Loading...
HomeMy WebLinkAboutA007 - Motion accepting the Fitch Family Indoor Aquatic Center Monthly ReportTo:Mayor and City Council From:Keith Abraham, Parks and Recreation Director Date:January 27, 2026 Subject:Fitch Family Indoor Aquatic Center Monthly Update Item No. 9 MEMO PROJECT UPDATE: In accordance with a previous directive, staff is required to keep the City Council informed of the construction status of the Fitch Family Indoor Aquatic Center (FFIAC) and will provide a written update at Council's second meeting of each month. Additionally, staff, along with representatives from Story Construction and RDG Planning and Design, will provide an in-person update once per quarter (January, April, July, & October). If anything occurs during the project that requires Council action, staff will present this in a timely manner. In accordance with this directive, the City's Construction Manager for the project, Story Construction, has provided a Project Status Report (Attachment A). Story Construction and RDG Planning and Design are 97% complete with reviewing shop drawings and submittals. This activity will continue until 100% complete. There are several items that City Council needs to be updated on regarding the project. Precast Concrete Panels Staff continues to work with Story and RDG on gathering information related to staining the precast concrete panels and is planning on providing an update to City Council in February. Polished Concrete Floors The concrete floors in the lobby and the hallway to the locker rooms were specified to be a polished Class B finish which is best described as a "salt & pepper" look. Staff is not happy with the inconsistencies, imperfections, and the overall appearance of these areas. Thus, staff has directed the contractor to go to a Class C finish which will look similar to a terrazzo floor. A Construction Parks and Recreation 515.239.5105 main 515.239.5142 fax 515 Clark Ave. P.O. Box 811 Ames, IA 50010 www.CityofAmes.org 1 Change Directive (CCD) has been issued to keep moving forward with the project. The polishing work will begin on February 9 as that is the first opening the subcontractor had available. The initial cost estimate to do this work is $34,210. Staff is in discussion with Story and the contractor regarding who is to pay for this change. Additionally, there is an colored accent band in the lobby that was rejected. The contractor has removed the accent band and replaced it with integral colored concrete. This has been done at the contractor's expense. Substantial Completion Dates The revised substantial completion dates are as follows: February 20 - Non-natatorium spaces February 27 - Natatorium spaces Please note that the glazing for the southeast portion of the natatorium has a 10- week lead time and will need to be installed in late March or early April. Staff is working with Story on ways to expedite the procurement of the glazing and/or temporary fixes. State Inspection This is scheduled for March 3 and will encompass all components related to the operation of the aquatic areas. In preparation for this, Story, RDG, and staff are reviewing the inspection checklist to ensure the facility is ready to go. Soil and Ground Water Contamination It should be noted there have been no contaminated soils or groundwater found to date. CHANGE ORDER SUMMARY: There were zero change orders since the last report, and the changes thus far on the project are shown on the change order log (Attachment B). To date, construction change orders for the project total $396,167, or 18.87% of the contingency budget. The contingency for this project is $2.1 million with a current balance of $1,703,833. There is also $1 million set aside for mitigation of contamination issues, which has not been used at this time. ATTACHMENT(S): Attachment A - 2026-01 Council Update.pdf Attachment B - Change Order Log - 1-27-26.pdf Parks and Recreation 515.239.5105 main 515.239.5142 fax 515 Clark Ave. P.O. Box 811 Ames, IA 50010 www.CityofAmes.org 2 Page 1 of 3 Fitch Family Indoor Aquatic Center Monthly Project Status Report January 2026 *Natatorium: Wellness, Recreation and Lap Pools *Non-Natatorium: All supporting rooms outside of the Natatorium including Mechanical, Loading, Locker Rooms, Offices, Main Lobby & Check-In, and the Alternate Walk Path PROGRESS THIS PAST MONTH: 1. All pool and pool deck concrete pours were completed. 2. Wellness and Lap Pool painting was completed. 3. Rec Pool tile was started. 4. The water slide was installed. 5. Natatorium painting and lighting has started. 6. Lockers, doors and toilet partitions and accessories were installed. 7. Resilient athletic flooring was installed at the Walk Path and Multi-Purpose Rooms. 8. Casework was installed, minus the Lobby Check-In desk. 9. Interior storefront framing and glazing continued. 10. Acoustical ceiling tile was installed. 11. Overhead coiling door was installed at Maintenance. 12. Low voltage wiring for fire alarm, cameras and audio/visual started. 13. HVAC Controls wiring started. 14. Exterior curtain wall framing and glazing was installed at Natatorium southeast. 15. Exterior architectural metal panels were installed. 16. Rooftop mechanical louver screens were installed. 17. Parking lot lighting was installed. 18. Mechanical, electrical and plumbing installations continued in the Aquatic and Electrical Mechanical Rooms. 19. Coordination meetings continued for mechanical equipment startup with the affected Bid Package Contractors. Various mechanical equipment was started up. 20. Building Envelope Consult inspections were completed for vapor barrier and pool water stop, while inspections continued for curtain wall glazing and precast penetrations. 21. Special inspections and testing of concrete was completed. 22. Design team site visits and field observations continued. 23. Requests for Information continued to be processed between the Bid Package Contractors, Story Construction, and RDG Planning & Design. 3 Page 2 of 3 WORK PLANNED FOR NEXT MONTH: 1. Rec Pool tile and painting will be completed. 2. Pool accessories install will begin. 3. Casework installation will be completed. 4. Lighting fixtures, Data Devices, Cameras and Audio/Visual equipment installations will continue. 5. Interior storefront doors, glazing and caulking will be completed. 6. Exterior curtain wall framing will be completed at Natatorium southwest. Final Natatorium glazing will be installed in March. 7. Exterior roof edge metals will be completed. 8. Final cleaning will be completed. 9. Story Construction office and scheduling trailers will be removed from the site. 10. Final Plumbing and Electrical will continue in the Aquatic and Electrical Mechanical Rooms. 11. Coordination meetings will continue for mechanical equipment startup with the affected Bid Package Contractors and remaining mechanical equipment will be started up. 12. MEP Commissioning will begin. 13. Owner Operations Introductory meetings will continue. 14. Building Envelope Consult inspections will continue for curtain wall glazing and sealing exterior wall penetrations. SCHEDULE SUMMARY: Construction Substantial Completion Date: Non-Natatorium: February 20, 2026 Natatorium: February 27, 2026 PROJECT PHOTOS: [Next page] 4 Page 3 of 3 5 Contractor Change Order #Description Amount Balance Beginning Contingency Balance $ 2,100,000 All Star Concrete 1 Precast Enbeds Install Change Contracts $ 10,010 $ 2,089,990 All Star Concrete 2 Increase Concrete Thickness in Maintenance Area $ 7,029 $ 2,082,961 Core Construction 1 IDPH Permit Review, Precast Panel Joint Mods, Mechanical Louver Mods, Steel Lintel, Precast Enbeds Install Change Contracts $ 22,065 $ 2,060,896 Core Construction 2 Misc. Structural Revisions & South Elevation Glazing Revised $ 3,979 $ 2,056,917 Core Construction 3 Geared Trolley and Hoist $ (2,952) $ 2,059,869 Core Construction 4 Sink Countertop Brackets $ (1,203) $ 2,061,072 Core Construction 5 Channel Support $ 3,739 $ 2,057,333 Core Construction 6 Hoist Beam End Stop $ 1,356 $ 2,055,977 Forrest & Associates 1 Channel Support $ 1,163 $ 2,054,814 Lansink Construction 1 Wet Room Door Change, Multipurpose Room Cubbies $ 42,129 $ 2,012,685 Lansink Construction 2 Door 115A Change to FRP $ 2,858 $ 2,009,827 Lansink Construction 3 Interior Finishes $ 3,021 $ 2,006,806 Lansink Construction 4 Check-In Standing Desk $ 3,995 $ 2,002,811 Lansink Construction 5 Sink Countertop Brackets $ 1,639 $ 2,001,172 Lansink Construction 6 Wood Blocking $ 752 $ 2,000,420 Lansink Construction 7 Waterproof Exterior - Aquatic Mechanical $ 1,167 $ 1,999,253 Lansink Construction 8 Converting Room 108 Shower to a Roll In Shower $ 2,653 $ 1,996,600 Lansink Construction 9 Donor Wall $ 33,224 $ 1,963,376 Lansink Construction 10 Additional Changing Room Tile $ 2,597 $ 1,960,779 Central States Roofing 1 IDPH Permit Review, Mechanical Louver Mods $ 1,647 $ 1,959,132 Central States Roofing 2 Roofing Over Hollow Core $ 5,116 $ 1,954,016 Orning Glass Company 1 Wet Room Door Changes $ (3,823) $ 1,957,839 Orning Glass Company 2 Window Frit Revisions $ 1,743 $ 1,956,096 Orning Glass Company 3 Auto Door Operators $ 9,757 $ 1,946,339 Orning Glass Company 4 Entry Way Column Metal Wrap $ 438 $ 1,945,901 Hilsabek Schacht 1 Wet Room Door Change $ - $ 1,945,901 Hilsabek Schacht 2 Door 115A Change to FRP $ - $ 1,945,901 Hilsabek Schacht 3 Donor Wall Drywall $ 3,557 $ 1,942,344 Hilsabek Schacht 4 Site Signage $ (350) $ 1,942,694 Hilsabek Schacht 5 Precast Pocket Covers $ 2,598 $ 1,940,096 Hilsabek Schacht 6 Omit Painting - Mechanical Rooms $ (3,280) $ 1,943,376 Hilsabek Schacht 7 Close Off Top Of South Wellness Precast $ 3,808 $ 1,939,568 Hilsabek Schacht 8 Wellness Precast Vertical Joints & Frame Top of Masonry $ 3,656 $ 1,935,912 Hilsabek Schacht 9 Curtain Wall 12 & Metal Panels $ 599 $ 1,935,313 Sande Construction 1 IDPH Permit Review Updates $ 1,370 $ 1,933,943 Sande Construction 2 CO2 Tank Distribution Piping $ 2,692 $ 1,931,251 Sande Construction 3 Sump Pump Rail System and Backwash Pit Grate $ 4,744 $ 1,926,507 Midwest Fire Sprinkler 1 Omit Sprinkler Heads at Main Entry Exterior $ (700) $ 1,927,207 Brockway Mechanical 1 Hydronic Pumps Flow Update $ (2,320) $ 1,929,527 Brockway Mechanical 2 IDPH Permit Review Updates, 6" Storm Drain Relocation, Mechanical Louver Mods, Glycol Feed Dual Pump $ 38,702 $ 1,890,825 Brockway Mechanical 3 State Requirements $ 12,033 $ 1,878,792 Brockway Mechanical 4 Pool Trench Drain Float Alarm $ 2,318 $ 1,876,474 Brockway Mechanical 5 Converting Room 108 Shower to a Roll In Shower $ 7,180 $ 1,869,294 Van Maanen Electric 1 IDPH Permit Review Updates $ 21,953 $ 1,847,341 Van Maanen Electric 2 Transformer Relocate $ 14,237 $ 1,833,104 Van Maanen Electric 3 Light Fixture SWA Dimming $ 4,679 $ 1,828,425 Van Maanen Electric 4 Exterior Signage Lighting Controls $ 1,007 $ 1,827,418 Van Maanen Electric 5 Pool Trench Drain Float Alarm $ 1,356 $ 1,826,062 Van Maanen Electric 6 Wiring Auto Door Operators in Corridor 108 $ 959 $ 1,825,103 Van Maanen Electric 7 ICN Connection $ 9,040 $ 1,816,063 Van Maanen Electric 8 New Light Fixture for Vestibule & Exterior $ 2,411 $ 1,813,652 Van Maanen Electric 9 Change TV Mounting Heights $ 1,049 $ 1,812,603 Con-Struct 1 Water Service Disconnect $ 7,747 $ 1,804,856 Con-Struct 2 Building Rubble Removal $ 45,419 $ 1,759,437 Con-Struct 3 Planting Revisions $ (737) $ 1,760,174 Con-Struct 4 Curb Strip Restoration $ 9,702 $ 1,750,472 Con-Struct 5 Southeast Planting Revisions & Dormant Seed Matting $ 2,575 $ 1,747,897 Iowa Pipe & Grading 1 Storm & Existing Water Utility Conflict & Sanitary Tie in at N. 2nd Ave $ 14,518 $ 1,733,379 Lakeside 1 Site Signage $ 2,120 $ 1,731,259 Lakeside 2 CyRide Concrete Pad $ 296 $ 1,730,963 Lakeside 3 Replace Curb & Gutter on Oak Avenue $ 27,130 $ 1,703,833 Totals / Current Balance $ 396,167 $ 1,703,833 FITCH FAMILY INDOOR AQUATIC CENTER CHANGE ORDER LOG (As of 1/27/26) Highlighted Rows Indicate New Change Orders Since the Last Update 6