Loading...
HomeMy WebLinkAboutA042 - Hearing on 2024/25 CDBG Infrastructure Program (S Russell Avenue - S 4th St to Lincoln Way) ProjectITEM #:44 DATE:10-14-25 DEPT:PW SUBJECT:2024/25 CDBG INFRASTRUCTURE PROGRAM (S RUSSELL AVENUE - S 4TH STREET TO LINCOLN WAY) COUNCIL ACTION FORM BACKGROUND: The intent of this project is to utilize Community Development Block Grant (CDBG) funding to replace approximately 1,305 feet of existing 4-inch cast iron water main with new 8-inch water main and install new water services with copper piping on the south side of S Russell Avenue. This project will improve water quality, reduce the number of lead service lines, increase firefighting capacity, and provide direct benefits to a HUD-Identified Low- and Moderate-Income (LMI) population, Census Tract 10. This project location is along S Russell Avenue from S 4th Street to Lincoln Way. On October 8, 2025, bids for the project were received as follows: Bidder Bid Amount Engineer's Estimate $575,908.00 Iowa Water & Waste Systems $484,024.40 On Track Construction, LLC $580,000.00 Jet Drain Services, LLC $636,567.50 Revenue and expenses associated with the project are estimated as follows: Funding Source Available Revenue Estimated Expenses CDBG Funding $ 680,000 Construction (as bid) $484,024.40 Engineering/Administration (est.) $80,000.00 TOTAL $ 680,000 $564,024.40 ALTERNATIVES: 1. Accept report of bids and approve final plans and specifications and award a contract to Iowa Water & Waste Systems of Boone, Iowa in the amount of $484,024.40. 2. Direct staff to revise the project. 3. Do not proceed with this project at this time. 1 CITY MANAGER'S RECOMMENDED ACTION: By improving the water systems in this local neighborhood, residents will see improved water quality, firefighting capacity, and reliability that will benefit a HUD-identified Low- and Moderate-Income (LMI) population. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as described above. ATTACHMENT(S): S. Russell Ave.pdf 2 2024/25 CDBG Infrastructure Program S. Russell Ave - S 4th St to Lincoln WayWork Area N 2ND ST LINCOLN WAY 6TH ST N 3RD ST N H A Z E L A V E N 4TH S T N R I V E R S I D E D R N R U S S E L L A V E N M A P L E A V E N O A K A V E 5TH ST N 4TH S T Ames I O W A Location Map N 3RD ST N 2ND ST N 4TH S T N H A Z E L A V E N R I V E R S I D E D R N M A P L E A V E CY T O W N L N CENTER DR LINCOLN WAY S 2ND ST S 4TH ST S 3RD ST S O A K A V E S M A P L E A V E S H A Z E L A V E UN I V E R S I T Y B L V D S R I V E R S I D E D R N O A K A V E N H A Z E L A V E N M A P L E A V E N R U S S E L L A V E N R I V E R S I D E D R CENTER DR LINCOLN WAY S 4TH ST S 2ND ST S 3RD ST S O A K A V E S M A P L E A V E S H A Z E L A V E UN I V E R S I T Y B L V D S R I V E R S I D E D R N O A K A V E N H A Z E L A V E N M A P L E A V E 3