Loading...
HomeMy WebLinkAboutA016 - Resolution approving preliminary plans and specifications for the 2025/26 Alley Pavement Improvement Program (Alley - South of Lincoln Way Between South Kellogg Ave and South Sherman Ave)ITEM #:18 DATE:02-10-26 DEPT:PW SUBJECT:2025/26 ALLEY PAVEMENT IMPROVEMENT PROGRAM (ALLEY - SOUTH OF LINCOLN WAY BETWEEN SOUTH KELLOGG AVENUE AND SOUTH SHERMAN AVENUE) COUNCIL ACTION FORM BACKGROUND: This program is to reconstruct existing paved alleys where the structural integrity of the existing pavement has diminished beyond repair. The project location is the alley south of Lincoln Way between South Kellogg Avenue and South Sherman Avenue. The current condition of the alley includes deteriorated concrete and poor drainage in the area. This project includes the replacement of the existing alley pavement with 7 inches of new concrete pavement. PUBLIC OUTREACH: Staff contacted impacted businesses and met on site with those that reached out about regarding staging, and access needs. Comments from these meetings were received and incorporated into the project. City staff has completed plans and specifications for this project with revenue and estimated expenses as follows: Description Available Revenue Estimated Expenses 2025/26 Alley Pavement Program (G.O. Bonds)$400,000 Construction (estimated) $144,621 Engineering/Administration 22,000 TOTAL $400,000 $166,621 ALTERNATIVES: 1. Approve plans and specifications for the 2025/26 Alley Pavement Improvement Program (Alley - South of Lincoln Way Between South Kellogg Ave and South Sherman Ave) project, setting March 4, 2026, as the bid due date and March 10, 2026, as the date of Public Hearing. 2. Direct staff to revise the project. CITY MANAGER'S RECOMMENDED ACTION: The condition of the existing pavement has deteriorated, and surface drainage is inadequate. The reconstruction of the pavement will provide improved drainage and access to businesses. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as described above. 1 ATTACHMENT(S): Downtown Alley - S. Lincoln.pdf 2 2025/26 Alley Pavement Improvement Program Open trenching Sanitary Force main on South side of East Lincoln Way Lift Station Single Lane Alternating Traffic North Side of intersection S 16TH ST S G R A N D A V E ¯Phase I Alley - (South of Lincoln Way - Between S. Kellogg Ave & S. Sherman Ave) S 16TH ST S G R A N D A V E 5TH ST 6TH ST DU F F A V E DO U G L A S A V E E 6TH ST E 5TH ST E LINCOLN WAY DA Y T O N A V E IN T E R S T A T E 3 5 S Alley LINCOLN WAY KE L L O G G A V E SH E R M A N A V E MA R K E T A V E CO M M E R C E A V E GILCHRIST ST S 2ND ST LINCOLN WAY S K E L L O G G A V E S S H E R M A N A V E 3