Loading...
HomeMy WebLinkAboutA001 - Council Action Form dated March 10, 2026ITEM #:18 DATE:03-10-26 DEPT:W&PC SUBJECT:CHANGE ORDER NO. 1 WITH TERRACON FOR SPECIAL TESTING ASSOCIATED WITH THE WATER POLLUTION CONTROL FACILITY NUTRIENT REDUCTION MODIFICATIONS PHASE I PROJECT COUNCIL ACTION FORM BACKGROUND: On September 4, 2024, Council awarded a contract to Terracon Consultants to provide concrete and geotechnical testing services for the Water Pollution Control Facility Nutrient Reduction Modifications Phase I project, in the amount of $67,885. Third-party inspections for these services are essential in ensuring that the materials incorporated into the finished project meet the design requirements. The contract with Terracon was based on the planned construction schedule and sequence, with an estimate of the number of days that an inspector would be needed on-site and an estimate of the number of tests that would be necessary over the two- plus years of construction. As the construction has progressed, the allowance for testing has been utilized faster than anticipated. There is still a significant amount of vertical, structural concrete left to be poured and continuing the testing services is essential. Staff has reviewed the remaining work schedule with Terracon, the general contractor, and the design engineer in order to develop a change order that all parties believe will be sufficient to complete the necessary testing. Funding and expenses for the project are shown in the table below, reflecting the updated balance should this change order be approved. Table 1: Total Project Funding & Expenses Funding Expenses Prior Years FY 2023 1,000,472 FY 2024 1,438,643 FY 2025 18,573,090 FY 2026 Adjusted 34,384,990 FY 2027 7,250,000 WTFAP Grant 500,000 Engineering 6,038,000 Construction Original Contract 53,370,000 Change Order #1 (231,878) Change Order #2 (25,280) Change Order #3 10,836 Change Order #4 13,459 1 Change Order #5 (40,743) Change Order #6 71,845 Change Order #7 44,527 Change Order #8 3,842 Owner Allowance (furnishings, etc.) 400,000 Special Inspections Original Contract 67,855 Change Order #1 - This Action 35,205 All Other Expenses 54,820 TOTAL 63,067,195 59,812,488 Available Contingency 3,254,707 ALTERNATIVES: 1. Approve Change Order No. 1 to the agreement with Terracon for special testing associated with the Nutrient Reduction Modifications Project in an amount not to exceed $35,205. 2. Do not approve the change order at this time. This would result in the remaining concrete materials not being tested. CITY MANAGER'S RECOMMENDED ACTION: Large construction projects utilize specialized construction materials and techniques. Often, these methods require independent third-party inspections to ensure that the finished product meets the quality standards that are specified. For the WPCF Nutrient Removal Modifications project, these inspections have included, among other things, concrete testing. These tests are critical to verify that the concrete being delivered to the site meets the required strength and mix specifications. The contract with the third-party testing firm, Terracon, was initially prepared based on an estimated number of days of on-site work and number of testing events. The actual construction sequence has required additional time and effort. Staff has reviewed the remaining work with Terracon, as well as the general contractor and the design engineer, and believes that the proposed change order will be sufficient to complete the project. There are sufficient funds available in the approved budget to cover the additional work. Therefore, it is the recommendation of the City Manager that the City Council adopt alternative number 1 as described above. ATTACHMENT(S): CO #1 PO 63770.pdf 2 3