HomeMy WebLinkAbout~Master - Resolution approving Change Order No. 8 with Woodruff Construction, of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 Project in the amount of $3,841.91RESOLUTION NO. 26-096
RESOLUTION APPROVING CHANGE ORDER NO. 8
ON CONTRACT WITH WOODRUFF CONSTRUCTION, OF AMES, IA,
FOR THE WATER POLLUTION CONTROL FACILITY
NUTRIENT REDUCTION MODIFICATIONS PHASE 1 PROJECT
FOR THE CITY OF AMES, IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper
on the above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames,
Iowa, that Change Order No. 8 in the amount of $3,841.91 on contract with Woodruff
Construction, of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction
Modifications Phase 1 Project be approved and adopted as attached hereto and made a
part hereof by this reference.
ADOPTED THIS 24th day of February, 2026.
_______________________________ _________________________________
Renee Hall, City Clerk John A. Haila, Mayor
Introduced by: Corrieri
Seconded by: Betcher
Voting aye: Beatty-Hansen, Betcher, Corrieri, Junck, Gartin, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 24th day of February, 2026.