Loading...
HomeMy WebLinkAbout~Master - June 17, 2025, Ames Area Metropolitan Planning Organization (AAMPO) Transportation Policy Committee1 MINUTES OF THE SPECIAL MEETING OF THE AMES AREA METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION POLICY COMMITTEE AMES, IOWA JUNE 17, 2025 The Special Meeting of the Ames Area Metropolitan Planning Organization (AAMPO) was called to order by Ames Mayor and voting member John Haila at 6:00 p.m. on the 17th day of June 2025, in the City Council Chambers in City Hall, 515 Clark Avenue, pursuant to law. Other voting members present were: Bronwyn Beatty-Hansen, City of Ames; Amber Corrieri, City of Ames; Tim Gartin, City of Ames; Rachel Junck, City of Ames; and Anita Rollins, City of Ames. Gloria Betcher, City of Ames, and Linda Murken, Story County Board of Supervisors, joined the meeting electronically. Ex officio Emily Boland was absent. AMES CONNECT 2050 AND COMPREHENSIVE SAFETY ACTION PLAN WORKSHOP: Transportation Planner Kyle Thompson, along with consultants Jonathan Markt and Jason Carbee provided an overview of the Metropolitan Transportation Plan (MTP) and Comprehensive Safety Action Plan (CSAP). Consultant Carbee explained that the Metropolitan Planning Organization (MPO) is required to update the transportation plan every 5 years, looking out at least 20 years to 2050. The plan was multimodal, covering bicycle, pedestrian, vehicular, freight, and transit modes. It aims to identify specific strategies and projects, including a fiscally constrained project list for distributing federal transportation funds. Consultant Markt elaborated on the Comprehensive Safety Action Plan (CSAP), which would be funded by the Safe Streets and Roads for All program. The intent was to help communities do comprehensive safety planning and become eligible for future US Department of Transportation (DOT) grant opportunities to implement projects aimed at reducing serious injuries and fatalities on roads. The presenters outlined the schedule, noting that the process began about a year ago and is currently in draft recommendation phase. They discussed the engagement milestones and technical analysis that informed the plan. Consultant Carbee then presented the five goal areas identified for the transportation system: accessibility and connectivity, safety, sustainability, efficiency and reliability, and placemaking/quality of life. He mentioned that a detailed technical analysis was conducted, covering various aspects such as safety, traffic operations, asset conditions, bicycle and pedestrian connections, freight movement, transit, and environmental considerations. The community engagement program was detailed by Consultant Carbee, which aligned the MTP and CSAP to avoid duplicative meetings. Two main milestones of engagement were conducted which identified community issues and opportunities and gathering feedback on potential solutions. He then presented the safety analysis. It identified eight key contributing factors to severe crashes: distracted driving, impaired driving, speeding, and age -based metrics. Consultant Carbee noted that the analysis allows for a more holistic understanding of crash factors beyond road conditions. He also discussed future projections for population growth highlighting that it aligned with Ames 2040 Plan. 2 Consultant Markt reviewed a map of high-priority corridors comprising over 75% of fatalities/serious injuries, noting these may be candidates for near -term investment. Consultant Carbee then presented the draft recommendations for the MTP, including short- term, mid-term, and long-term projects. He explained the prioritization process and how projects were scored against various goals and objectives. Draft project recommendations, including management projects (e.g. access changes, turn lanes), potential new interchanges/roads, and bicycle/pedestrian projects aligned with the Bike and Pedestrian Master Plan were explained by Consultant Carbee . He highlighted the prioritization process, which based on how well they align with goals/objectives, and presented the draft recommended plan, with projects bucketed into short-term (2030-2035), mid-term (2036-2042) and long-term (2043-2050) timeframes. This included both street projects and bicycle/pedestrian projects. He noted that the recommendations aimed to align available federal/local funding with highest priority needs. Transportation Planner Thompson clarified that the MPO received about $2 million annually in Surface Transportation Block Grant funds and $200,000 in Transportation Alternatives Program funds. Projects were selected and timed based on these anticipated funding levels. The Committee members engaged in questions with the presenters. The Committee did not take any formal action. Staff planned to return with a draft document for review and approval at the July 29th meeting. POLICY COMMITTEE COMMENTS: None. ADJOURNMENT: Moved by Rollins, seconded by Corrieri, to adjourn the meeting at 7:36 p.m. Vote on Motion: 6-0. Motion declared carried unanimously. Renee Hall, City Clerk John A. Haila, Mayor