Loading...
HomeMy WebLinkAboutA016 - Resolution waiving Purchasing Policy requirement for competitive bidding and awarding a contract to Carbon Day EV Charging, of Wheeling, IL, for the purchase of two Level 3 EV chargersITEM #:18 DATE:12-16-25 DEPT:ELEC SUBJECT:LEVEL 3 ELECTRIC VEHICLE CHARGING STATIONS COUNCIL ACTION FORM BACKGROUND: Ames Electric Services has standardized the City-owned electric vehicle (EV) chargers by utilizing ChargePoint equipment to ensure consistency in operation, maintenance, and r e p o r ti n g. Electric Services currently manages 11 total ChargePoint electric vehicle charging stations with a total of 20 ports throughout Ames. To support growing EV adoption and improve charging accessibility, the department has decided to add two additional level 3 charging stations near the intersection of Grand Ave and Lincoln Way, located in the Hy-Vee Fast & Fresh NW parking lot. Staff has identified this location because of its high visibility, proximity to downtown, and support of the local shopping center. All stakeholders were involved in the planning process and approved the project. This charger will charge 25% faster than the City's existing Level 3 charger located at Dayton and Highway 30, and 10 times faster than the City's existing Level 2 chargers. Staff is recommending purchasing directly from Carbon Day, a long-time partner of ChargePoint and the City's station liaison for charger repair and support. Maintaining consistency with existing charging stations will continue to allow for prompt station service, accurate reporting, and ease of use. The costs for this project are shown in Table 1, below: Table 1: Cost Breakdown Description QTY Price Per Station Total 80 kW 1 CCS1-250A and 1 NACS 250A Cable 2 $37,810 $75,620 5-year CPE280 Prepaid Enterprise Cloud Plan 2 $5,400 $10,800 On-Site Validation of CPE280 Station 2 $1,230 $2,460 CPE280 5-year Parts and Labor Warranty 2 $10,450 $20,900 Concrete Mounting Template 2 $0 $0 Initial Station Activation and Configuration 2 $249 $498 Lug Nut for Mounting of Station 2 $49 $98 Shipping 2 $1,500 $3,000 Total Tax $7,936.32 Total Cost Before Installation $121,312.32 Funds for this project will come from the Electric Vehicle Infrastructure Capital Improvements Program, where there is $356,459 available for these chargers. 1 ALTERNATIVES: 1. Waive the Purchasing Policies and Procedures requirement for formal bidding procedures and award a contract to Carbon Day EV Charging , Wheeling, Illinois, for the purchase of 2 - Level 3 EV charging stations in the amount of $121,312.32. 2. Delay the purchase of the chargers and solicit bids from other companies. CITY MANAGER'S RECOMMENDED ACTION: As part of the Climate Action Plan, Electric Services supports the conversion of internal combustion engine vehicles to electric vehicles. A primary concern of potential EV customers is to ability to charge quickly and affordably at convenient locations. A Level 3 charger at the corner of Lincoln Way and Grand meets all those requirements. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as stated above. ATTACHMENT(S): City of Ames Sourcewell 04221-CPI Quote CPE280 With Tax X 2 12.4.2025.pdf 2 QUOTE Mr. Layne Fober 502 Carroll Ave Ames, IA 50010 515-239-5177 Reference: The City of Ames CPE280 DC Fast Charging Station 80 kW W/Commissioning and 5 Year Prepaid Enterprise Cloud and Assure Plus Tax X 2 QTY Price Per Station Total Price (List $39,800) 2 $37,810 $75,620 2 $5,400 $10,800 2 $1,230 $2,460 2 $10,450 $20,900 2 $0 $0 2 $249 $498 2 $49 $98 2 $1,500 $3,000 $7,936.32 $121,312.32 Signature Date Rob Spatz - 518-645-6733 - rob.spatz@carbondayevcharging.com - 163 S. Wheeling Rd. - Wheeling, IL 60090 Visit Our Website: https://carbondayevcharging.com/ City of Ames NA013543 layne.fober@cityofames.org On Site Validation of CPE280 Station Tax Initial Station Activation and ConfigurationCPSUPPORT-ACTIVE Amount Due Total cost before installation Ship to: Lug Nut For Mounting of Station Shipping and Handling Shipping and Handling CPE280 5 Year Parts and Labor Warranty CPE280-CMT-IMPERIAL Concrete Mounting Template December 4, 2025 5 Year CPE280 Prepaid Enterprise Cloud Plan CPE280-ASSURE-5 Description ChargePoint CPE280-800-NA-3A1S1-3A4S1 80 KW 1 CCS1-250A and 1 NACS 250A Cable Model Number CPCLD-ENTERPRISE-DC-5 CPE280-Commissioning CPE280-Dual Cord DC 80KW Charger with Combo and NACS connectors 5 Years Labor and Parts Warranty 3 Initial Station Activation and Configuration Service includes activation of cloud services and configuration of radio groups, connections, access control, visibility control, pricing, reports and alerts. $249 Enterprise Cloud Plan available in prepay options: Annual fee includes: Secure network connection, station inventory, 24-7 Driver support, Host Support, Session Data and Analytics Fleet Vehicle Management and Integration, Fleet access control, Valet dashboard. Time of Use-varying Power Management (Circuit, panel, site sharing), scheduled charging, Driver access control, Pricing and automatic funds collection, Waitlist, Videos, Meter data and advanced analytics, Building energy management system API, Real time DC dynamic power management Occupancy detection, Predictive maintenance and diagnostics. 1 year $1,200 2 years $2,340 3 years $3,420 4 years $4,440 5 years $5,400 CPE280-Commissioning.$1,230 On-Site Validation of cellular coverage, electrical capacity, transformers, panels, breakers, wiring and station installation meets all ChargePoint published requirements. On station activation and assist ChargePoint to complete final activation. Assure Warranty optional extended Labor and Parts Warranty - Commission required. 1 year $2,610 2 years $4,980 3 years $7,050 4 years $8,880 5 years $10,450 ** Other Standard Terms and Conditions Invoice Terms: 50% due upon placement of order and balance due 30 days after shipment of product. Issue payment to CD LLC ChargePoint 2 year part warranty will be between purchaser and ChargePoint. Cloud and Assure plans start upon station activation or 90 day's after ship date, whichever is first. Prices are confidential and expire: Rob Spatz - 518-645-6733 - rob.spatz@carbondayevcharging.com - 163 S. Wheeling Rd. - Wheeling, IL 60090 Visit Our Website: https://carbondayevcharging.com/ January 3, 2026 4