig fleet. Newer fleets average 15.8 work orders per 16,000 miles while older fleets average 40.7 work orders. By keeping a more modern fleet, costly repairs and service interruptions are kept at a minimum. New transit buses average 4.57 miles per gallon to operate, while vehicles in excess of 20 years currently average 3.43 miles per gallon. The vehicles replaced with STBG funds would likely be over 21+ years of age at the time of replacement after waiting 18 months for delivery. The cost of operating a newer bus in service compared to a 21-year-old bus could save CyRide nearly $2,800 (1,163 gallons * 2.40/gallon) annually per bus. Lower emissions polluting the air would be realized in Ames with less fuel being operated from a new bus as opposed to more fuel being operated in a 20+ year old bus for each mile driven. For every gallon of fuel saved, 9.17 kg of carbon dioxide would be saved equating to 10 tons annually (1,163 gallons fuel on average bus each year * 9.17 kg CO2/1,000) of CO2 saved. According to the US Census American Community Survey, 5.5% of Ames residents utilize transit for commuting purposes as opposed to 0.7% throughout the State of Iowa. (See Commuting Characteristics 2024 American Community Survey 5-Year Estimates). Therefore, a bus funded for the Ames metropolitan area would benefit more individuals throughout the region as CyRide carries substantially more passengers than any other transit system in the state. 20 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 6 As illustrated, CyRide’s transit system dramatically outperforms every other Iowa urbanized transit system as evidenced by the table to the right leading ridership throughout Iowa with just under 5 million passengers in FY2025. In fact, most of CyRide’s individual bus routes outperform other Iowa transit agencies’ annual ridership. With the level of ridership support for transit within the Ames community, financial support from the Ames Area MPO will meet the goal of providing cost-effective transportation services. Finally, CyRide is efficient in the service provided to its residents verses other transit agencies nationwide. Per the National Transit Database Small Transit Intensive Cities (STIC) data released September 1, 2024, CyRide is currently ranked second at 62.43 in urbanized areas providing passenger trips per capita for systems operating in populations between 50,000 and 200,000 for urban areas. (Riverhead-Southold, NY was first with 94.67) To illustrate how more efficient CyRide is versus a large urbanized area, a typical urbanized area with a population between 200,000-999,999 averages only 8.01744 passenger trips per capita. • Cost-Benefit: The estimated cost of the vehicle in FY2030 will be $1,535,000 for the purchase of a 40’ diesel heavy-duty (HD) transit bus. In addition to capital costs there are also operational costs to maintain the vehicle over time that the transit agency will assume. These costs are built into our operational budget each year. New transit buses average 4.57 miles per gallon to operate, while vehicles in excess of 20 years currently average 3.43 miles per gallon. The vehicles replaced with STBG funds would be over 21+ years of age at the time of replacement as it takes 12-18 months for delivery after awarding the project to a bus manufacturer. As explained earlier, the cost of operating a newer bus in service compared to a 21-year-old bus could save CyRide an average of $2,800 (1,163 gallons * 2.40/gallon) annually per bus. City 4,997,210 Des Moines 3,704,271 Cambus 2,685,160 Iowa City 1,836,918 Cedar Rapids 1,295,726 Davenport 710,333 Sioux City 673,868 Dubuque 406,707 Coralville 353,109 Waterloo 229,805 Council Bluffs 129,138 Bettendorf 71,292 21 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 7 • Environmental/Emissions Reductions: Lower emissions polluting the air would be realized with less fuel being operated from a new bus as opposed to more fuel being operated in a 20+-year old bus. For every gallon of fuel saved, 9.17 kg of carbon dioxide would be saved equating to 10 tons annually(1,163 gallons fuel * 9.17 kg CO2/1,000) of CO2 saved. 3. How does this project align with the AAMPO Metropolitan Transportation Plan, Ames Connect 2050? Does it align with other local, regional, or statewide planning documents or studies? Cite specific goals, projects, policies, or action items from plans and studies where applicable. Investments in public transit and specifically buses are supported through several MPO and City planning documents for the Ames community. • The City of Ames’ five-year Capital Improvements Plan with vehicle replacements noted are documented on page 137. • The Ames Connect 2050 (AAMPO Metropolitan Transportation Plan) lists short- term projects to replace buses on page 142 as well as on the illustrative project list in Appendix A. These plans illustrate that transit is an important element in the community as it relates to the existing and/or planned transportation facilities for all transportation modes throughout Ames. CyRide’s current STBG project builds on the momentum of these plans by advocating for consistent annual fleet replacement, which is desperately needed for the 33 buses that are beyond their useful life as identified in CyRide’s TAM Plan shared with the AAMPO. • CyRide’s Transit Asset management (TAM) Plan and performance target goals are supported from the AAMPO providing STBG funding for transit bus purchases. Per federal requirements the AAMPO is required to adopt and utilize performance measure targets including transit assets and transit safety targets. Funding the replacement of transit buses supports both CyRide’s Transit Asset Management (TAM) Plan performance target goals and the Ames Area MPO’s TAM plan matching goals. Per CyRide’s last submission in October 2025, 33 vehicles or 42% of the fleet currently exceed the useful life benchmark (ULB) of 15 years old. This is where the buses start wearing down and need additional maintenance to maintain them in a state of good repair. CyRide’s performance target for 2026 was to purchase nine buses (8 replacement, 1 expansion) leaving only 25 buses or 31.3% of the fleet past its ULB. The 2030 year of the current TAM plan has a goal of 27% of the fleet, 22 buses, past the ULB. After CyRide approves its TAM Plan and projected targets, CyRide notifies the MPO of its new TAM Plan and targets. The Ames Area MPO typically adopts CyRide’s TAM Plan targets within 180 days of CyRide’s submission. 22 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 8 • Replacing buses supports CyRide’s Transit Safety Targets by keeping vehicles in a state of good repair. (See CyRide’s Safety Plan.) Once buses reach 18 years of age, they begin to decline mechanically at a higher rate. Replacement keeps buses utilized for service in a safe state. • CyRide will add this project and STBG funding to the AAMPO’s FFY2027-2030 Transportation Improvement Program (TIP) and subsequent Iowa DOT Statewide TIP if the AAMPO approves our request for STBG funding in 2030. 4. What previous experience do exis�ng project sponsor staff have with the federal-aid project development process? Have past federal-aid projects been successfully delivered in a �mely and compliant manner? CyRide’s Transit Director has 33 years of transit management experience, and CyRide’s Transit Planner has extensive technical grant wri�ng exper�se with 30 years of experience of processing, developing and closing federal transit grants. Collec�vely, they have the knowledge and experience necessary to obligate and successfully manage federal grants as well as purchase buses in a �mely manner. For the past seven years (2020-2026), CyRide has successfully purchased buses with STBG funding awards from the Ames Area MPO through grants administered by the Federal Transit Administra�on (FTA). Details of each STBG award from the AAMPO and its current status are detailed below: • 2020 STBG – Awarded $225,000 federal for a par�al ar�culated bus purchase (7th in fleet) under grant IA-2020-036 which was executed on 7/21/2020. Nova 60’ HD Ar�culated bus #7 - #6149 was delivered 4/1/2022. Grant Closed with FTA on 3/13/2023. • 2021 STBG – Awarded $225,000 federal for a par�al ar�culated bus purchase (8th in fleet) under grant IA-2021-005 which was executed on 2/25/2021. Nova 60’ HD Ar�culated bus #8 #6150 was delivered 10/31/2022. Grant Closed with FTA on 1/14/2026 In 2023, NOVA Bus announced it would exit bus produc�on (ar�culated and batery- electric) in the U.S. market and close all American plants. Overall, CyRide has 8 NOVA ar�culated buses and 2 NOVA batery-electric buses in its fleet. Due to NOVA no longer producing vehicles in the United States, NOVA Bus no longer met Buy America requirements for federal funding purchases. Buy America rules require a minimum domes�c content threshold for rolling stock purchases over 70% of the bus as of 2020 and final assembly must occur in the United States. As a result, CyRide underwent a new procurement for buses purchased with 2022-2024 STBG funding which somewhat delayed these procurements and delivery processes below. 23 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 9 Addi�onally, buses drama�cally increased in price during this �me further complica�ng the procurement process in having our transit board fund any shor�alls with 100% local funding. • 2022 STBG – Awarded $225,000 federal for a par�al ar�culated bus purchase (9th in fleet) under grant IA-2022-020 which was executed on 5/4/2022. New Flyer 60’ HD Ar�culated bus #9 was delivered 11/24/2025. Grant Closed with FTA on 1/14/2026. • 2023 STBG - Awarded $225,000 federal for a par�al ar�culated bus purchase (10th in fleet) under grant IA-2023-012 which was executed on 5/17/2023. New Flyer 60’ HD Ar�culated #10 delivered 12/5/2025. Grant Closed with FTA on 2/3/2026. • 2024 STBG - Awarded $225,000 federal for a par�al batery-electric bus (BEB) purchase (7th in fleet) under grant IA-2024-007 which was executed on 5/30/2024;. Gillig 40’ HD BEB #7 was delivered 10/20/2025. Grant Closed with FTA on 1/22/2026. • 2025 STBG – Awarded $377,050 for a par�al batery-electric bus (BEB) purchase; Award under grant IA-2025-014 was executed on 4/18/2025. CyRide was also recently awarded funding from the Iowa DOT for ten diesel buses, however the programming they approved was severely deficient as the programming guidance was from 2022/2023. Overall, CyRide is by $1.5 million across 10 buses. As a result, CyRide requested a budget revision to modify the 2025 STBG funding toward this shor�all instead of just funding one batery-electric bus upgrade. CyRide has two diesel buses on order for delivery in spring 2026 for $637,000 per bus. The other eight buses will be purchased this fiscal year once addi�onal federal funding is iden�fied. At this �me, price es�mates are approximately $810,000 per bus with delivery 18-24 months a�er formal award. Grant Open as of 2/20/2026. • 2026 STBG– Awarded $377,050 for a par�al batery-electric bus (BEB) purchase; This grant has been under review with FTA since November 2025 and pending formal submital. CyRide an�cipates submi�ng the grant officially once the 2026 federal appor�onments are officially released with execu�on of the grant in the spring 2026. Grant Under Review with FTA since 11/2026. 24 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 10 5. Please discuss the public involvement process that has or will be followed for this project. For construc�on projects, describe the extent to which adjacent property owners, and other stakeholders have or will be informed of the proposed project. If any acquisi�ons or easements are an�cipated, provide a current assessment of property owner willingness/acceptance. CyRide’s public input process for buses is aligned within the Ames Area Metropolitan Planning Organiza�ons’ Metropolitan Transporta�on Plan and local Transporta�on Improvement Planning public input processes. If FY2030 STBG funding is approved, several years of addi�onal public input opportuni�es through the MPO’s TIP process will be available before any vehicles are purchased. Addi�onally, CyRide adds STBG funding within its Program of Projects public hearing requirements which will occur in the spring 2029. • FFY2026-2029 TIP/STIP: Bus expansion/replacement is iden�fied within all four years of the FFY2026-FFY2029 Ames Area Transporta�on Improvement Program (TIP) (htps://webgen1files1.revize.com/amesareametroplanningorgia/Planning%20Docs/ TIP/AAMPO%20FFY26-29%20TIP.pdf?t=202507100944420&t=202507100944420) (pages 26-32). These same projects are then incorporated into the Iowa Statewide Transporta�on Improvement Plan each October. Any STBG funding approved through this applica�on would be incorporated into the upcoming FFY2027-FFY2030 TIP and placed within year FY2030 and go through the Ames Area MPO’s TIP public input process as well as the subsequent Iowa DOT STIP. • Metropolitan Transportation (Long Range) Plan: Bus expansion/replacements are iden�fied as a short-term, mid-term and long-term projects within the Ames Area Metropolitan Planning Organiza�on’s Metropolitan Transporta�on Plan called Ames Connect 2050. (page 142 – Table 56). AAMPO 2050 MTP.pdf htps://webgen1files1.revize.com/amesareametroplanningorgia/Planning%20Docs/ MTP/AAMPO%202050%20MTP.pdf?t=202509251406300&t=202509251406300. • Program of Projects (POP): Under 49 U.S. C 5307(b) and as a direct recipient of FTA Sec�on 5307 funding, the Ames Transit Agency (CyRide) is required to annually develop a Program of Projects (POP) and make it available for public review detailing the project purpose and the available funding requested for these grant applica�ons. CyRide does hold a public hearing for its program of projects annually. STBG funding is iden�fied in this material and can be seen htps://www.cyride.com/about- us/planning-documents/current-planning-projects/program-of-projects. While the 2030 STBG project won’t be contained in CyRide’s POP un�l spring 2030, the AAMPO can view CyRide’s most recent FFY2026 POP that contains the 2026 STBG funding at https://www.cyride.com/home/showpublisheddocument/10456/638853289048 070000. 25 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 11 6. Is this project ready for development? Please describe the efforts taken to prepare for developing the project and iden�fy any poten�al issues an�cipated with the project and how the sponsor is prepared to handle those issues. For mul�-sponsor projects, what collabora�ve agreements and strategies are in place to ensure the project proceeds successfully? CyRide’s goal is to have the grant obligated/approved by May 2030, within a few months after 2030 apportionments are announced and funding is available. Past STBG grants were obligated in a grant anywhere between February and July depending on when Congress releases the funding. This project will be ready to go and be under review by the Federal Transit Administra�on (FTA) in a grant applica�on before the 2030 appor�onments are released by Congress. Once the appor�onments are released and the STBG 2030 funding is transferred from FHWA to FTA, FTA will then allow formal submital of the grant in their grant making so�ware called TrAMS. CyRide staff fully understands the process of how to request the transfer of STBG funding from Federal Highway (FHWA) to the Federal Transit Administra�on (FTA) to access the federal funds through a formal grant award from FTA for a future bus purchase. Once a purchase order is made to purchase a bus, it can take up to 18 months for the bus to be delivered to CyRide (i.e. June 2032). The en�re project schedule �meline is iden�fied under Part D of the applica�on form, but addi�onal details are provided below regarding CyRide’s technical exper�se to accomplish the project. • Grant Processing Understanding: CyRide’s Transit Director has 33 years of transit management experience, and CyRide’s Transit Planner has technical grant wri�ng exper�se with 30 years of experience of processing federal transit grants. Collec�vely, they have the knowledge and experience necessary to obligate and successfully manage federal grants and make awards in a �mely manner. CyRide has already successfully administered seven years (2020-2026) of STBG funding through FTA that was previously approved by the AAMPO as detailed in ques�on 4 of this narra�ve. Previous grants were always approved by spring following the alloca�on. Since CyRide began receiving STBG funding in 2020, it has completed purchases for five buses (4 ar�culated buses and 1 batery-electric) and has closed out those grant contracts as detailed under #4 of this project narra�ve. CyRide plans to u�lize 2025- 2026 STBG funding (previously for batery-electric upgrades) to help fund the purchase of ten diesel buses recently awarded but dras�cally under programmed. CyRide is $1.5 million short for the purchase of 10 buses awarded federal funding from the Iowa DOT. However, in the �me that it took the Iowa DOT contract to be approved, pricing of buses has drama�cally increased, leaving this shor�all. STBG 2025 and 2026 funding will hopefully help curtail this shor�all. CyRide also plans to request Volkswagen Setlement funding in 2026 to help with this issue as we understand there will be 4th round of requests for projects released by May 2026. 26 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 12 If approved for STBG 2030 funding by the AAMPO, CyRide will develop a grant applica�on in FTA’s grant making so�ware called the Transit Award Management System (TrAMS) and submit it to FTA for their review by November 1, 2029. Environmental approval for the bus project will be processed within TrAMS through a categorical exclusion under the Na�onal Environmental Policy Act (NEPA) 23 CFR § 771.118 (c)(7). Finally, CyRide will ensure the project will be contained in an approved Statewide Transporta�on Improvement Program (STIP) on both FHWA and FTA’s sides of the STIP beginning on October 1, 2029. Once the grant applica�on is prepared in TrAMS, the project will have planning and environmental approvals with pre-grant authority to move forward with the bus procurement. CyRide es�mates it will have pre-award to award the bus purchase by November 30, 2029. • STBG Transfer from FHWA to FTA Process Understanding: On October 1, 2029, CyRide will request that the Ames Area MPO begin the process to have the Iowa DOT transfer the STBG funding from FHWA to FTA. The federal grant will be submited to FTA shortly a�er the appor�onments are formally announced in the spring 2030. FTA will only allow the federal grant to be fully submited in TrAMS a�er the STBG funding has been formally transferred between federal agencies (FHWA to FTA) and the money is available to obligate in a contract. As a result of comple�ng the grant early in the year and FTA conduc�ng its ini�al review process, the grant should be easily approved within a few months once the funding transfer is complete. Finally, the grant is required to go through the Department of Labor (DOL) for formal approval once the grant is submited in TrAMS which adds a month to the �meline to obtain this necessary cer�fica�on. • Local Match Securement: CyRide will secure the $100,000 in local match for this STBG grant through its capital planning process for FY2030. Therefore, the local match will be formally approved and available by July 1, 2029 for this grant ensuring project readiness. • Procurement Readiness: CyRide’s Assistant Director of Fleet & Facili�es has six years of experience in bus procurement and has also participated in several FTA procurement trainings to ensure accurate federal purchasing requirements. CyRide has had only two findings in its past four triennial reviews for regulatory compliance and has never had a procurement finding in its triennial review history that began in 2005. On average, grant recipients typically receive seven findings per review therefore CyRide performs well above average in following procurement procedures. Under Sec�on 3019 of the FAST Act, grantees are now allowed to purchase rolling stock and related equipment from coopera�ve state procurement contracts. As a result, CyRide has iden�fied several state contracts that it can purchase buses with to make the procurement process easier and �melier. Once the contract has been 27 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 13 iden�fied and validated as an acceptable procurement in 2030, the project can be officially awarded to the bus manufacturer. A�er the purchase order is made, the delivery of the bus can take up to 18 months. CyRide does not foresee any addi�onal bus manufacturers leaving the United States. NOVA announced in June 2023 that it would leave the U.S and focus its efforts toward the Canadian Market. Currently Gillig (Livermore, California) and New Flyer (St. Cloud, Minnesota) are CyRide’s best op�ons to purchase large 40’ or 60’ transit buses. 7. How was the project cost es�mate developed, and what level of confidence does the sponsor have in the es�mate at this stage? Iden�fy any major cost risks. The Iowa Department of Transportation recently released its FY2027 Programming Guidance (See Attachment H) for transit vehicles citing that the cost for a 2027 bus will be $1,058,600 for a 40’ heavy duty transit bus with additional add-ons of auxiliary heaters, AVL/automated annunciators and a vehicle surveillance system. These optional add-ons are standard purchases for CyRide. This FY2027 Programming Guidance is a 48.6% increase over the previous FY2026 Programming Guidance of $712,000 for a 40’ HD diesel transit bus which was a 9.5% increase over the over the FY2025 Programming Guidance of $650,200. To summarize, this represents a 62.8% increase for buses in a two-year span for the state’s programming guidance. Their previous increases were 3-4%. CyRide is confident that this estimate for 2027 will successfully allow it to procure buses in 2027 without having to request the transit board to cover additional shortfalls with 100% local funding. CyRide estimates that its FY2030 heavy-duty 40’ diesel transit bus purchase will be approximately $1,535,000. (See table below for details.) Following previous price increase trends, CyRide envisions costs will continue to increase at the same rate as they have over the past four years. Therefore, CyRide anticipates a 45% increase between 2027 and 2030. STBG funding can help CyRide to fully fund a bus replacement each year. 2027 2028 2029 2030 TOTAL DIESEL Bus Price Estimate (45% Increase from 2027 2030)$1,058,600 $1,198,335 $1,356,515 $1,535,000 $469,830 $558,668 $685,212 $828,000 STBG (80%) $400,000 (Base Bus 20% local $117,458 $139,667 $171,303 $207,000 28 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 14 The bus will be partially federally funded through a contract with the Iowa DOT. If the contract is fully funded at 80% for the full bus price, then CyRide might be able to utilize STBG funding to purchase a larger articulated bus or upgrade a diesel bus to a battery- electric bus upgrade instead. Given that large 40’ diesel buses have doubled within a short timeframe, CyRide will need to revisit whether battery-electric has also doubled as well in addition to whether this technology is still affordable for CyRide. In any regard, CyRide will plan to utilize the 2030 STBG for a large bus purchase to replace an older bus that is likely 18+ years of age within its fleet. If the bus price is more than the bus price estimated for 2030, CyRide will fund this difference with 100% local from their budget. With the current price estimate, CyRide would contribute $307,000 in local funding towards this purchase which would be secured and approved by the Transit Board in that years’ capital improvement plan. 8. What are the an�cipated long-term maintenance responsibili�es associated with this project, and has the project sponsor planned for these obliga�ons? The Federal Transit Administra�on (FTA) requires recipients of federal funds to maintain assets, including vehicles, in a “State of Good Repair” (SGR) throughout their useful life. The useful life of a 40’ heavy duty transit bus is 12 years and/or 500,000 miles whichever comes first. For CyRide, a bus will reach its 12-year useful life age first and might never reach the mileage requirement due to the Ames service area miles. CyRide’s buses operate an average of 17,000 miles each year. CyRide retains its buses between 18-22 years as it typically takes that long to receive federal funding for replacement through the Iowa DOT. CyRide has an in-house maintenance shop that conducts all required maintenance of its buses, including pain�ng and body work if necessary. Below are the long-term maintenance responsibili�es CyRide typically will conduct, which are detailed within its Vehicle Maintenance Plan and updated with each new bus delivery type to ensure compliance with the bus manufacturers’ maintenance requirements for a specific fleet: • Preven�ve Maintenance (PM) – CyRide will perform long-term maintenance responsibili�es including preven�ve maintenance (PM) on the vehicles according to the manufacturer recommenda�ons for the specific vehicle. PM’s are important as that will help the bus avoid unplanned breakdowns during service. • Safety and Accessibility Compliance – CyRide will maintain all federally funded vehicles and keep them in a safe opera�ng condi�on, including ADA features. If the ADA features of a bus do not operate, the bus will be exchanged with a different bus to ensure ADA 29 AAMPO 2026 STBG Applica�on Atachment A – Project Narra�ve 15 service is maintained. CyRide’s buses are all low-floor vehicles with a ramp to access the bus as opposed to a ADA “wheelchair li�.” • Record Keeping and Repor�ng – CyRide will maintain detailed organized records of all maintenance inspec�ons, repairs and service disrup�ons for compliance with FTA regula�ons which are reviewed during triennial reviews • Capital Improvement Planning – CyRide will manage the life cycle of the bus, including planning for replacement when the bus reaches the end of its useful life. If the bus is no longer safe to operate, CyRide may purchase a like-kind exchange to replace the vehicle with a used bus that might have addi�onal life remaining. • Con�ngency Assets: If the bus becomes unused due to a reduced peak-pull out requirement (i.e. demand for transit service declining), CyRide will evaluate its spare ra�o and create a con�ngency fleet plan for vehicles exceeding the 20% spare ra�o to keep them in a state of good repair or possibly dispose of buses to avoid long-term, unsupported costs. • Transit Asset Management (TAM) Plan - CyRide develops a comprehensive Transit Asset management (TAM) plan every year to update the inventory and condi�on data of its vehicular fleet to submit through the Na�onal Transit Database to FTA. CyRide also shares this informa�on with the Ames Area MPO annually in October. 30 B. DETAILED MAP Detailed Map: CyRide currently operates a progressive, seamless transit system with a high service level and frequency rivaling much larger communities by running 13 fixed routes, 18 hours/day, 7 days a week. CyRide circulates its buses to all routes operating throughout Ames. Service frequencies on bus routes are every 4 – 20 minutes during peak periods and every 30-40 minutes when there is less demand. 31 C. SKETCH-PLAN New CyRide Bus Below is a photo of CyRide’s newer heavy duty 40-foot bus that was placed into service in 2020. CyRide’s image improves with the sharp look of newer buses travelling through the Ames community with improved emissions. Once a STBG grant is approved, CyRide typically five years to spend the funding. 32 D. ITEMIZED COST BREAKDOWN Itemized Cost Breakdown of 40’ Heavy Duty Diesel Bus Price Estimate: CyRide estimates that its FY2030 heavy-duty 40’ diesel transit bus purchase will be approximately $1,535,000. (See table below for details.) Following previous price increase trends, CyRide envisions costs will continue to increase at the same rate as they have over the past four years. Therefore, CyRide anticipates a 45% increase between 2027 and 2030. STBG funding can help CyRide to fully fund a bus replacement each year. 2027 2028 2029 2030 $1,058,600 $1,198,335 $1,356,515 $1,535,000 $469,830 $558,668 $685,212 $828,000 STBG (80%) $400,000 $94,263 $100,000 $100,000 $100,000 $117,458 $139,667 $171,303 $207,000 The bus will be partially federally funded through a contract with the Iowa DOT. If the contract is fully funded at 80% for the full bus price, then CyRide might be able to utilize STBG funding to purchase a larger articulated bus or upgrade a diesel bus to a battery-electric bus upgrade instead. Given that large 40’ diesel buses have doubled within a short timeframe, CyRide will need to revisit whether battery-electric has also doubled as well in addition to whether this technology is still affordable for CyRide. In any regard, CyRide will plan to utilize the 2030 STBG for a large bus purchase to replace an older bus that is likely 18+ years of age within its fleet. If the bus price is more than the bus price estimated for 2030, CyRide will fund this difference with 100% local from their budget. With the current price estimate, CyRide would contribute $307,000 in local funding towards this purchase which would be secured and approved by the Transit Board in that years’ capital improvement plan (see page 137). 33 E. OFFICIAL ENDOSEMENT 34 F. FUNDING SOURCE DOCUMENTATION Funding Source Documentation: Federal Funding - CyRide anticipates federal funding for buses through one or possibly more of the following resources that would contribute to a partial bus purchase involving STBG. Overall, the Iowa DOT funded 40 buses for replacement with $8.7 million in 5339(a) and CRP funding in FFY2025 with CyRide receiving funding for 1 bus in FFY2025. • Federal Discretionary Funding – Grants for Bus and Bus Facilities Formula Program (5339a): Each year, Iowa receives approximately $1,700,000 annually to distribute out to large urban transit systems. All funds are spent on vehicle replacements rather than on expansion vehicle and are distributed utilizing the vehicles ranking os the Public Transit Management System (PTMS). CyRide receives its distribution through this PTMS process. Contracts are then awarded from the Iowa DOT to CyRide for these purchases. • Federal Discretionary Funding – Bus and Bus Facilities Competitive Program (5339b): This is the same funding as 5339a funding but distributed through a nationally competitive solicitation by FTA. The Iowa DOT applies on behalf of all transit agencies for bus replacement but CyRide can apply directly to FTA for this grant funding. • Federal Discretionary Funding – Low or No Emission Grant Program (5339c): This is the same funding as 5339a funding but distributed through a nationally competitive solicitation by FTA. The Iowa DOT applies on behalf of all transit agencies for clean fuel buses (i.e. battery-electric or hybrid) but CyRide can apply directly to FTA for this grant funding. • Carbon Reduction Program (CRP): This funding was enacted in November of 2021. This program provides funding for projects that are designed to reduce emissions of carbon dioxide from on- road highway resources. This funding is typically dispersed through the PTMS process with the (5339a) discretionary funding. The Iowa DOT typically reserves $3 million a year from CRP to allocate out for bus replacement. Local Funding – CyRide identifies all its funding within the following documents: • City of Ames Capital Improvements Plan. (see page 137). Documentation cites the “transit fund” for the local portion required for vehicle purchases each year. Typically the first few years contain grant funding already received where the out years are projected awards. The 2030 STBG funding and bus funding would be identified in the 2030/31 year when the next capital plan is developed. • CyRide Budget Approval Process –CyRide’s Transit Board will approve its operating budget and capital program annually in December/January. This approval process provides a more in-depth look at CyRide’s capital planning process and operational budget requirements for the year. See CyRide’s December 2025 board packet (page 10-26). Page 22 illustrates the planned capital funding purchases for years 2027-2031. : 35 36 37 H. FY2027 PROGRAMMING GUIDANCE 38 FFY 2027 (October 1, 2026 - September 30, 2027) FFY 2028 (October 1, 2027 - September 30, 2028) FFY 2029 (October 1, 2028 - September 30, 2029) FFY 2030 (October 1, 2029 - September 30, 2030) Is this project listed in the most recent Metropolitan Transportation Plan? (NOTE: All projects except roadway maintenance/reconstruction projects must be listed as a short-term fiscally constrained project in the MTP.) What Federal Fiscal Year (FFY) will this project need funding for? (NOTE: For construction projects, this should be the year in which the letting date is anticipated to occur. Select ONE year.) Project Category (check all that apply): Federal-Aid Roadway (Maintenance, Rehab, Reconstruction)Bridge(s) On Any Public Road Transit Capital ProjectFederal-Aid Roadway (New Construction, Capacity Expansion, Safety Improvements, ITS improvements) Primary City, State Primary ZIP Code PART B - PROJECT INFORMATION Ames Area Metropolitan Planning Organization Regional Application for the STBG Funding Program PART A - APPLICANT INFORMATION Primary Sponsor/Applicant Agency Secondary Mailing Address Secondary City, State Secondary ZIP Code Enter the following information for the project's primary sponsor. Enter the following information for the project's secondary sponsor (if applicable). If the project has more than two sponsors, please attach an additional page with additional sponsor information. Primary Contact Person Primary Phone Primary Mailing Address 39 Matching Funds 1 2 3 4 Note: If any of the above matching funds are sourced from federal-aid funding, the combination of the existing federal-aid and the requested STBG funds must not exceed 80% of the total cost. PART D - PROJECT SCHEDULE Please provide a timeline of your project milestones below. For a construction project (or as applicable), estimated dates should be identified for major milestones such as: submittal of a concept statement, anticipated NEPA clearance, initiation of preliminary design, acquisition of right-of-way, completion of final design, planned project letting date, start of construction, estimated construction completion date, milestones as appropriate for your project. Projects should be let within two years of funds becoming Date Project Milestone Project Cost Summary (Only include costs for which federal-aid reimbursement is being requested) Match Source TOTAL COST (sum of above costs): STBG FUNDING REQUEST (max 80% of total cost): APPLICANT MATCH (min 20% of total cost): Date AnticipatedAmount PART C - PROJECT COSTS AND MATCHING FUNDS 40 Certification Title: Date: Attachment D - Itemized Cost Breakdown: An itemized breakdown for each of the project cost categories from Part C of this application form. Attachment G - Minority Impact Statement: A completed Iowa DOT Minority Impact Statement form (see NOFO and AAMPO website for link). the purposes for which it is intended; that records documenting the planning process and implementation will be maintained and submitted when requested, and the Iowa DOT is hereby granted access to inspect project sites and/or records. To the best of my knowledge and belief, all information included in this application is true and accurate, including the commitment of all physical and financial resources. This application has been duly authorized by the applying organization. The award of STBG program funds; any subsequent funding or letting of contracts for design, construction, reconstruction, improvement, or maintenance; or the furnishing of materials shall not involve direct or indirect interest, prohibited by Iowa Code 314.2, 362.5, or 331.342, of any state, county, or city official, elective or appointive. Any award of funding or any letting of a contract in violation of the foregoing provisions shall invalidate the award of funding and authorize a complete recovery of any funds previously disbursed. If funding assistance is approved by the AAMPO for the project described in this application, I understand that an executed agreement between the applicant and the Iowa DOT is required before the project can be started, costs incurred, or such funding assistance authorized for use in implementing the project. Application Form: This application form with all parts completed (Parts A-E). Attachment A - Project Narrative: This narrative should be completed using the form available Attachment B - Detailed Map: A map identifying the location of the project. Attachment C - Sketch-Plan: A sketch-plan of the project, including cross-section (only required for construction projects). Attachment F - Funding Source Documentation: Documentation for each funding source identified as secured by the applicant (or explanation for anticipated funding sources). Attachment E - Official Endorsement: An offical endorsement from the governing body of the project sponsor(s) via resolution. BOLD . PART E - CHECKLIST & CERTIFICATION 41 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 1 Instructions: Type out responses to the following questions in the space provided. Once this form is complete, covert it to a PDF document and include it as Attachment A with the STBG application. Please be as concise as possible with responses to each question. Images and tables may be included with responses, but do not include images/tables shown in other attachments (e.g. detailed map, sketch plan, etc.). If referring to attachment images/tables, simply state which attachment they can be found in (e.g. Attachment B for a detailed map). 1. Provide a detailed description of the project, including information such as location, project termini, existing site conditions, required easements/acquisitions, general construction activities planned, etc. For non- construction projects, provide a summary of the planned activities and procurements that are a part of the project with a description of each. Only provide details of project that are included within the scope of the funding request. Do not provide details of completed or future phases of the project, or portions of the scope not included with the funding request. This project involves the full reconstruction of the eastbound lanes of East 13th Street, beginning at the Interstate 35 ramp terminals and extending to the eastern project limits. The existing pavement has begun to fail under the stress of heavy traffic exiting the interstate, a condition expected to worsen as new industrial and commercial development continues immediately to the east. Construction activities will include the removal of the deteriorating surface and replacement with high-durability Portland Cement Concrete (PCC). While no right-of-way or easements are required for this phase, the design will proactively consider accommodation of the potential for a future shared-use path to ensure long-term multi-modal compatibility within the existing footprint. The project will also reconstruct the intersection of Lincoln Way and Dayton Avenue to address rapid pavement failure caused by high truck volumes in this industrial corridor. Work will include a full-depth PCC replacement and an evaluation of all subsurface utility pipes and structures to determine if replacement is necessary during the open-cut phase. To ensure full accessibility and compliance with current standards, all four corners of the intersection will be reviewed and reconstructed to meet ADA requirements. As with the East 13th Street segment, all construction activities will be contained within the existing public right-of-way, requiring no additional land acquisition. 42 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 2 2. Describe this project’s benefits to the regional transportation network. Potential discussion points include improvements to operations, accessibility, safety, pavement condition, connectivity, efficiency/reliability, cost-benefit analysis, emissions reduction, etc. Where applicable, relate benefits to performance measures or targets included in the MPO’s planning documents (e.g. roadway safety targets, PM2/PM3 targets, TAM targets, transit safety targets). This project provides vital improvements to the regional transportation network by addressing critical infrastructure needs at two high-volume nodes in the City of Ames. The full reconstruction of the East 13th Street eastbound lanes directly supports PM2 (Pavement Condition) targets by replacing failing pavement with high-performance PCC, ensuring the corridor can sustain the projected increase in traffic from new eastern developments without further degradation. By proactively addressing these structural issues before they escalate to complete failure, the project improves long- term reliability for commuters and industrial traffic accessing the I-35 corridor. Furthermore, the design's consideration for a future shared-use path aligns with the AAMPO Complete Streets Plan and Ames Connect 2050 goals of enhancing multi- modal connectivity and accessibility across the regional network. The reconstruction of the Lincoln Way and Dayton Avenue intersection targets significant improvements in efficiency and safety at a primary industrial intersection. This intersection is rapidly deteriorating under high truck volumes, and the transition to new PCC pavement will directly improve PM3 (System Performance) by ensuring reliable travel times and reducing maintenance-related disruptions. Additionally, the comprehensive ADA upgrades at all four corners contribute directly to regional accessibility and safety targets, supporting the AAMPO Comprehensive Safety Action Plan (CSAP) goal of zero serious injuries. By resolving critical pavement failures and improving intersection geometry for heavy vehicles, the project strengthens the regional logistics chain and ensures the industrial district remains economically competitive and operationally efficient. 3. How does this project align with the AAMPO Metropolitan Transportation Plan, Ames Connect 2050? Does it align with other local, regional, or statewide planning documents or studies? Cite specific goals, projects, policies, or action items from plans and studies where applicable. This project directly supports the primary goals of the Ames Connect 2050 Metropolitan Transportation Plan, specifically the "System Preservation and Stewardship" objective. By prioritizing the full reconstruction of East 13th Street and the Lincoln Way/Dayton 43 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 3 Avenue intersection, the city is fulfilling the plan’s mandate to maintain a high- performing transportation network through proactive asset management. Furthermore, the improvements at the Lincoln Way and Dayton intersection align with the goal of "Economic Development and Freight Movement" by ensuring that heavy truck traffic can navigate the industrial corridor efficiently without the operational delays caused by failing pavement. The project also integrates key priorities from other local and statewide planning documents. The comprehensive ADA upgrades and the design consideration for a future shared-use path on East 13th Street directly support the AAMPO Complete Streets Plan and the Comprehensive Safety Action Plan (CSAP), which aim to create a safe, multi-modal network with a target of zero serious-injury crashes. On a broader scale, replacing deteriorating segments with high-durability PCC pavement directly contributes to the Iowa DOT’s PM2 (Pavement Condition) targets and the state's five- year improvement goals. These actions ensure the city’s arterial infrastructure is resilient enough to handle the increased traffic demands generated by the new developments identified in the City of Ames Land Use Policy. 4. What previous experience do existing project sponsor staff have with the federal-aid project development process? Have past federal-aid projects been successfully delivered in a timely and compliant manner. The City of Ames maintains a highly experienced professional engineering staff with a proven track record of successfully navigating the federal-aid project development process. Our team, including the project managers and Civil Engineer staff, is well- versed in the rigorous requirements of the Iowa DOT and Federal Highway Administration (FHWA), including environmental clearances, NEPA documentation, and DBE compliance. We maintain project oversight that ensures all federal-aid milestones from initial programming and design approval to construction letting are met in accordance with the Federal-Aid Project Development Guide. Past federal-aid projects have been consistently delivered in a timely and compliant manner, with staff regularly completing the full Iowa DOT audit and close-out process. The City facilitates a final audit, ensuring all project documentation and financial records meet federal standards. Recent examples of successfully delivered projects include various Surface Transportation Block Grant (STBG) funded projects all of which remained within scope and budget. This knowledge ensures that the proposed East 13th Street and Lincoln Way projects will be managed with the same high level of technical proficiency and administrative. 44 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 4 5. Please discuss the public involvement process that has or will be followed for this project. For construction projects, describe the extent to which adjacent property owners, and other stakeholders have or will be informed of the proposed project. If any acquisitions or easements are anticipated, provide a current assessment of property owner willingness/acceptance. The public involvement process for this project follows the City of Ames’ outreach protocols to ensure all stakeholders are well-informed and engaged. The city will initiate direct communication with adjacent property owners and businesses by mailing formal notification letters that invite them to a public information meeting or provide a link to an informational website. City staff will then provide the project scope, construction timeline, and potential traffic impacts, and allow for a transparent dialogue and the opportunity for residents to provide feedback or ask specific technical questions. Additionally, the City of Ames utilizes an interactive online construction map, allowing the public to track the progress of projects in both the design and construction phases. Along East 13th Street, outreach will focus on coordination with developers and industrial businesses to ensure continued access as new developments move forward. At the Lincoln Way and Dayton Avenue intersection, the city will work to notify the traveling public to manage expectations regarding heavy truck traffic and lane closures. Because no right-of-way acquisitions or permanent easements are anticipated for either location, we expect a high level of property owner acceptance. A second formal notice will be distributed to all affected parties immediately prior to the start of construction to provide specific details on staging and access. 6. Is this project ready for development? Please describe the efforts taken to prepare for developing the project and identify any potential issues anticipated with the project and how the sponsor is prepared to handle those issues. For multi-sponsor projects, what collaborative agreements and strategies are in place to ensure the project proceeds successfully? This project is ready for development. The City of Ames has already developed a comprehensive Engineer’s Estimate outlining specific bid items, units, and quantities and has successfully secured the necessary local matching funds through the Capital Improvements Plan (CIP). Because the project footprint is contained within the existing public right-of-way, the typical delays associated with land acquisition and permanent easements have been eliminated. The City is prepared to begin the formal Request for 45 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 5 Proposal (RFP) process for a design consultant in Spring 2027, ensuring that the project remains on schedule for its intended letting date. While the project is technically straightforward, the City has identified and prepared for the potential issue of traffic management. To mitigate the impact of the high-volume truck traffic at the Lincoln Way and Dayton Avenue intersection, the City will utilize traffic control and staging strategies to complete project as soon as reasonable. To handle the risk of rising material costs or unforeseen subsurface conditions, the project budget includes a standard contingency fund. The project will be overseen by our experienced engineering staff who have a proven history of delivering federal-aid projects in compliance with all state and federal regulations. 7. How was the project cost estimate developed, and what level of confidence does the sponsor have in the estimate at this stage? Identify any major cost risks. The project cost estimate was developed using a detailed Engineer’s Estimate based on current market prices and recent bid tabs from similar City of Ames reconstruction projects. The estimate includes a comprehensive breakdown of anticipated bid items, including pavement removal, PCC placement, utility structures, and ADA-compliant sidewalk elements. The City has a high level of confidence in the accuracy of the baseline figures at this stage of project development. Additionally, while we have planned for the evaluation and replacement of existing utility pipes and structures, the possibility of encountering unforeseen conflicts during the open-cut phase of the Lincoln Way and Dayton Avenue intersection reconstruction is a recognized risk. To address this, the City has prioritized the preliminary utility evaluation phase to identify potential issues early in the design process, ensuring that any necessary adjustments are integrated into the final project scope before the letting date. 8. What are the anticipated long-term maintenance responsibilities associated with this project, and has the project sponsor planned for these obligations? The City of Ames will assume full responsibility for the long-term maintenance of both project locations. Because the project utilizes Portland Cement Concrete (PCC) pavement, the anticipated maintenance needs are significantly reduced compared to asphalt alternatives. Over the 30-to-40-year design life of the pavement, typical maintenance activities will include periodic joint sealing and occasional minor patching to ensure the structural integrity and rideability of the arterial roadway. For the intersection of Lincoln Way and Dayton Avenue, specific attention will be given to 46 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 6 monitoring the pavement under industrial truck loads to proactively identify any premature wear. The City has already integrated these long-term obligations into its comprehensive infrastructure management strategy. Maintenance costs are budgeted annually through the Public Works department's operating funds. This proactive approach ensures that the regional transportation network remains reliable and well-maintained without placing an undue burden on future city budgets. 47 48 49 50 51 ENGINEER'S ESTIMATE ARTERIAL STREET PAVEMENT IMPROVEMENT - E LINCOLN WAY & DAYTON INTERSECTION FULL-DEPTH PUBLIC WORKS DEPT.- ENGINEERING DIV. CITY OF AMES, IA 09/20/2022 Est Unit Item #Item Code Description Quant Unit Price Amount Division 1 - General (Not Used) Division 2 - Earthwork 2.1 2010-108-D-2 Topsoil, 8" Depth 46 cy 80.00 3,680.00 2.2 2010-108-E-0 Excavation, Class 10, 6" Depth 616.8 cy 30.00 18,504.00 2.3 2010-108-G-0 Subgrade Preparation, 12" Depth 3700.7 sy 5.00 18,503.50 2.4 2010-108-I-0 Special Backfill, 6" Depth 3700.7 sy 15.00 55,510.50 Division 3 - Trench, Backfill and Tunnelling (Not Used) Division 4 - Sewers and Drains 4.1 4040-108-A-0 Subdrain and Fittings, Perforated, PVC, 4" dia. 0 lf 15.00 0.00 4.2 4050-108-C-2 Spot Repairs by Pipe Replacement 0 lf 100.00 0.00 Division 5 - Water Mains and Appurtenances 5.1 5020-108-G-0 Valve Box Replacement, Adjustment 2 ea 1000.00 2,000.00 Division 6 - Structures for Sanitary and Storm Sewer 6.1 6010-108-A-0 Manhole Type SW-301, 48" dia. 0 ea 8000.00 0.00 6.2 6010-108-B-0 Intake Type SW-501 0 ea 5000.00 0.00 6.3 6010-108-E-0 Manhole Adjustment, Minor 1 ea 1500.00 1,500.00 6.4 6010-108-F-0 Manhole Adjustment, Major 0 ea 2500.00 0.00 6.5 6010-108-H-0 Remove Manhole/Intake 0 ea 1500.00 0.00 Division 7 - Streets and Related Work 7.1 7010-108-A-0 Pavement,PCC, 8" Depth 3700.7 sy 85.00 314,559.50 7.2 7010-108-E-0 Curb & Gutter, 30" width, 12" thick @ BOC 0 lf 0.00 0.00 7.3 7010-108-G-0 Concrete Median 69.6 sy 100.00 6,960.00 7.4 7020-108-A-0 Pavement, HMA, 5" depth 0 ton 0.00 0.00 7.5 7030-108-A-0 Removal of Sidewalk/Shared Use Path/Driveway 87.9 sy 20.00 1,758.00 7.6 7030-108-B-0 Removal of Curb 0 lf 0.00 0.00 7.7 7030-108-C-0 Shared Use Path, HMA or PCC, 5" depth 0 sy 0.00 0.00 7.8 7030-108-E-0 Sidewalk, PCC, 4" depth 0 sy 75.00 0.00 7.9 7030-108-E-0 Sidewalk, PCC, 6" depth 87.9 sy 80.00 7,032.00 7.10 7030-108-G-0 Detectable Warning 144 sf 50.00 7,200.00 7.11 7030-108-H-1 Driveway, Paved, PCC, 6" depth 0 sy 80.00 0.00 7.12 7040-108-A-0 Full Depth Patch 0 sy 0.00 0.00 7.13 7040-108-G-0 Milling 0 sy 0.00 0.00 7.14 7040-108-H-0 Pavement Removal 3700.7 sy 10.00 37,007.00 7.15 7040-108-I-0 Curb & Gutter Removal 0 lf 0.00 0.00 7.16 7080-108-B-0 Engineering Fabric/Geogrid Fabric 925 sy 5.00 4,625.00 Division 8 - Traffic Control 8.1 8020-108-B-0 Painted Pavement Markings, Durable 37.47 sta 375.00 1,286.10 Painted Symbols 6 ea 700.00 1,286.10 8.2 8030-108-A-0 Traffic Control 1 ls 40000.00 40,000.00 Division 9 - Sitework and Landscaping 9.1 9040-108-F-1 Wattles 200 lf 3.50 700.00 9.2 9040-108-T-1 Inlet Protection Device 4 ea 200.00 800.00 9.3 9040-108-T-2 Inlet Protection Device, Maintenance 4 ea 50.00 200.00 Division 10 - Demolition (Not Used) Division 11 - Miscellaneous 11.1 11010-108-A Construction Survey/Staking 1 ls 7500.00 7,500.00 11.2 11010-108-B Pedestrian Facility Construction Survey & Staking 2 ea 300.00 600.00 11.3 11020-108-A Mobilization 1 ls 75000.00 75,000.00 11.4 11060-108-A Concrete Washout 1 ls 5000.00 5,000.00 --------------------- SUBTOTAL 611,211.70 ENGINEERING (15%) 91,681.76 CONTINGENCY (12%) 73,345.40 --------------------- TOTAL $776,238.86 Note: Existing pavement is 9" or 10" PCC; turn lanes have 6" special backfill S:\PublicWorks-Engineering\CIP Projects - Proposed\3_Transportation-Street Improvements\7_Arterial Street\2029-30 E 13th (Under I-35), East Lincoln Way & Dayton Ave Intersection\E Lincoln Way-Dayton Intersection 52 ENGINEER'S ESTIMATE ARTERIAL STREET PAVEMENT IMPROVEMENT - E 13TH ST (BETWEEN I-35 RAMPS) MILL & OVERLAY PUBLIC WORKS DEPT.- ENGINEERING DIV. CITY OF AMES, IA 09/04/2024 W of Crescent - Grand Unit Est Item Item Code Description Unit Price Quant Subtotal Division 1 - General (Not Used) Division 2 - Earthwork (Not Used) Division 3 - Trench, Backfill and Tunnelling (Not Used) Division 4 - Sewers and Drains (Not Used) Division 5 - Water Mains and Appurtenances (Not Used) Division 6 - Structures for Sanitary and Storm Sewer (Not Used) Division 7 - Streets and Related Work 7.1 7021-108-A-0 HMA Surface, 1/2" Mix, 2" Depth ton 120.00 605.3 72,636.00 7.2 7040-108-A-0 Full Depth Patches sy 100.00 1501 150,100.00 7.3 7040-108-G-0 Milling, 2" Depth sy 7.50 5002.7 37,520.25 7.4 7040-108-H-0 Pavement Removal sy 25.00 1501 37,525.00 Division 8 - Traffic Control 8.1 8020-108-B-0 Painted Pavement Markings, High-Build 38.96 sta 375.00 14,610.00 8.2 8020-108-G-0 Painted Symbols 0 ea 800.00 0.00 8.3 8030-108-A-0 Traffic Control 1 ls 40000.00 40,000.00 Division 9 - Sitework and Landscaping 9.1 9040-108-F-1 Wattles 200 lf 5.00 1,000.00 Division 10 - Demolition (Not Used) Division 11 - Miscellaneous 11.1 11010-108-A Construction Survey/Staking 1 ls 7500.00 7,500.00 11.2 11020-108-A Mobilization 1 ls 75000.00 75,000.00 11.3 11060-108-A Concrete Washout 0 ls 10000.00 0.00 SUBTOTAL ESTIMATED COST 435,891.25 ENGINEERING (20%) 87,178.25 CONTINGENCY (12%) 52,306.95 TOTAL ESTIMATED COST 575,376.45 Assume 30% Full Depth Patches Note: Existing pavement is 10" PCC S:\PublicWorks-Engineering\CIP Projects - Proposed\3_Transportation-Street Improvements\7_Arterial Street\2029-30 E 13th (Under I-35), East Lincoln Way & Dayton Ave Intersection\E 13th St (Ramp-Ramp) 53 RESOLUTION NO. 26-065 RESOLUTION CERTIFYING THE GRANT APPLICATION FOR THE 2027/28 ARTERIAL STREET PAVEMENT IMPROVEMENTS PROGRAM FOR THE CITY OF AMES, IOWA WHEREAS, as part of the Ames Area Metropolitan Planning Organization (AAMPO) Surface Transportation Block Grant (STBG) application process, the applicant must certify that it will commit the necessary local matching funds for project implementation and, upon completion, be responsible for adequately maintaining and operating the project for public use during its useful life; and, WHEREAS, the City of Ames is applying for $864,000 in federal funding for the 2027/28 Arterial Street Pavement Improvement Program . A local funding match of $486,000 is programmed into the Capital Improvements Plan under the 2027/28 Arterial Street Pavement Improvement Program. These funds are sufficient to cover the required local match as well as project engineering. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that the grant application for the 2027/28 Arterial Street Pavement Improvements Program (East 13th Street and East Lincoln Way/Dayton Avenue Intersection) is hereby certified. ADOPTED THIS 10th day of February, 2026. _______________________________ _________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Beatty-Hansen Seconded by: Betcher Voting aye: Beatty-Hansen, Betcher, Corrieri, Junck, Gartin, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 10th day of February, 2026. 54 ITEM #:13 DATE:02-10-26 DEPT:PW SUBJECT:2027/28 ARTERIAL STREET PAVEMENT IMPROVEMENTS - E 13TH STREET (BETWEEN THE RAMPS UNDER INTERSTATE 35) AND THE EAST LINCOLN WAY/DAYTON AVENUE INTERSECTION GRANT APPLICATION COUNCIL ACTION FORM BACKGROUND: As part of the Ames Area Metropolitan Planning Organization (AAMPO) Surface Transportation Block Grant (STBG) application process, the applicant must certify that it will commit the necessary local matching funds for project implementation and, upon completion, be responsible for adequately maintaining and operating the project for public use during its useful life. The City of Ames is applying for $864,000 in federal funding for the 2027/28 Arterial Street Pavement Improvement Program, which includes E 13th Street (between ramps under Interstate 35) and the East Lincoln Way/Dayton Avenue intersection. A local funding match of $486,000 is programmed into the Capital Improvements Plan under the 2027/28 Arterial Street Pavement Improvement Program. These funds are sufficient to cover the required local match as well as project engineering. Below is a table showing the revenues and estimated expenses. Funding Source Revenue Expenses 2027/28 Arterial Street Pavement Improvements (G.O. Bonds) $ 486,000 2027/28 AAMPO STBG Funds 864,000 Estimated Construction $1,080,000 Estimated Engineering/Administration 270,000 TOTAL $1,350,000 $1,350,000 ALTERNATIVES: 1. Certify the Ames Area Metropolitan Planning Organization STBG grant application for the 2027/28 Arterial Street Pavement Improvements - E 13th Street and East Lincoln Way/Dayton Avenue intersection. 2. Do not certify the Ames Area Metropolitan Planning Organization STBG grant application for the 2027/28 Arterial Street Pavement Improvements - E 13th Street and East Lincoln Way/Dayton Avenue intersection. 1 55 CITY MANAGER'S RECOMMENDED ACTION: Local certification is a requirement of this AAMPO grant application and receiving this grant is crucial to secure funding for the 2027/28 Arterial Street Pavement Improvements Program E 13th Street and East Lincoln Way/Dayton Avenue intersection. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as described above. It should be noted that during project development of the E 13th project, staff will evaluate the possibility of an expansion of multi-modal facilities through the extent of the project. ATTACHMENT(S): Location Map 2027-28 Arterial Street Pavement Improvements (E 13th St - between I-35 Ramps).pdf Location Map E Lincoln Way-Dayton Ave Intersection.pdf 2 56 57 58 FFY 2027 (October 1, 2026 - September 30, 2027) FFY 2028 (October 1, 2027 - September 30, 2028) FFY 2029 (October 1, 2028 - September 30, 2029) FFY 2030 (October 1, 2029 - September 30, 2030) Is this project listed in the most recent Metropolitan Transportation Plan? (NOTE: All projects except roadway maintenance/reconstruction projects must be listed as a short-term fiscally constrained project in the MTP.) What Federal Fiscal Year (FFY) will this project need funding for? (NOTE: For construction projects, this should be the year in which the letting date is anticipated to occur. Select ONE year.) Project Category (check all that apply): Federal-Aid Roadway (Maintenance, Rehab, Reconstruction)Bridge(s) On Any Public Road Transit Capital ProjectFederal-Aid Roadway (New Construction, Capacity Expansion, Safety Improvements, ITS improvements) Primary City, State Primary ZIP Code PART B - PROJECT INFORMATION Ames Area Metropolitan Planning Organization Regional Application for the STBG Funding Program PART A - APPLICANT INFORMATION Primary Sponsor/Applicant Agency Secondary Mailing Address Secondary City, State Secondary ZIP Code Enter the following information for the project's primary sponsor. Enter the following information for the project's secondary sponsor (if applicable). If the project has more than two sponsors, please attach an additional page with additional sponsor information. Primary Contact Person Primary Phone Primary Mailing Address 59 Matching Funds 1 2 3 4 Note: If any of the above matching funds are sourced from federal-aid funding, the combination of the existing federal-aid and the requested STBG funds must not exceed 80% of the total cost. PART D - PROJECT SCHEDULE Please provide a timeline of your project milestones below. For a construction project (or as applicable), estimated dates should be identified for major milestones such as: submittal of a concept statement, anticipated NEPA clearance, initiation of preliminary design, acquisition of right-of-way, completion of final design, planned project letting date, start of construction, estimated construction completion date, milestones as appropriate for your project. Projects should be let within two years of funds becoming Date Project Milestone Project Cost Summary (Only include costs for which federal-aid reimbursement is being requested) Match Source TOTAL COST (sum of above costs): STBG FUNDING REQUEST (max 80% of total cost): APPLICANT MATCH (min 20% of total cost): Date AnticipatedAmount PART C - PROJECT COSTS AND MATCHING FUNDS 60 Certification Title: Date: Attachment D - Itemized Cost Breakdown: An itemized breakdown for each of the project cost categories from Part C of this application form. Attachment G - Minority Impact Statement: A completed Iowa DOT Minority Impact Statement form (see NOFO and AAMPO website for link). the purposes for which it is intended; that records documenting the planning process and implementation will be maintained and submitted when requested, and the Iowa DOT is hereby granted access to inspect project sites and/or records. To the best of my knowledge and belief, all information included in this application is true and accurate, including the commitment of all physical and financial resources. This application has been duly authorized by the applying organization. The award of STBG program funds; any subsequent funding or letting of contracts for design, construction, reconstruction, improvement, or maintenance; or the furnishing of materials shall not involve direct or indirect interest, prohibited by Iowa Code 314.2, 362.5, or 331.342, of any state, county, or city official, elective or appointive. Any award of funding or any letting of a contract in violation of the foregoing provisions shall invalidate the award of funding and authorize a complete recovery of any funds previously disbursed. If funding assistance is approved by the AAMPO for the project described in this application, I understand that an executed agreement between the applicant and the Iowa DOT is required before the project can be started, costs incurred, or such funding assistance authorized for use in implementing the project. Application Form: This application form with all parts completed (Parts A-E). Attachment A - Project Narrative: This narrative should be completed using the form available Attachment B - Detailed Map: A map identifying the location of the project. Attachment C - Sketch-Plan: A sketch-plan of the project, including cross-section (only required for construction projects). Attachment F - Funding Source Documentation: Documentation for each funding source identified as secured by the applicant (or explanation for anticipated funding sources). Attachment E - Official Endorsement: An offical endorsement from the governing body of the project sponsor(s) via resolution. BOLD . PART E - CHECKLIST & CERTIFICATION 61 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 1 Instructions: Type out responses to the following questions in the space provided. Once this form is complete, covert it to a PDF document and include it as Attachment A with the STBG application. Please be as concise as possible with responses to each question. Images and tables may be included with responses, but do not include images/tables shown in other attachments (e.g. detailed map, sketch plan, etc.). If referring to attachment images/tables, simply state which attachment they can be found in (e.g. Attachment B for a detailed map). 1. Provide a detailed description of the project, including information such as location, project termini, existing site conditions, required easements/acquisitions, general construction activities planned, etc. For non- construction projects, provide a summary of the planned activities and procurements that are a part of the project with a description of each. Only provide details of project that are included within the scope of the funding request. Do not provide details of completed or future phases of the project, or portions of the scope not included with the funding request. This project involves the full reconstruction of East 13th Street, a high-traffic principal arterial, beginning at the intersection of McCormick Avenue and extending eastward through the intersection of Dayton Avenue. The project terminates at the east side of the Dayton Avenue intersection. Currently, the Portland Cement Concrete (PCC) pavement in this corridor is experiencing advanced joint failure, which has compromised the roadway's structural integrity and ride quality. The scope of work includes the full removal of the existing pavement and its replacement with new, high-durability PCC. Additionally, the project will include a comprehensive evaluation and necessary repair of subsurface utilities and the reconstruction of all intersection access points to meet current ADA and PROWAG standards. All construction activities will take place within the existing public right-of-way, and no land acquisitions are required. 2. Describe this project’s benefits to the regional transportation network. Potential discussion points include improvements to operations, accessibility, safety, pavement condition, connectivity, efficiency/reliability, cost-benefit analysis, emissions reduction, etc. Where applicable, relate benefits to performance measures or targets included in the MPO’s planning documents (e.g. roadway safety targets, PM2/PM3 targets, TAM targets, transit safety targets). 62 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 2 The reconstruction of this segment provides critical benefits to the regional network by preserving a primary access route to Interstate 35 and supporting the heavy-duty demands of the Dayton Avenue industrial corridor. By addressing the failing joints and replacing the pavement with PCC, the project directly supports PM2 (Pavement Condition) targets, preventing further degradation of a key arterial. The project enhances "efficiency and reliability" for freight movement, as Dayton Avenue serves as a major north-south artery for industrial truck traffic. Furthermore, the planned ADA updates at the Dayton Avenue intersection will improve regional accessibility and pedestrian safety, aligning with the city’s commitment to a multi-modal and inclusive transportation system 3. How does this project align with the AAMPO Metropolitan Transportation Plan, Ames Connect 2050? Does it align with other local, regional, or statewide planning documents or studies? Cite specific goals, projects, policies, or action items from plans and studies where applicable. This project is a direct application of the "System Preservation" goals outlined in the AAMPO Ames Connect 2050 Metropolitan Transportation Plan. By investing in the replacement of deteriorating arterial pavement, the City is adhering to the plan’s long- term asset management strategy. The project also aligns with the AAMPO Complete Streets Plan by integrating ADA improvements into a high-traffic corridor, ensuring that infrastructure remains accessible to all users. Additionally, because East 13th Street serves as a gateway to the interstate, this reconstruction supports regional economic development goals by maintaining a reliable, heavy-duty connection between the Ames industrial area and the broader state highway system. 4. What previous experience do existing project sponsor staff have with the federal-aid project development process? Have past federal-aid projects been successfully delivered in a timely and compliant manner. The City of Ames Public Works department maintains an experienced professional engineering staff with a proven track record of successfully delivering federal-aid projects. Our team is well-versed in the requirements of the Iowa DOT and Federal Highway Administration (FHWA), including managing NEPA environmental clearances, Section 106 reviews, and Disadvantaged Business Enterprise (DBE) compliance. The City utilizes a internal project management framework that ensures all federal-aid milestones—from initial programming to construction letting—are met in full accordance with the Federal-Aid Project Development Guide. 63 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 3 Our staff is consistent and successful in the management of the federal-aid audit and close-out process. City staff regularly complete the full Iowa DOT final audit cycle, and we perform the pre-audit to ensure all documentation meets federal standards. This process includes the management of materials certifications, payroll records, and technical documentation using systems like Doc Express. 5. Please discuss the public involvement process that has or will be followed for this project. For construction projects, describe the extent to which adjacent property owners, and other stakeholders have or will be informed of the proposed project. If any acquisitions or easements are anticipated, provide a current assessment of property owner willingness/acceptance. The public involvement process for this project follows the City of Ames’ outreach protocols to ensure all stakeholders are well-informed and engaged. The city will initiate direct communication with adjacent property owners and businesses by mailing formal notification letters that invite them to a public information meeting or provide a link to an informational website. City staff will then provide the project scope, construction timeline, and potential traffic impacts, and allow for a transparent dialogue and the opportunity for residents to provide feedback or ask specific technical questions. Additionally, the City of Ames utilizes an interactive online construction map, allowing the public to track the progress of projects in both the design and construction phases. Along East 13th Street, outreach will focus on coordination with businesses to ensure continued access as construction progresses. The City will work to notify the traveling public to manage expectations regarding traffic and lane closures. Because no right-of- way acquisitions or permanent easements are anticipated for either location, we expect a high level of property owner acceptance. A second formal notice will be distributed to all affected parties immediately prior to the start of construction to provide specific details on staging and access. 6. Is this project ready for development? Please describe the efforts taken to prepare for developing the project and identify any potential issues anticipated with the project and how the sponsor is prepared to handle those issues. For multi-sponsor projects, what collaborative agreements and strategies are in place to ensure the project proceeds successfully? 64 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 4 This project is ready for development. The City of Ames has already developed a comprehensive Engineer’s Estimate outlining specific bid items, units, and quantities and has successfully secured the necessary local matching funds through the Capital Improvements Plan (CIP). Because the project footprint is contained within the existing public right-of-way, the typical delays associated with land acquisition and permanent easements have been eliminated. The City will begin the formal Request for Proposal (RFP) process for a design consultant in 2028, ensuring that the project remains on schedule for its intended letting date. While the project is technically straightforward, the City has identified and prepared for the potential issue of traffic management. To mitigate the impact of the high-volume truck traffic at the East 13th Street and Dayton Avenue intersection, the City will utilize traffic control and staging strategies to complete the project as soon as reasonable. To handle the risk of rising material costs or unforeseen subsurface conditions, the project budget includes a standard contingency fund. 7. How was the project cost estimate developed, and what level of confidence does the sponsor have in the estimate at this stage? Identify any major cost risks. The project cost estimate was developed using a detailed Engineer’s Estimate based on projected future market prices and recent bid tabs from similar City of Ames reconstruction projects. The estimate includes a comprehensive breakdown of anticipated bid items, including pavement removal, PCC placement, utility structures, and ADA-compliant sidewalk elements. The City has a high level of confidence in the accuracy of the baseline figures at this stage of project development. Identified cost risks include fluctuating material prices and potential unforeseen subsurface conditions. Additionally, while we have planned for the evaluation and replacement of existing utility pipes and structures, the possibility of encountering unforeseen conflicts during the open-cut phase of the project is a recognized risk. To address this, the City has prioritized the preliminary utility evaluation phase to identify potential issues early in the design process, ensuring that any necessary adjustments are integrated into the final project scope before the letting date. 8. What are the anticipated long-term maintenance responsibilities associated with this project, and has the project sponsor planned for these obligations? 65 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 5 The City of Ames assumes full responsibility for all long-term maintenance of the project area. By choosing a full PCC replacement, the City is maximizing the roadway's design life and reducing the frequency of future repairs. Anticipated maintenance will consist of routine joint sealing and pavement monitoring, which are already factored into the Public Works department's annual operating budget. This proactive reconstruction approach, including the update of subsurface utilities, minimizes the risk of emergency repairs and ensures the long-term reliability of this critical industrial and interstate- access corridor. 66 67 68 ENGINEER'S ESTIMATE 2026/27 ARTERIAL STREET PAVEMENT IMPROVEMENT - E 13TH ST (McCORMICK - DAYTON) FULL-DEPTH PUBLIC WORKS DEPT.- ENGINEERING DIV. CITY OF AMES, IA Rev 08/12/2024 Est Unit Item #Item Code Description Quant Unit Price Amount Division 1 - General (Not Used) Division 2 - Earthwork 2.1 2010-108-D-2 Topsoil, 8" Depth 175 cy 80.00 14,000.00 2.2 2010-108-E-0 Excavation, Class 10, 6" Depth 200 cy 25.00 5,000.00 2.3 2010-108-G-0 Subgrade Preparation, 12" Depth 5000 sy 5.00 25,000.00 2.4 2010-108-I-0 Special Backfill, 6" Depth 5000 sy 15.00 75,000.00 Division 3 - Trench, Backfill and Tunnelling (Not Used) Division 4 - Sewers and Drains Division 5 - Water Mains and Appurtenances 5.1 5020-108-G-0 Valve Box Replacement, Adjustment 5 ea 1000.00 5,000.00 Division 6 - Structures for Sanitary and Storm Sewer 6.3 6010-108-E-0 Manhole Adjustment, Minor 1 ea 2000.00 2,000.00 Division 7 - Streets and Related Work 7.1 7010-108-A-0 Pavement,PCC, 8" Depth 4586.9 sy 80.00 366,952.00 7.3 7010-108-G-0 Concrete Median 529.5 sy 50.00 26,475.00 7.5 7030-108-A-0 Removal of Sidewalk/Shared Use Path/Driveway 420.8 sy 20.00 8,416.00 7.9 7030-108-E-0 Sidewalk, PCC, 6" depth 214.8 sy 85.00 18,258.00 7.10 7030-108-G-0 Detectable Warning 50 sf 50.00 2,500.00 7.11 7030-108-H-1 Driveway, Paved, PCC, 6" depth 206 sy 85.00 17,510.00 7.12 7040-108-A-0 Full Depth Patch 2293.5 sy 120.00 275,220.00 7.14 7040-108-H-0 Pavement Removal 9173.7 sy 10.00 91,737.00 Division 8 - Traffic Control 8.1 8020-108-B-0 Painted Pavement Markings, High-Build 57.38 sta 500.00 1,286.10 Painted Symbols 5 ea 800.00 1,286.10 8.2 8030-108-A-0 Traffic Control 1 ls 40000.00 40,000.00 Division 9 - Sitework and Landscaping 9.1 9040-108-F-1 Wattles 200 lf 5.00 1,000.00 9.2 9040-108-T-1 Inlet Protection Device 4 ea 200.00 800.00 9.3 9040-108-T-2 Inlet Protection Device, Maintenance 4 ea 50.00 200.00 Division 10 - Demolition (Not Used) Division 11 - Miscellaneous 11.1 11010-108-A Construction Survey/Staking 1 ls 7500.00 7,500.00 11.2 11010-108-B Pedestrian Facility Construction Survey & Staking 2 ea 300.00 600.00 11.3 11020-108-A Mobilization 1 ls 75000.00 75,000.00 11.4 11060-108-A Concrete Washout 1 ls 10000.00 10,000.00 ---------------------- SUBTOTAL 1,070,740.20 CONTINGENCY (12%) 107,074.02 ---------------------- TOTAL $1,177,814.22 Note: Existing pavement is 10" PCC over 8" rubblized PCC S:\PublicWorks-Engineering\CIP Projects - Proposed\3_Transportation-Street Improvements\7_Arterial Street\2027-28 E 13th and Duff Ave\E 13th St (Dayton-McCormick)Funding 69 70 ITEM #:15 DATE:02-10-26 DEPT:PW SUBJECT:2029/30 ARTERIAL STREET PAVEMENT IMPROVEMENTS - EAST 13TH STREET (MCCORMICK AVENUE TO DAYTON AVENUE) GRANT APPLICATION COUNCIL ACTION FORM BACKGROUND: As part of the Ames Area Metropolitan Planning Organization (AAMPO) Surface Transportation Block Grant (STBG) application process, the applicant must certify that it will commit the necessary local matching funds for project implementation and, upon completion, be responsible for adequately maintaining and operating the project for public use during its useful life. The City of Ames is applying for $995,000 in federal funding for the 2029/30 Arterial Street Pavement Improvement program - East 13th Street (McCormick Avenue to Dayton Ave). A local funding match of $540,000 is programmed into the C apital Improvements Plan under the 2029/30 Arterial Street Pavement Improvements Program . These funds are sufficient to cover the required local match as well as project engineering. Below is a table showing the revenues and estimated expenses. Funding Source Revenue Expenses 2029/30 Arterial Pavement Improvements (G.O. Bonds) $ 540,000 2029/30 AAMPO STBG Funds 995,000 Estimated Construction $1,300,000 Estimated Engineering/Administration $ 235,000 TOTAL $1,535,000 $1,535,000 As part of the AAMPO application process, the City must certify that it will commit the necessary local matching funds for project implementation and, upon completion, be responsible for adequately maintaining and operating the project for public use during its useful life. ALTERNATIVES: 1. Certify the Ames Area Metropolitan Planning Organization STBG grant application for the 2029/30 Arterial Streets Pavement Improvements - E 13th Street (McCormick Avenue to Dayton Ave) 2. Do not certify the Ames Area Metropolitan Planning Organization STBG grant application for the 2027/28 Arterial Streets Pavement Improvements - E 13th Street (McCormick Avenue to Dayton Ave) 1 71 CITY MANAGER'S RECOMMENDED ACTION: Local certification is a requirement of this AAMPO grant application and receiving this grant is crucial to secure funding for the 2029/30 Arterial Streets Pavement Improvements Program - E 13th Street (McCormick Avenue to Dayton Ave). Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as described above. ATTACHMENT(S): Location Map 2029-30 Arterial E 13th St (McCormick to Dayton Ave).pdf 2 72 73 74 FFY 2027 (October 1, 2026 - September 30, 2027) FFY 2028 (October 1, 2027 - September 30, 2028) FFY 2029 (October 1, 2028 - September 30, 2029) FFY 2030 (October 1, 2029 - September 30, 2030) Is this project listed in the most recent Metropolitan Transportation Plan? (NOTE: All projects except roadway maintenance/reconstruction projects must be listed as a short-term fiscally constrained project in the MTP.) What Federal Fiscal Year (FFY) will this project need funding for? (NOTE: For construction projects, this should be the year in which the letting date is anticipated to occur. Select ONE year.) Project Category (check all that apply): Federal-Aid Roadway (Maintenance, Rehab, Reconstruction)Bridge(s) On Any Public Road Transit Capital ProjectFederal-Aid Roadway (New Construction, Capacity Expansion, Safety Improvements, ITS improvements) Primary City, State Primary ZIP Code PART B - PROJECT INFORMATION Ames Area Metropolitan Planning Organization Regional Application for the STBG Funding Program PART A - APPLICANT INFORMATION Primary Sponsor/Applicant Agency Secondary Mailing Address Secondary City, State Secondary ZIP Code Enter the following information for the project's primary sponsor. Enter the following information for the project's secondary sponsor (if applicable). If the project has more than two sponsors, please attach an additional page with additional sponsor information. Primary Contact Person Primary Phone Primary Mailing Address 75 Matching Funds 1 2 3 4 Note: If any of the above matching funds are sourced from federal-aid funding, the combination of the existing federal-aid and the requested STBG funds must not exceed 80% of the total cost. PART D - PROJECT SCHEDULE Please provide a timeline of your project milestones below. For a construction project (or as applicable), estimated dates should be identified for major milestones such as: submittal of a concept statement, anticipated NEPA clearance, initiation of preliminary design, acquisition of right-of-way, completion of final design, planned project letting date, start of construction, estimated construction completion date, milestones as appropriate for your project. Projects should be let within two years of funds becoming Date Project Milestone Project Cost Summary (Only include costs for which federal-aid reimbursement is being requested) Match Source TOTAL COST (sum of above costs): STBG FUNDING REQUEST (max 80% of total cost): APPLICANT MATCH (min 20% of total cost): Date AnticipatedAmount PART C - PROJECT COSTS AND MATCHING FUNDS 76 Certification Title: Date: Attachment D - Itemized Cost Breakdown: An itemized breakdown for each of the project cost categories from Part C of this application form. Attachment G - Minority Impact Statement: A completed Iowa DOT Minority Impact Statement form (see NOFO and AAMPO website for link). the purposes for which it is intended; that records documenting the planning process and implementation will be maintained and submitted when requested, and the Iowa DOT is hereby granted access to inspect project sites and/or records. To the best of my knowledge and belief, all information included in this application is true and accurate, including the commitment of all physical and financial resources. This application has been duly authorized by the applying organization. The award of STBG program funds; any subsequent funding or letting of contracts for design, construction, reconstruction, improvement, or maintenance; or the furnishing of materials shall not involve direct or indirect interest, prohibited by Iowa Code 314.2, 362.5, or 331.342, of any state, county, or city official, elective or appointive. Any award of funding or any letting of a contract in violation of the foregoing provisions shall invalidate the award of funding and authorize a complete recovery of any funds previously disbursed. If funding assistance is approved by the AAMPO for the project described in this application, I understand that an executed agreement between the applicant and the Iowa DOT is required before the project can be started, costs incurred, or such funding assistance authorized for use in implementing the project. Application Form: This application form with all parts completed (Parts A-E). Attachment A - Project Narrative: This narrative should be completed using the form available Attachment B - Detailed Map: A map identifying the location of the project. Attachment C - Sketch-Plan: A sketch-plan of the project, including cross-section (only required for construction projects). Attachment F - Funding Source Documentation: Documentation for each funding source identified as secured by the applicant (or explanation for anticipated funding sources). Attachment E - Official Endorsement: An offical endorsement from the governing body of the project sponsor(s) via resolution. BOLD . PART E - CHECKLIST & CERTIFICATION 77 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 1 Instructions: Type out responses to the following questions in the space provided. Once this form is complete, covert it to a PDF document and include it as Attachment A with the STBG application. Please be as concise as possible with responses to each question. Images and tables may be included with responses, but do not include images/tables shown in other attachments (e.g. detailed map, sketch plan, etc.). If referring to attachment images/tables, simply state which attachment they can be found in (e.g. Attachment B for a detailed map). 1. Provide a detailed description of the project, including information such as location, project termini, existing site conditions, required easements/acquisitions, general construction activities planned, etc. For non- construction projects, provide a summary of the planned activities and procurements that are a part of the project with a description of each. Only provide details of project that are included within the scope of the funding request. Do not provide details of completed or future phases of the project, or portions of the scope not included with the funding request. The project is located in Ames, Iowa, specifically along the Duff Avenue corridor. The project will extend from 6th Street to 13th Street to the north. All activities described are contained within these specific boundaries. The current roadway section consists of a Portland Cement Concrete (PCC) base with an existing asphalt overlay. The surface is showing signs of wear and age, necessitating a preservation to extend the service life. The planned construction involves a multi-step rehabilitation process. Initial activities include milling the existing asphalt surface to the underlying PCC base. Following the milling process, the exposed concrete will undergo necessary patching to repair any structural deficiencies. Once patching is complete, a new asphalt surface will be placed across the entire project area. As a part of the reconstruction and surface improvement, all pedestrian curb ramps along the project limits will be evaluated and reconstructed. This ensures that all ramps from 6th Street to 13th Street are brought up to current ADA standards for slope, width, and detectable warnings. All proposed work will be performed within the existing public right-of-way. No permanent easements or land acquisitions are required for the completion of the construction activities included in this funding request. 2. Describe this project’s benefits to the regional transportation network. Potential discussion points include improvements to operations, accessibility, safety, pavement condition, connectivity, efficiency/reliability, cost-benefit analysis, emissions reduction, etc. Where applicable, relate benefits to 78 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 2 performance measures or targets included in the MPO’s planning documents (e.g. roadway safety targets, PM2/PM3 targets, TAM targets, transit safety targets). The Duff Avenue rehabilitation project provides significant regional benefits by preserving a primary arterial that serves as a critical link in the Ames transportation network. As a federally classified Principal Arterial, Duff Avenue funnels high volumes of multimodal traffic between Lincoln way and 13th Street and this project directly supports the Ames Area Metropolitan Planning Organization (AAMPO) goals outlined in the Ames Connect 2050 Metropolitan Transportation Plan. By milling and patching the existing concrete base before applying a new asphalt overlay, the project directly addresses PM2 (Pavement and Bridge Condition) targets by improving the International Roughness Index (IRI) and preventing the pavement from reaching a "poor" classification, which avoids more costly full-depth reconstruction in the future. Safety and accessibility are primary benefits, as the project includes the survey of all pedestrian curb ramps to update to current ADA standards. This supports the AAMPO’s Comprehensive Safety Action Plan (CSAP) and the regional goal of reaching zero fatal and serious-injury crashes by 2050 (PM1). Bringing these ramps into compliance enhances the safety and efficiency of the non-motorized network, particularly for vulnerable users at high-demand crossings. Furthermore, the restoration of a smooth driving surface improves operational efficiency and vehicle fuel economy, contributing to regional emissions reduction goals and PM3 (System Performance) targets by ensuring reliable travel times on a key transit and freight corridor. The project represents a cost- effective preservation strategy that maximizes the service life of existing infrastructure while enhancing the overall connectivity and reliability of the regional network. 3. How does this project align with the AAMPO Metropolitan Transportation Plan, Ames Connect 2050? Does it align with other local, regional, or statewide planning documents or studies? Cite specific goals, projects, policies, or action items from plans and studies where applicable. Alignment with AAMPO Ames Connect 2050 This project is consistent with the AAMPO 2050 Metropolitan Transportation Plan (MTP), specifically addressing several of its five primary goal areas: System Preservation: The project fulfills the MTP policy of maintaining the existing transportation system in a state of good repair. By utilizing a mill-and-patch approach on 79 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 3 a Principal Arterial, the city is proactively managing pavement life cycles to meet PM2 (Pavement Condition) targets and avoid more costly full-depth reconstruction. Safety (PM1): Consistent with the Comprehensive Safety Action Plan (CSAP) integrated into Ames Connect 2050, this project incorporates "Safe System Approach" principles. The inclusion of ADA-compliant curb ramps directly reduces the risk of harm to vulnerable road users, supporting the regional goal of zero fatal and serious-injury crashes by 2050. Accessibility and Connectivity: By bringing all pedestrian crossings from 6th to 13th Street up to current ADA standards, the project fulfills MTP objectives to develop an interconnected, multimodal system that is accessible for all users, including those with decreased mobility. Alignment with Local and Statewide Plans Ames City Council Strategic Plan (2026-2030 CIP): This project aligns with the City of Ames’ commitment to infrastructure stewardship. The 2026-2030 Capital Improvements Plan earmarks significant funding (approximately $144 million) for transportation, with a specific focus on reconstructing and resurfacing arterial roads and bus routes to ensure the longevity of the network. Ames Complete Streets Plan: The rehabilitation of Duff Avenue adheres to the city’s Complete Streets policy by balancing motorized throughput with improved pedestrian access and safety. The upgrades ensure that the arterial remains a functional component of a "multimodal street" that serves transit and active transportation. Iowa DOT Five-Year Transportation Program: This project supports the Iowa DOT's stewardship objective for modernization and maintenance of the state's existing highway system. While Duff Avenue is a local jurisdiction project, its maintenance as a Principal Arterial is critical to the performance of the statewide network and aligns with the Iowa DOT’s focus on safety and infrastructure resiliency. 4. What previous experience do existing project sponsor staff have with the federal-aid project development process? Have past federal-aid projects been successfully delivered in a timely and compliant manner. The City of Ames has extensive experience managing federal-aid projects, consistently delivering infrastructure improvements that adhere to Iowa DOT (IDOT) and FHWA requirements. The City maintains a robust internal framework for navigating the federal- aid project development process, including environmental clearances (NEPA), right-of- way acquisition protocols, and Disadvantaged Business Enterprise (DBE) compliance. 80 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 4 City staff regularly complete the IDOT and federal audit and close-out process for federal-aid projects, ensuring that all project documentation, including material certifications, final pay quantities, and test results, are thoroughly reviewed and archived. This process includes performing an internal pre-audit of all contract items as outlined in IDOT Instructional Memorandum (I.M.) 6.110 to facilitate a seamless final audit by the IDOT Administering Team. The City’s administrative staff is proficient in using systems like Doc Express for document management and ensuring that final reimbursement requests are submitted promptly following the completion of field work and final inspections. Past federal-aid projects have been successfully delivered in a timely and compliant manner, with the City effectively managing the required three-year record retention period post-closeout, demonstrating a consistent ability to meet all technical and financial accountability standards. 5. Please discuss the public involvement process that has or will be followed for this project. For construction projects, describe the extent to which adjacent property owners, and other stakeholders have or will be informed of the proposed project. If any acquisitions or easements are anticipated, provide a current assessment of property owner willingness/acceptance. The public involvement process for the Duff Avenue rehabilitation follows a structured outreach strategy, starting with the mailing of formal letters to adjacent property owners and residents to invite them to a public information meeting. During this meeting, City staff present specific project details, including the milling and paving process, and discuss anticipated impacts on local access and traffic patterns. As the project nears the construction phase, a second notice is sent to residents to provide final updates on scheduling and contact information. In addition to these direct communications, the City of Ames maintains an interactive construction map that allows the public to view both upcoming projects and those currently in the design phase. Because the work is contained within the existing public right-of-way and no permanent easements are expected to be required, the project is anticipated to have a high level of stakeholder willingness and acceptance. 6. Is this project ready for development? Please describe the efforts taken to prepare for developing the project and identify any potential issues anticipated with the project and how the sponsor is prepared to handle those issues. For multi-sponsor projects, what collaborative agreements and strategies are in place to ensure the project proceeds successfully? 81 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 5 This project is ready for development, as it aligns with the City of Ames' long-term infrastructure strategy. The City of Ames has officially certified that the required local matching funds will be available, as reflected in the current Capital Improvements Plan (CIP). The City will initiate a formal Request for Proposal (RFP) process in the spring of 2027 to select a qualified design consultant. In preparation for this development, the City has conducted preliminary site assessments to confirm the scope of the mill-and- overlay work. Potential issues, such as encountering unforeseen subgrade instability after the milling of the existing road way will be address with added full depth patching items to the project. The City utilizes a project management framework that includes regular internal audits and coordination with the Iowa DOT to ensure all federal-aid milestones are met. The City of Ames will manage all internal departmental coordination and public outreach. 7. How was the project cost estimate developed, and what level of confidence does the sponsor have in the estimate at this stage? Identify any major cost risks. The project cost estimate was developed through a systematic review of existing site conditions with the creation of an Engineer’s Estimate. This detailed estimate incorporates specific bid items, standardized units of measurement, and calculated quantities based on the project’s physical dimensions and required rehabilitation steps. The City of Ames maintains a high level of confidence in this estimate at this stage, as the unit pricing is derived from a longitudinal analysis of recent bid tabs for similar mill- and-overlay and ADA improvement projects within the region However, the City has identified potential cost risks including fluctuating liquid asphalt prices and the possibility of discovering more extensive concrete base deterioration than initially visible after the milling process. To mitigate these risks, the estimate includes a contingency factor consistent with projects at this level of preliminary design, ensuring Ames is prepared to handle minor variations in patching quantities or material costs without compromising the project's overall scope or delivery timeline. 8. What are the anticipated long-term maintenance responsibilities associated with this project, and has the project sponsor planned for these obligations? The long-term maintenance of Duff Avenue will be managed through the City of Ames pavement management program, which focuses on proactive preservation to maximize the life of the new asphalt surface. Routine responsibilities will include periodic crack sealing and surface assessments to prevent moisture infiltration and base deterioration. 82 AAMPO 2026 STBG Applicaon Aachment A – Project Narrave 6 The City has fully planned for these obligations, with long-term funding secured through the Capital Improvements Plan (CIP) and dedicated local revenue streams like the Road Use Tax. By integrating this corridor into the City’s existing maintenance cycle, the sponsor ensures the project will remain in a state of good repair and continue to meet regional performance targets for years to come. 83 84 85 86 ENGINEER'S ESTIMATE 2027/28 ARTERIAL STREET REHAB (DUFF AVE: 6TH - 13TH) - MILL & OVERLAY PUBLIC WORKS DEPT.- ENGINEERING DIV. CITY OF AMES, IA 09/15/2025 * Water is in good shape Est Unit Item Item Code Description Quant Unit Price Amount Division 1 - General (Not Used) Division 2 - Earthwork 2.1 2010-108-D-2 Topsoil, 8" Depth cy 80.00 0.00 Division 3 - Trench, Backfill and Tunnelling (Not Used) Division 4 - Sewers and Drains (Not Used) Division 5 - Water Mains and Appurtenances 5.1 5020-108-G-0 Valve Box Replacement, Adjustment ea 1000.00 0.00 Division 6 - Structures for Sanitary and Storm Sewer 6.1 6010-108-E-0 Adjust Manhole, Minor ea 2000.00 0.00 6.2 Sanitary Sewer Manhole, Remove and Replace 19 ea 8000.00 152,000.00 6.3 Sanitary Sewer Removal/Replacement 1180 lf 515.00 607,700.00 Division 7 - Streets and Related Work 7.2 7010-108-G-0 Curb & Gutter, 30" width, 12" thick @ BOC sy 40.00 0.00 HMA Surface, 3" Depth ton 120.00 0.00 7.3 7030-108-A-0 Removal of Sidewalk/Driveway sy 20.00 0.00 7.4 7030-108-E-0 Drive/Sidewalk, PCC, 6" depth sy 85.00 0.00 7.5 7030-108-E-0 Sidewalk, PCC, 6" depth sy 85.00 0.00 7.6 7030-108-G-0 Detectable Warning sf 50.00 0.00 7.7 7040-108-H-0 Pavement Removal sy 10.00 0.00 7.8 7040-108-I-0 Curb & Gutter Removal lf 15.00 0.00 Pavement Scarification, 3" depth sy 25.00 0.00 Division 8 - Traffic Signals 8.1 8020-108-B-0 Painted Pavement Markings, Solvent/Waterborne sta 375.00 0.00 8.2 8020-108-G-0 Painted Symbols and Legends ea 800.00 0.00 8.3 8030-108-A-0 Temporary Traffic Control ls 25000.00 0.00 Division 9 - Sitework and Landscaping 9.1 9040-108-F-1 Wattles lf 5.00 0.00 9.2 9040-108-T-1 Inlet Protection Device ea 200.00 0.00 9.3 9040-108-T-2 Inlet Protection Device, Maintenance ea 50.00 0.00 Division 10 - Demolition (Not Used) Division 11 - Miscellaneous 11.1 11010-108-A Construction Survey/Staking ls 10000.00 0.00 11.2 1101-108-A Monument Preservation and Replacement ls 3000.00 0.00 11.3 11010-108-B Pedestrian Facility Construction Survey & Staking ea 300.00 0.00 11.4 11020-108-A Mobilization ls 50000.00 0.00 11.5 11060-108-A Concrete Washout ea 2000.00 0.00 ------------------------- SUBTOTAL ESTIMATED COST 759,700.00 CONTINGENCY (12%) 91,164.00 ------------------------- TOTAL ESTIMATED COST 850,864.00 S:\PublicWorks-Engineering\CIP Projects - Proposed\3_Transportation-Street Improvements\7_Arterial Street\2027-28 E 13th and Duff Ave\Duff (6th-13) Cost Est(Funding) 87 RESOLUTION NO. 26-066 RESOLUTION CERTIFYING GRANT APPLICATION FOR THE 2027/28 ARTERIAL STREET PAVEMENT IMPROVEMENTS PROGRAM FOR THE CITY OF AMES, IOWA WHEREAS, as part of the Ames Area Metropolitan Planning Organization (AAMPO) Surface Transportation Block Grant (STBG) application process, the applicant must certify that it will commit the necessary local matching funds for project implementation and, upon completion, be responsible for adequately maintaining and operating the project for public use during its useful life; and, WHEREAS, the City of Ames is applying for $840,000 in federal funding for the 2027/28 Arterial Street Pavement Improvement Program . A local funding match of $450,000 is programmed into the Capital Improvements Plan under the 2027/28 Arterial Street Pavement Improvement Program. These funds are sufficient to cover the required local match as well as project engineering. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that the grant application for the 2027/28 Arterial Street Pavement Improvements Program - Duff Avenue (6th Street - East 13th Street) is hereby certified. ADOPTED THIS 10th day of February, 2026. _______________________________ _________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Corrieri Seconded by: Junck Voting aye: Beatty-Hansen, Betcher, Corrieri, Junck, Gartin, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 10th day of February, 2026. 88 ITEM #:14 DATE:02-10-26 DEPT:PW SUBJECT:2027/28 ARTERIAL STREET PAVEMENT IMPROVEMENTS - DUFF AVE (6TH STREET - EAST 13TH STREET) GRANT APPLICATION COUNCIL ACTION FORM BACKGROUND: As part of the Ames Area Metropolitan Planning Organization (AAMPO) Surface Transportation Block Grant (STBG) application process, the applicant must certify that it will commit the necessary local matching funds for project implementation and, upon completion, be responsible for adequately maintaining and operating the project for public use during its useful life. The City of Ames is applying for $840,000 in federal funding for the 20 27/28 Arterial Street Pavement Improvement Program - Duff Ave (6th Street to East 13th Street ). A local funding match of $450,000 is programmed into the Capital Improvements Plan under the 2027/28 Arterial Street Pavement Improvement Program . These funds are sufficient to cover the required local match as well as project engineering. Below is a table showing the revenues and estimated expenses. Funding Source Revenue Expenses 2027/28 Arterial Pavement Improvements (G.O. Bonds) $ 450,000 2027/28 AAMPO STBG Funds 840,000 Estimated Engineering/Administration $ 190,000 Estimated Construction 1,100,000 TOTAL $1,290,000 $1,290,000 ALTERNATIVES: 1. Certify the Ames Area Metropolitan Planning Organization STBG grant application for the 2027/28 Arterial Street Pavement Improvement program - Duff Ave (6th Street to East 13th Street). 2. Do not certify the Ames Area Metropolitan Planning Organization STBG grant application for the 2027/28 Arterial Street Pavement Improvement program - Duff Ave (6th Street to East 13th Street). CITY MANAGER'S RECOMMENDED ACTION: Local certification is a requirement of this AAMPO grant application and receiving this grant is crucial to secure funding for the 2027/28 Arterial Streets Pavement Improvements Program - Duff Ave (6th Street to East 13th Street). Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as described above. 1 89 ATTACHMENT(S): Project Location Map 2027-28 Arterial- Duff Ave.pdf 2 90 91 92