Loading...
HomeMy WebLinkAboutA013 - Resolution approving Professional Services Agreement with WHKS & Co., of Ames, IA, for the 2025/26 Shared Use Path System Expansion - South Dayton Avenue in an amount not to exceed $89,500ITEM #:16 DATE:09-23-25 DEPT:PW SUBJECT:2025/26 SHARED USE PATH SYSTEM EXPANSION - SOUTH DAYTON AVENUE COUNCIL ACTION FORM BACKGROUND: This program provides for construction of shared use paths on street rights-of-way, adjacent to streets, and through greenbelts. The City's Metropolitan Transportation Plan (MTP) identifies those paths that separate bicycle traffic from higher-speed automobile traffic. This project includes construction of a path along the east side of S. Dayton Avenue to connect E. Lincoln Way to SE 16th Street, as shown in the attached map. This contract involves the engineering design of the project. Engineering s ervices will include a base survey, evaluation of construction techniques, area drainage analysis, and preparation of plans and specifications for an Iowa DOT bid letting. The contract will also include coordination with affected property owners, at least one general public informational meeting, and coordination with right-of-way users that may require relocation. Proposals for this work were received from six engineering firms and were evaluated according to the following criteria: Project Understanding, Design Team, Previous Experience, Ability to Perform Work, and Estimated Contract Cost. Listed below is the ranking information based on this evaluation: Engineering Firm Overall Rank Estimated Design Fee WHKS & Co.1 $ 89,500 Shive-Hattery 2 $ 130,000 Snyder & Associates 3 $ 65,000 Strand 4 $ 121,000 CDA 5 $ 70,000 HR Green 6 $ 149,980 Given the above rankings, staff has negotiated a contract with the highest ranked firm, WHKS & Co., of Ames, Iowa. This project is budgeted in FY 2025/26 of the Capital Improvements Plan (CIP) with funding in the amount of $335,000 in Local Option Sales Tax. The CIP shows $390,000 in MPO funds; however, the AAMPO has awarded $520,000 in TAP funds for the project, bringing the total funding to $855,000. 1 ALTERNATIVES: 1. Approve the Professional Services Agreement with WHKS & Co. of Ames, Iowa for the 2025/26 Shared Use Path System Expansion - South Dayton Avenue in an amount not to exceed $89,500. 2. Direct staff to negotiate an engineering agreement with another consulting firm. CITY MANAGER'S RECOMMENDED ACTION: Based on staff evaluation using the selection criteria listed above, WHKS & Co. provides the best value to the City for design services of this project. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as noted above. ATTACHMENT(S): Map.pdf 2 COLT ST DEERE ST BROWNING ST WILLOW RD PECAN AVE PINE CIR BIRCH AVE SPRUCE CIR POPLAR CIR SALK AVE COLT ST S BELL AVE S DAYTON AVE SE 16TH ST E LINCOLN WAY FREEL DR SE 5TH ST S DAYTON PL SE 9TH ST ISAAC NEWTON DR ALEXANDER AVE GRAHAM ST HYATT CIR SE 5TH ST N 1 inch = 625 feet Date: 3/28/2022 Shared Use Path System ExpansionFY 2021/22: S. Dayton Avenue Cross Section #1 Cross Section #2 3