HomeMy WebLinkAboutA001 - Council Action Form dated January 13, 2026ITEM #:14 DATE:01-13-26 DEPT:PW SUBJECT:SANITARY SEWER SYSTEM IMPROVEMENTS PROGRAM (BASIN 11) COUNCIL ACTION FORM BACKGROUND: This is the annual program for rehabilitation/reconstruction of deficient sanitary sewers and deteriorated manholes at various locations throughout the city. The goal of this program is to identify and remove major sources of inflow/infiltration (I/I) as a means of lowering the peak wet weather flow at the treatment plant. By eliminating I/I in these sewer mains, the sanitary sewer system will also regain needed capacity. This project includes the rehabilitation of sanitary sewer segments and manholes within Basin 11, which is located on the east side of Ames. WHKS & Co. of Ames, Iowa, has completed the plans and specifications for the work. The revenues and expenses associated with this program are estimated as follows: Description Available Revenue Estimated Expenses State Revolving Fund (SRF)$2,500,000 Construction (est.) $2,100,000 Engineering/Administration (est.) $ 150,000 TOTAL $2,500,000 $2,250,000 The debt service payments in conjunction with this State loan will be paid from the operating expenses from the Sanitary Sewer System Improvements program. ALTERNATIVES: 1. Approve the plans and specifications for the Sanitary Sewer System Improvements Program (Basin 11) project, setting February 18, 2026, as the bid due date and February 24, 2026, as the date of Public Hearing. 2. Direct staff to pursue changes to the project. 3. Do not proceed with this project at this time. CITY MANAGER'S RECOMMENDED ACTION: This project will improve the sanitary sewer system by restoring structural integrity of deteriorating sewer segments and by removing inflow and infiltration to regain valuable capacity within the system. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as described above. 1 ATTACHMENT(S): Basin 11.pdf Cost_Sharing_Agreement__Manatt_s__E_13th.pdf 2 US Highway 30 N 500TH AVE SAND HILL TRL S 500TH AVE NORTH DAKOTA AVE 240TH ST 270TH ST 13TH ST 215TH ST 200TH ST 265TH ST 24TH ST S 530TH AVE ZUMWALT STATION RD C I-35 HWY LINCOLN WAY TIMB RD SE 16TH ST STAGECOACH RD S US HIGHWAY 69 KEN MARIL RD DAYTON AVE STATE AVE E 13TH ST GEORGE W CA RV ER AVE BE A C H A V E 245TH ST ONTARIO ST 276TH ST E RIVERSIDE RD S RIVEDR PULLMAN ST ONION CREEK LN Access to city wells OLD BLOOMINGTON RD ADAMS ST AIRPORT RD 560TH AVE 250TH ST AVE 260TH ST 600TH A VE 11 6 2 1 5 13 8 7 9 12 4 3 10 15 14 µ 0 4,200 8,4002,100 Feet City Limits Roads Sanitary Study Basins City of Ames Sanitary System Evaluation Study 1 inch = 4,200 feet Project Locations: Basin 11 3 4 5 6 Passed and approved on ___________ . 2025, by Resolution No. 2_- _ __ _ adopted by the City Council of the City of Ames, Iowa. CITY OF AMES, IOWA B y: John A. Haila, Mayor Attest: Renee Hall, City Clerk ST ATE OF IOWA, COUNTY OF STORY, SS.: This instrument was acknowledged before me on _____ _ _ ___ , 202_, by John A.Haila and Renee Hall, as Mayor and City Clerk, respectively, of the City of Ames, Iowa. NOT ARY PUBLIC 7 8 Preliminary Cost Opinion CIPP of 18" Sanitary Sewer - 35' cover on SAGM 1332 and 35' of cover and stockpiling on SAGM 1333 and SAGM 1334 On Manatt's property Item Units Quantity Unit Cost City Share Manatts Share SAGM 1332 - CIPP Liner 18" x 15 mm LF 275 120.00$ 26,400.00$ MH 1287 - City Share (100%)Each 1 40,000.00$ 40,000.00$ MH 1287 - Manatts Share Each 1 40,000.00$ percentages based on unit pricing from original est.LF 354 200.00$ 35,400.00$ 35,400.00$ MH 1286 - City Share 100%Each 1 40,000.00$ 40,000.00$ SAGM 1334 (ravine fill and stockpile - Manatts UV 18" x 10 mm ) Manatt's 40% / City 60% percentages based on unit pricing from original est.LF 184 200.00$ 25,760.00$ 11,040.00$ MH 1285 (100% City Cost - Manhole is already to approx. 937 elevation)Each 1 40,000.00$ 40,000.00$ Heavy Cleaning SAGM 1332, 1333, 1334.LF 825 20.00$ 16,500.00$ Point Repar SAGM 1334 LF 20 500.00$ 10,000.00$ Mobilization for UV liner Contractor. (manatts only City mob part of another bid)LS 1 30,000.00$ 30,000.00$ Bypass pumping LS 1 30,000.00$ 30,000.00$ Temporary manhole mods to access the pipes LS 1 15,000.00$ 15,000.00$ Engineering and Permitting LS 1 15,000.00$ 15,000.00$ 279,060.00$ 91,440.00$ 27,906.00$ 9,144.00$ 407,550.00$ The City of Ames and Mannatts met on 9/22/2023 to discuss the lining project through the manatts property Below is the direction given to WHKS to complete the estimate above to assign Costs to the City and Manatts. MH 1583 - any work is paid for by the city SAGM 1332 - City to pay 100% of Alt. 1 which is a 15mm liner (Easement agreement must be in place about no stockpiling) MH 1287 - City responsible for replacement cost up to elevation 913.65 and the cost of a new casting Manatt's responsible for the cost of the mahole from 913.65 to 937.00 SAGM 1333 - Manatts wants to fill ravine and stockpile over the top. Mannats to pay the difference between Base and Alt. 2 Base price was $100 per foot and Alt. 2 was $200 per lineal foot. MH 1286 - City responsilbe for replacement up to elevation 923.00 and the cost of a new casting Manatt's responsible for the cost of the mahole from 923.0 to 937.00 SAGM 1334 - Manatts wants to stockpile over the top. The fill is already at approximately 937.0 elevation Below are additional thoughts WHKS make while doing the estimate and deciding percentages of responsibility. The city wouldn't replace the manholes they would only maintain the existing so Manatts should have 50% MH 1583 and SAGM 1332 are shown and discussed to make it appear the city is paying a higher percentage of cost. SAGM 1332 is also shown because of the easment and not allowing for stockpiling over the top of that sewer. Construction Total Contingency Sub-Totals Total Project Cost 9