HomeMy WebLinkAboutA031 - Resolution approving partial completion of public improvements and reducing financial security on file for Ansley Subdivision 3rd Addition to $94,203.50To:Mayor & City Council
From:Justin Clausen, P.E., CPWP-M, Public Works Director
Date:September 23, 2025
Subject:Ansley Subdivision 3rd Addition Financial Security Partial Release No.
3
Item No. 34
MEMO
Please see attached documentation for partial release of financial security on file
with the City.
ATTACHMENT(S):
Ansley 3rd Addition LOC Reduction 3.docx
City Clerk's Office 515.239.5105 main
515.239.5142 fax
515 Clark Ave. P.O. Box 811
Ames, IA 50010
www.CityofAmes.org
1
Smart Choice
Public Works Department 515.239.5160 main 515 Clark Ave. P.O. Box 811
Engineering 515.239.5404 fax Ames, IA 50010
www.CityofAmes.org
Public Works Department
515 Clark Avenue, Ames, Iowa 50010
Phone 515-239-5160  Fax 515-239-5404
September 15, 2025
Honorable Mayor and Council Members
City of Ames
Ames, Iowa 50010
RE: Ansley 3rd Addition Subdivision Letter of Credit Reduction No. 3
Mayor and Council Members:
I hereby certify that public improvements including subgrade preparation, curb and gutter, base
pavement, intermediate pavement, curb and gutter removal, and seeding required as a
condition for approval of the final plat of Ansley 3rd Addition, have been completed in an
acceptable manner by Various Contractors. The above-mentioned improvements have been
inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa
and found to meet City specifications and standards. Improvements outstanding to be
completed at this time include surface pavement, COSESCO (erosion control), sidewalk,
pedestrian ramps, pavement markings, street trees, street lights, seeding.
As a result of this certification, it is recommended that the financial security for public
improvements on file with the City for this subdivision be reduced to $94,203.50.
Sincerely,
Justin Clausen, P.E, CPWP-M
Public Works Director
JC/MB
cc: Finance, Developer, Planning & Housing, Subdivision file
2
Ansley 3rd Addition
September 15, 2025
Items completed as part of this reduction of financial security for Ansley 3rd Addition Subdivision.
ITEM UNIT Qty
SUBGRADE PREPARATION SY 4451
CURB AND GUTTER, 2.5 FT, 6 INCH LF 1557
PAVEMENT, HMA, 4 INCH BASE SY 1821
PAVEMENT, HMA, 2 INCH
INTERMEDIATE SY 1821
CURB AND GUTTER REMOVAL LF 147
CONVENTIONAL SEEDING, SEEDING,
FERTILIZING, AND MULCHING (TYPE I) AC 4
Items remaining as part of this reduction of financial security for Ansley 3rd Addition Subdivision.
ITEM UNIT Qty
PAVEMENT, PCC, 6 INCH - PRIVATE SY 1476
PAVEMENT, HMA, 4 INCH SURFACE SY 1821
SIDEWALK, PCC, 5 INCH (FUTURE
HOMEOWNER) SY 795
SIDEWALK, PCC, 5 INCH SY 115
SIDEWALK, PCC, 6 INCH SY 64
DETECTABLE WARNING SF 80
PAINTED PAVEMENT MARKINGS,
SOLVENT/WATERBORNE LS 1
EROSION CONTROL - COSESCO AC 4.78
STREET TREES EA 24
STREET LIGHTS EA 5
3