PROJECT UPDATE:
In accordance with a previous directive, staff is required to keep the City Council
informed of the construction status of the Fitch Family Indoor Aquatic Center
(FFIAC) and will provide a written update at Council's second meeting of each
month.
Additionally, staff, along with representatives from Story Construction and RDG
Planning and Design, will provide an in-person update once per quarter (January,
April, July, & October). If anything occurs during the project that requires Council
action, staff will present this in a timely manner.
In accordance with this directive, the City's Construction Manager for the project,
Story Construction, has provided a Project Status Report (Attachment A). Story
Construction and RDG Planning and Design are 97% complete with reviewing
shop drawings and submittals. This activity will continue until 100% complete.
Staff is still gathering information related to the inconsistent appearance of
the precast concrete panels and is planning on providing an update to City
Council in December.
It should be noted there have been no contaminated soils or groundwater found
to date.
City Clerk's Office 515.239.5105 main
515.239.5142 fax
515 Clark Ave. P.O. Box 811
Ames, IA 50010
www.CityofAmes.org
1
CHANGE ORDER SUMMARY:
There were zero change orders since the last report, and the changes thus far on
the project are shown on the change order log (Attachment B).
To date, change orders for the project total $379,298, or 18.06% of the
contingency budget. The contingency for this project is $2.1 million with a
current balance of $1,720,702. There is also $1 million set aside for
mitigation of contamination issues, which has not been used at this time.
ATTACHMENT(S):
Attachment A - Story Construction Monthly Project Status Update 2025-11
Attachment B - Change Order Log - 11-25-25.pdf
City Clerk's Office 515.239.5105 main
515.239.5142 fax
515 Clark Ave. P.O. Box 811
Ames, IA 50010
www.CityofAmes.org
2
Page 1 of 3
Fitch Family Indoor Aquatic Center
Monthly Project Status Report
November 2025
*Natatorium: Wellness, Recreation and Lap Pools
*Non-Natatorium: All supporting rooms outside of the Natatorium including Mechanical, Loading,
Locker Rooms, Offices, Main Lobby & Check-In, and the Alternate Walk Path
PROGRESS THIS PAST MONTH:
1. Rec Pool concrete basin slabs were completed, and current channel walls were started.
2. Pool deck concrete pours continued.
3. Wellness and Lap pool sandblasting was completed. Back-plastering started.
4. Drywall was completed for the suspended ceiling in the Lobby.
5. Resinous flooring was started.
6. Ceiling grid was completed.
7. Painting was mostly completed in the non-Natatorium. Painters will return later for a final coat.
8. Steel support bases were installed for lockers.
9. Casework and toilet accessory installations started.
10. Operable partitions were installed in the classrooms and multi-purpose rooms.
11. Interior storefront framing and glazing continued.
12. Exterior curtain wall framing and glazing continued.
13. Mechanical, electrical and plumbing installations continued in the Aquatic and Electrical
Mechanical Rooms.
14. Main Entry exterior concrete was poured and bollards were placed.
15. Landscape plantings were completed in 3 of 4 zones. The southwest plantings will be installed
once temporary road access to the building is no longer needed.
16. The parking lot unit paver install started.
17. Coordination meetings were held for mechanical equipment startup with the affected Bid
Package Contractors.
18. Building Envelope Consult inspections continued for vapor barrier, pool water stop and curtain
wall glazing.
19. Special inspections and testing of concrete and sitework continued.
20. Design team site visits and field observations continued.
21. Submittals and Requests for Information continued to be processed between the Bid Package
Contractors, Story Construction, and RDG Planning & Design.
WORK PLANNED FOR NEXT MONTH:
Page 1 of 13 3
1. Rec Pool concrete and pool deck concrete will be completed.
2. The last precast panel on the southwest corner of the Natatorium will be installed.
3. The water slide structure will be installed.
4. Pool tile will start.
5. Interior storefront doors, glazing and caulking will continue throughout.
6. Resinous flooring and polished concrete will be completed.
7. Locker bases will be tiled in preparation for the locker installation.
8. Doors and toilet accessories installation will continue.
9. The Donor Wall artwork will go into production.
10. Overhead door into Maintenance will be installed.
11. Mechanical, Plumbing and Electrical will continue in the Aquatic and Electrical Mechanical
Rooms.
12. Exterior curtain wall framing and glazing will be completed at the main entrance.
13. Exterior architectural metal panel installation will continue.
14. Perimeter sidewalk installation will be completed.
15. Parking lot pavers will be installed.
16. Coordination meetings will continue for mechanical equipment startup with the affected Bid
Package Contractors.
17. Owner Operations Introductory meetings will continue.
18. Building Envelope Consult inspections will continue for vapor barrier, pool water stop, curtain
wall glazing and sealing wall penetrations.
19. Special inspections and testing of concrete and sitework will continue.
SCHEDULE SUMMARY:
Construction Substantial Completion Date: January 20, 2026
PROJECT PHOTOS: [Next page]
WORK PLANNED FOR NEXT MONTH:
Page 2 of 13 4
Story Construction Co.
Printed on Tue Nov 18, 2025 at 01:30 pm CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
11/18/2025 at 10:41 am
Upload Date
11/18/2025 at 10:41 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_10_41…
Progress
Description
Taken Date
10/31/2025 at 02:18 pm
Upload Date
10/31/2025 at 02:18 pm
Uploaded By
Deb Thurmond
Name
IMG_2025_10_31_14_18…
LAP POOL BACK-
PLASTER IN PROGRESS
REC POOL CURRENT
CHANNEL SLAB PREP
Page 3 of 13 5
Story Construction Co.
Printed on Tue Nov 18, 2025 at 01:30 pm CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
11/18/2025 at 10:43 am
Upload Date
11/18/2025 at 10:43 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_10_43…
Progress
Description
Taken Date
11/18/2025 at 10:36 am
Upload Date
11/18/2025 at 10:37 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_10_36…
REC POOL CURRENT
CHANNEL WALL FORMS
AQUATIC MECHANICAL
EQUIPMENT PROGRESS
Page 4 of 13 6
Story Construction Co.
Printed on Tue Nov 18, 2025 at 01:30 pm CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
11/18/2025 at 10:42 am
Upload Date
11/18/2025 at 10:42 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_10_42…
Progress
Description
Taken Date
10/24/2025 at 04:13 pm
Upload Date
10/24/2025 at 04:13 pm
Uploaded By
Deb Thurmond
Name
IMG_2025_10_24_16_13…
MECH-ELEC CHILLER
EQUIPMENT PROGRESS
LOBBY CEILING PAINTING
AHEAD OF SUSPENDED
CEILING INSTALLATION
Page 5 of 13 7
Story Construction Co.
Printed on Tue Nov 18, 2025 at 01:30 pm CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
11/06/2025 at 01:26 pm
Upload Date
11/06/2025 at 01:26 pm
Uploaded By
Deb Thurmond
Name
IMG_2025_11_06_13_26…
Progress
Description
Taken Date
11/18/2025 at 10:01 am
Upload Date
11/18/2025 at 10:01 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_10_01…
LOBBY SUSPENDED
CEILING DRYWALL
LOBBY SUSPENDED
CEILING LIGHTING
Page 6 of 13 8
Story Construction Co.
Printed on Tue Nov 18, 2025 at 01:30 pm CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
11/18/2025 at 10:03 am
Upload Date
11/18/2025 at 10:03 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_10_03…
Progress
Description
Taken Date
11/18/2025 at 10:02 am
Upload Date
11/18/2025 at 10:02 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_10_02…
MAIN ENTRY
STOREFRONT DOORS
MULTI-PURPOSE CEILING
GRID AND LIGHTING
Page 7 of 13 9
Story Construction Co.
Printed on Tue Nov 18, 2025 at 01:30 pm CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
11/17/2025 at 08:29 am
Upload Date
11/17/2025 at 08:29 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_17_08_29…
Progress
Description
Taken Date
11/17/2025 at 08:30 am
Upload Date
11/17/2025 at 08:30 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_17_08_30…
MULTI-PURPOSE CUBBY
CASEWORK IN PROGRESS
CLASSROOM CEILING GRID,
CASEWORK, OPERABLE
PARTITION (folded and in
stored position)
Page 8 of 13 10
Story Construction Co.
Printed on Tue Nov 18, 2025 at 01:30 pm CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
11/18/2025 at 10:41 am
Upload Date
11/18/2025 at 10:41 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_10_41…
Progress
Description
Taken Date
11/18/2025 at 10:35 am
Upload Date
11/18/2025 at 10:35 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_10_35…
CHANGING ROOM
CORRIDOR VIEW FROM
POOL
LOCKER ROOM - LOCKER
BASE BENCHES
Page 9 of 13 11
Story Construction Co.
Printed on Tue Nov 18, 2025 at 01:30 pm CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
11/07/2025 at 10:19 am
Upload Date
11/07/2025 at 10:19 am
Uploaded By
Deb Thurmond
Name
IMG_2025_11_07_10_19…
Progress
Description
Taken Date
11/18/2025 at 02:11 pm
Upload Date
11/18/2025 at 02:11 pm
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_14_11…
LOCKER ROOM ENTRY
PAINT & DOOR IN
PROGRESS
POLISHED CONCRETE
MOCKUP
Page 10 of 13 12
Story Construction Co.
Printed on Tue Nov 18, 2025 at 01:30 pm CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
11/18/2025 at 02:09 pm
Upload Date
11/18/2025 at 02:09 pm
Uploaded By
Deb Thurmond
Name
IMG_2025_11_18_14_09…
PERMEABLE UNIT PAVER
INSTALL IN PROGRESS
Page 11 of 13 13
Aerial Photos
Description
Taken Date
11/21/2025 at 08:08 am
Upload Date
11/21/2025 at 08:11 am
Uploaded By
Mitch Anderson
Name
6B36188B-30D9-4D57-A…
Aerial Photos
Description
Taken Date
11/21/2025 at 08:08 am
Upload Date
11/21/2025 at 08:11 am
Uploaded By
Mitch Anderson
Name
4FF91F7B-FEFC-49F7-9…
Story Construction Co.
Printed on Fri Nov 21, 2025 at 10:43 am CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Page 12 of 13
AERIAL VIEW TO
SOUTHEAST -
PLANTINGS, SEED,
PAVERS IN PROGRESS
AERIAL VIEW TO
NORTHEAST - LAST
PRECAST PANEL
INSTALL ON 11/24/25
14
Aerial Photos
Description
Taken Date
11/21/2025 at 08:07 am
Upload Date
11/21/2025 at 08:11 am
Uploaded By
Mitch Anderson
Name
EA6CD175-4493-4982-A…
Aerial Photos
Description
Taken Date
11/21/2025 at 08:06 am
Upload Date
11/21/2025 at 08:11 am
Uploaded By
Mitch Anderson
Name
E8802BB7-C3D5-474E-8…
Story Construction Co.
Printed on Fri Nov 21, 2025 at 10:43 am CST
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Page 13 of 13
AERIAL VIEW TO
NORTHWEST -
PLANTINGS COMPLETE
NORTH ELEVATION -
MECHANICAL SCREEN
LOUVERS STAGED ON
ROOF FOR INSTALL
15
Contractor Change
Order #Description Amount Balance
Beginning Contingency
Balance $ 2,100,000
All Star Concrete 1 Precast Enbeds Install Change Contracts $ 10,010 $ 2,089,990
All Star Concrete 2 Increase Concrete Thickness in Maintenance Area $ 7,029 $ 2,082,961
Core Construction 1 IDPH Permit Review, Precast Panel Joint Mods, Mechanical Louver
Mods, Steel Lintel, Precast Enbeds Install Change Contracts $ 22,065 $ 2,060,896
Core Construction 2 Misc. Structural Revisions & South Elevation Glazing Revised $ 3,979 $ 2,056,917
Core Construction 3 Geared Trolley and Hoist $ (2,952) $ 2,059,869
Core Construction 4 Sink Countertop Brackets $ (1,203) $ 2,061,072
Core Construction 5 Channel Support $ 3,739 $ 2,057,333
Forrest & Associates 1 Channel Support $ 1,163 $ 2,056,170
Lansink Construction 1 Wet Room Door Change, Multipurpose Room Cubbies $ 42,129 $ 2,014,041
Lansink Construction 2 Door 115A Change to FRP $ 2,858 $ 2,011,183
Lansink Construction 3 Interior Finishes $ 3,021 $ 2,008,162
Lansink Construction 4 Check-In Standing Desk $ 3,995 $ 2,004,167
Lansink Construction 5 Sink Countertop Brackets $ 1,639 $ 2,002,528
Lansink Construction 6 Wood Blocking $ 752 $ 2,001,776
Lansink Construction 7 Waterproof Exterior - Aquatic Mechanical $ 1,167 $ 2,000,609
Lansink Construction 8 Converting Room 108 Shower to a Roll In Shower $ 2,653 $ 1,997,956
Lansink Construction 9 Donor Wall $ 33,224 $ 1,964,732
Lansink Construction 10 Additional Changing Room Tile $ 2,597 $ 1,962,135
Central States Roofing 1 IDPH Permit Review, Mechanical Louver Mods $ 1,647 $ 1,960,488
Central States Roofing 2 Roofing Over Hollow Core $ 5,116 $ 1,955,372
Orning Glass Company 1 Wet Room Door Changes $ (3,823) $ 1,959,195
Orning Glass Company 2 Window Frit Revisions $ 1,743 $ 1,957,452
Orning Glass Company 3 Auto Door Operators $ 9,757 $ 1,947,695
Hilsabek Schacht 1 Wet Room Door Change $ - $ 1,947,695
Hilsabek Schacht 2 Door 115A Change to FRP $ - $ 1,947,695
Hilsabek Schacht 3 Donor Wall Drywall $ 3,557 $ 1,944,138
Hilsabek Schacht 4 Site Signage $ (350) $ 1,944,488
Hilsabek Schacht 5 Precast Pocket Covers $ 2,598 $ 1,941,890
Hilsabek Schacht 6 Omit Painting - Mechanical Rooms $ (3,280) $ 1,945,170
Hilsabek Schacht 7 Close Off Top Of South Wellness Precast $ 3,808 $ 1,941,362
Hilsabek Schacht 8 Wellness Precast Vertical Joints & Frame Top of Masonry $ 3,656 $ 1,937,706
Hilsabek Schacht 9 Curtain Wall 12 & Metal Panels $ 599 $ 1,937,107
Sande Construction 1 IDPH Permit Review Updates $ 1,370 $ 1,935,737
Sande Construction 2 CO2 Tank Distribution Piping $ 2,692 $ 1,933,045
Sande Construction 3 Sump Pump Rail System and Backwash Pit Grate $ 4,744 $ 1,928,301
Midwest Fire Sprinkler 1 Omit Sprinkler Heads at Main Entry Exterior $ (700) $ 1,929,001
Brockway Mechanical 1 Hydronic Pumps Flow Update $ (2,320) $ 1,931,321
Brockway Mechanical 2 IDPH Permit Review Updates, 6" Storm Drain Relocation, Mechanical
Louver Mods, Glycol Feed Dual Pump $ 38,702 $ 1,892,619
Brockway Mechanical 3 State Requirements $ 12,033 $ 1,880,586
Brockway Mechanical 4 Pool Trench Drain Float Alarm $ 2,318 $ 1,878,268
Brockway Mechanical 5 Converting Room 108 Shower to a Roll In Shower $ 7,180 $ 1,871,088
Van Maanen Electric 1 IDPH Permit Review Updates $ 21,953 $ 1,849,135
Van Maanen Electric 2 Transformer Relocate $ 14,237 $ 1,834,898
Van Maanen Electric 3 Light Fixture SWA Dimming $ 4,679 $ 1,830,219
Van Maanen Electric 4 Exterior Signage Lighting Controls $ 1,007 $ 1,829,212
Van Maanen Electric 5 Pool Trench Drain Float Alarm $ 1,356 $ 1,827,856
Van Maanen Electric 6 Wiring Auto Door Operators in Corridor 108 $ 959 $ 1,826,897
Con-Struct 1 Water Service Disconnect $ 7,747 $ 1,819,150
Con-Struct 2 Building Rubble Removal $ 45,419 $ 1,773,731
Con-Struct 3 Planting Revisions $ (737) $ 1,774,468
Con-Struct 4 Curb Strip Restoration $ 9,702 $ 1,764,766
Iowa Pipe & Grading 1 Storm & Existing Water Utility Conflict & Sanitary Tie in at N. 2nd
Ave $ 14,518 $ 1,750,248
Lakeside 1 Site Signage $ 2,120 $ 1,748,128
Lakeside 2 CyRide Concrete Pad $ 296 $ 1,747,832
Lakeside 3 Replace Curb & Gutter on Oak Avenue $ 27,130 $ 1,720,702
Totals / Current Balance $ 379,298 $ 1,720,702
FITCH FAMILY INDOOR AQUATIC CENTER
CHANGE ORDER LOG
(As of 11/25/25)
Highlighted Rows Indicate New Change Orders Since the Last Update
16