Loading...
HomeMy WebLinkAboutA019 - 2023/24 Asphalt Street Pavement Improvements Program #2 (E 7th St, N Riverside Dr)ITEM #:19 DATE:11-18-25 DEPT:PW SUBJECT:2023/24 ASPHALT STREET PAVEMENT IMPROVEMENTS PROGRAM #2 (E 7TH ST, N RIVERSIDE DR) COUNCIL ACTION FORM BACKGROUND: This project was located on North Riverside Drive (Lincoln Way to North 3rd Street) and East 7th Street (Crawford Avenue to the east end). The scope included new concrete pavement for North Riverside Drive and a full pavement reconstruction of East 7th Street, which involved sewer structure work and spot repairs of existing sewer pipe. On January 23, 2024, the City Council awarded the 2023/24 Asphalt Street Pavement Improvements Program No. 2 (East 7th Street, North Riverside Drive) project to Con-Struct, Inc., of Ames, Iowa, in the amount of $706,554.20. One change order was previously approved in accordance with purchasing policy: Change Order No. 1, in the amount of $39,400, was approved by the City Manager's Office. This change order covered additional sanitary pipe and service connections due to deteriorated conditions after excavations on the east end of East 7th Street. A storm sewer structure also required additional modification due to existing water main conflicts. Change Order No. 2 (this Council action) is in the amount of $42,128.41. This change reflects the final field measurements of the project, as well as sewer structure modifications resulting from conflicts with the City's raw water line and gas mains in the intersection of East 7th Street and Crawford Avenue. Construction was completed in the amount of $788,082.61. Engineering and contract administration expenses were $11 6 ,0 0 0 , bringing the overall project cost to $904,082.61. Revenue and expenses associated with this project are as follows: Funding Source Revenue Expenses 2023-24 Asphalt Street Program $900,000 Sanitary Sewer Funds 27,000 Original Contract $706,554.20 Change Order 1 39,400.00 Change Order 2 (this action) 42,128.41 Final Contract Amount $788,082.61 Engineering/Administration 116,000.00 Total $927,000 $904,082.61 Remaining funding will be transferred to an unobligated account and utilized for future street program improvements. 1 ALTERNATIVES: 1. Approve the following: a. Approve Change Order No. 2 to Con-Struct, Inc., of Ames, Iowa, for the 2023/24 Asphalt Street Pavement Improvements Program #2 (E 7th St, N Riverside Dr) in the amount of $42,128.41. b. Accept the 2023/24 Asphalt Street Pavement Improvements Program #2 (E 7th St, N Riverside Dr) as completed by Con-Struct, Inc, of Ames, IA, in the amount of $788,082.61. 2. Direct staff to pursue modifications to the project. CITY MANAGER'S RECOMMENDED ACTION: This project has been completed in accordance with the approved plans and specifications. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1 a-b, as noted above. ATTACHMENT(S): Certification Letter 23-24 Asphalt St Pavement Improvements ( E 7th - N Riverside).pdf 2 Smart Choice Public Works Department 515.239.5160 main 515 Clark Ave. P.O. Box 811 515.239.5404 fax Ames, IA 50010 www.CityofAmes.org November 12, 2025 Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Dear Mayor and Council Members: I hereby certify the 2023/24 Asphalt Street Pavement Improvements (E 7th Street, N Riverside Drive) project was completed in an acceptable manner by Con-Struct Inc., of Ames, Iowa, in the amount of $788,082.61 and was inspected by the Public Works Department of the City of Ames, Iowa. Sincerely, Justin A. Clausen, PE, CPWP-M Public Works Director JAC/lbc cc: City Clerk, Finance, Contractor, Administrative Services, Project File 3