BACKGROUND:
This is the annual program for rehabilitation/reconstruction of deficient sanitary sewers and
deteriorated manholes at various locations throughout the city. The goal of this program is to
identify and remove major sources of inflow/infiltration (I/I) as a means of lowering the peak
wet weather flow at the treatment plant. By eliminating I/I in these sewer mains, the sanitary
sewer system will also regain needed capacity.
This project includes the rehabilitation of sanitary sewer segments and manholes within Basin
11, which is located on the east side of Ames. WHKS & Co. of Ames, Iowa, has completed
the plans and specifications for the work. The revenues and expenses associated with this
program are estimated as follows:
Description Available Revenue Estimated Expenses
State Revolving Fund (SRF)$2,500,000
Construction (est.) $2,100,000
Engineering/Administration (est.) $ 150,000
TOTAL $2,500,000 $2,250,000
The debt service payments in conjunction with this State loan will be paid from the
operating expenses from the Sanitary Sewer System Improvements program.
ALTERNATIVES:
1. Approve the plans and specifications for the Sanitary Sewer System Improvements
Program (Basin 11) project, setting February 18, 2026, as the bid due date and February
24, 2026, as the date of Public Hearing.
2. Direct staff to pursue changes to the project.
3. Do not proceed with this project at this time.
CITY MANAGER'S RECOMMENDED ACTION:
This project will improve the sanitary sewer system by restoring structural integrity of
deteriorating sewer segments and by removing inflow and infiltration to regain valuable
capacity within the system. Therefore, it is the recommendation of the City Manager that the
City Council adopt Alternative No. 1, as described above.
1
ATTACHMENT(S):
Basin 11.pdf
Cost_Sharing_Agreement__Manatt_s__E_13th.pdf
2
US Highway 30
N 500TH AVE
SAND HILL TRL
S 500TH AVE
NORTH DAKOTA AVE
240TH ST
270TH ST
13TH ST
215TH ST
200TH ST
265TH ST
24TH ST
S 530TH AVE
ZUMWALT STATION RD
C
I-35 HWY
LINCOLN WAY
TIMB RD
SE 16TH ST
STAGECOACH RD
S US HIGHWAY 69
KEN MARIL RD
DAYTON AVE
STATE AVE
E 13TH ST
GEORGE W CA
RV
ER AVE
BE
A
C
H
A
V
E
245TH ST
ONTARIO ST
276TH ST
E RIVERSIDE RD
S RIVEDR
PULLMAN ST
ONION CREEK LN
Access to city wells
OLD BLOOMINGTON RD
ADAMS ST
AIRPORT RD
560TH AVE
250TH ST
AVE
260TH ST
600TH A
VE
11
6
2
1
5
13
8
7
9
12
4
3
10
15
14
µ
0 4,200 8,4002,100
Feet
City Limits
Roads
Sanitary Study Basins
City of Ames
Sanitary System Evaluation Study
1 inch = 4,200 feet Project Locations: Basin 11
3
4
5
6
Passed and approved on ___________ . 2025, by Resolution No. 2_-
_ __ _ adopted by the City Council of the City of Ames, Iowa.
CITY OF AMES, IOWA
B y:
John A. Haila, Mayor
Attest:
Renee Hall, City Clerk
ST ATE OF IOWA, COUNTY OF STORY, SS.:
This instrument was acknowledged before me on _____ _ _ ___ , 202_, by John
A.Haila and Renee Hall, as Mayor and City Clerk, respectively, of the City of Ames, Iowa.
NOT ARY PUBLIC
7
8
Preliminary Cost Opinion
CIPP of 18" Sanitary Sewer - 35' cover on SAGM 1332 and 35' of cover and stockpiling on SAGM 1333 and SAGM 1334
On Manatt's property
Item Units Quantity Unit Cost City Share Manatts Share
SAGM 1332 - CIPP Liner 18" x 15 mm LF 275 120.00$ 26,400.00$
MH 1287 - City Share (100%)Each 1 40,000.00$ 40,000.00$
MH 1287 - Manatts Share Each 1 40,000.00$
percentages based on unit pricing from original est.LF 354 200.00$ 35,400.00$ 35,400.00$
MH 1286 - City Share 100%Each 1 40,000.00$ 40,000.00$
SAGM 1334 (ravine fill and stockpile - Manatts UV 18" x 10 mm ) Manatt's 40% / City
60% percentages based on unit pricing from original est.LF 184 200.00$ 25,760.00$ 11,040.00$
MH 1285 (100% City Cost - Manhole is already to approx. 937 elevation)Each 1 40,000.00$ 40,000.00$
Heavy Cleaning SAGM 1332, 1333, 1334.LF 825 20.00$ 16,500.00$
Point Repar SAGM 1334 LF 20 500.00$ 10,000.00$
Mobilization for UV liner Contractor. (manatts only City mob part of another bid)LS 1 30,000.00$ 30,000.00$
Bypass pumping LS 1 30,000.00$ 30,000.00$
Temporary manhole mods to access the pipes LS 1 15,000.00$ 15,000.00$
Engineering and Permitting LS 1 15,000.00$ 15,000.00$
279,060.00$ 91,440.00$
27,906.00$ 9,144.00$
407,550.00$
The City of Ames and Mannatts met on 9/22/2023 to discuss the lining project through the manatts property
Below is the direction given to WHKS to complete the estimate above to assign Costs to the City and Manatts.
MH 1583 - any work is paid for by the city
SAGM 1332 - City to pay 100% of Alt. 1 which is a 15mm liner (Easement agreement must be in place about no stockpiling)
MH 1287 - City responsible for replacement cost up to elevation 913.65 and the cost of a new casting
Manatt's responsible for the cost of the mahole from 913.65 to 937.00
SAGM 1333 - Manatts wants to fill ravine and stockpile over the top. Mannats to pay the difference between Base and Alt. 2
Base price was $100 per foot and Alt. 2 was $200 per lineal foot.
MH 1286 - City responsilbe for replacement up to elevation 923.00 and the cost of a new casting
Manatt's responsible for the cost of the mahole from 923.0 to 937.00
SAGM 1334 - Manatts wants to stockpile over the top. The fill is already at approximately 937.0 elevation
Below are additional thoughts WHKS make while doing the estimate and deciding percentages of responsibility.
The city wouldn't replace the manholes they would only maintain the existing so Manatts should have 50%
MH 1583 and SAGM 1332 are shown and discussed to make it appear the city is paying a higher percentage of cost.
SAGM 1332 is also shown because of the easment and not allowing for stockpiling over the top of that sewer.
Construction Total
Contingency
Sub-Totals
Total Project Cost