Loading...
HomeMy WebLinkAboutA022 - 2022/23 Concrete Pavement Improvements - (Brookridge Ave, Ridgewood Ave, Lee St, 9th St, Park Way, & Alley) ProjectITEM #:25 DATE:01-27-26 DEPT:PW SUBJECT:2022/23 CONCRETE PAVEMENT IMPROVEMENTS - (BROOKRIDGE AVE, RIDGEWOOD AVE, LEE ST, 9TH ST, PARK WAY, & ALLEY) COUNCIL ACTION FORM BACKGROUND: This annual program utilizes current repair and reconstruction techniques to improve concrete streets. These pavement improvements are needed to restore structural integrity, serviceability, and rideability. This project was located along Brookridge Avenue, Ridgewood Avenue, Lee Street, Park Way and 9th Street. This project included the removal and replacement of the existing street pavement, upgraded pedestrian crossing facilities, storm and sanitary sewer repairs, and replacement watermain along Ridgewood Avenue and 9th Street. On April 25, 2023, City Council awarded a contract to Shekar Engineering, P.L.C. of Des Moines, Iowa, in the amount of $4,203,260.58. One change order was administratively approved by staff in the amount of $24,507.97. Change Order No. 2 (this action), a deduction in the amount of $286,617.83, includes a reduction in the quantities for subgrade preparation, subgrade treatment, special backfill, connection to existing pipe structures, and asphalt pavement. These deduction occurred due to the project being bid as an alternate for concrete versus asphalt pavement surfacing. The cost for concrete was more cost effective and allowed for reduction in items related to not utilizing asphalt pavement. The balancing change order reflects the final field measured quantities during construction. Construction was completed in the amount of $3,941,150.72. Revenues and expenses associated with this program are as follows: Description Revenue Expenses 22/23 Concrete Improvements (G.O. Bonds)$3,600,000 22/23 Water System Improvements (Water Fund) 650,000 22/23 & 23/24 Alley Improvements (G.O. Bonds) 800,000 22/23 Sanitary Sewer Improvements (Sewer Funds) 400,000 Construction $4,203,260.58 Change Orders (Previously approved) 24,507.97 Change Order 2 (Balancing) - This Council Action -286,617.83 Final Construction Cost - This Council Action 3,941,150.72 WHKS Engineering 312,400.00 Contract Administration 400,000.00 TOTAL $5,450,000 $4,653,550.72 1 ALTERNATIVES: 1. Approve the following for the 2022/23 Concrete Pavement Improvements - (Brookridge Ave, Ridgewood Ave, Lee St, 9th St, Park Way, & Alley) project: a. Change Order No. 2, a deduction in the amount of $286,617.83. b. Accept the project as completed by Shekar Engineering, P.L.C. of Des Moines, Iowa, in the amount of $3,941,150.72. 2. Direct staff to pursue changes to the project. CITY MANAGER'S RECOMMENDED ACTION: The project has been completed in accordance with the approved plans and specifications. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as noted above. ATTACHMENT(S): Concrete Project Map.pdf Certification Letter 2022-23 Concrete Pavement Improvements (Brookridge).pdf 2 6TH ST 9TH ST 10TH ST 8TH ST GRAND AVE 7TH ST WILSON AVE NORTHWESTERN AVE HODGE AVE 11TH ST ROOSEVELT AVE CURTISS AVE HARDING AVE MARSTON AVE 2022/23 ConcretePavement Improvements ¯ Bridgwood Ave - (6th St to Ridgewood Ave)Ridgewood Ave - (6th St to 9th St)Lee St. - (Brookridge Ave to Ridgewood Ave)9th St. - (Brookridge Ave to Northwestern Ave)Park Way - (Brookridge Ave to Ridgewood Ave)Alley - (6th St to 9th St) Brook ridge Ave Ridgewood Ave Lee St 9th St Par k Way Alley 3 Smart Choice Public Works Department 515.239.5160 main 515 Clark Ave. P.O. Box 811 515.239.5404 fax Ames, IA 50010 www.CityofAmes.org January 22, 2026 Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Dear Mayor and Council Members: I hereby certify the 2022/23 Concrete Pavement Improvements (Brookridge Ave, Ridgewood Ave, Lee St, 9th St, Park Way, & Alley) project was completed in an acceptable manner by Shekar Engineering, P.L.C., of Des Moines, Iowa, in the amount of $3,941,150.72 and was inspected by the Public Works Department of the City of Ames, Iowa. Sincerely, Justin A. Clausen, PE, CPWP-M Public Works Director JAC/lbc cc: City Clerk, Finance, Contractor, Administrative Services, Project File 4