Loading...
HomeMy WebLinkAbout~Master - Resolution approving Change Order No. 6 with Woodruff Construction of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 Project in the amount of $71,844.57RESOLUTION NO. 25-517 RESOLUTION APPROVING CHANGE ORDER NO. 6 ON CONTRACT WITH WOODRUFF CONSTRUCTION, INC., OF AMES, IA, FOR THE WATER POLLUTION CONTROL FACILITY NUTRIENT REDUCTION MODIFICATIONS PHASE 1 PROJECT FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 6 in the amount of $71,844.57 on contract with Woodruff Construction, Inc., of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 14th day of October, 2025. _______________________________ _________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Corrieri Seconded by: Betcher Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck Voting nay: None Absent: Rollins Resolution declared adopted and signed by the Mayor this 14th day of October, 2025.