Loading...
HomeMy WebLinkAbout~Master - Resolution approving Change Order No. 2 for 2022/23 Concrete Pavement Improvements (Brookridge Ave, Ridgewood Ave, Lee St, 9th St, Park Way, & Alley) ProjectRESOLUTION NO. 26-055 RESOLUTION APPROVING CHANGE ORDER NO. 2 ON CONTRACT WITH SHEKAR ENGINEERING, P.L.C., OF DES MOINES, IA, FOR THE 2022/23 CONCRETE PAVEMENT IMPROVEMENTS (BROOKRIDGE AVE, RIDGEWOOD AVE, LEE ST, 9TH ST, PARK WAY, & ALLEY) PROJECT FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 2 for a deduction in the amount of $286,617.83 on contract with Shekar Engineering, P.L.C., of Des Moines, IA, for the 2022/23 Concrete Pavement Improvements - (Brookridge Ave, Ridgewood Ave, Lee St, 9th St, Park Way, & Alley) project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 27th day of January, 2026. _______________________________ _________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Corrieri Seconded by: Beatty-Hansen Voting aye: Beatty-Hansen, Betcher, Corrieri, Junck, Gartin, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 27th day of January, 2026.