HomeMy WebLinkAbout~Master - Resolution accepting FAA Airport Improvement Program (AIP) Grant Agreement - Airport Airside Improvements (Runway 01-19 Reconstruction)RESOLUTION NO. 25-444
RESOLUTION ACCEPTING FAA AIRPORT IMPROVEMENT PROGRAM
GRANT AGREEMENT FOR AIRPORT AIRSIDE IMPROVEMENTS
(RUNWAY 01-19 RECONSTRUCTION)
FOR THE CITY OF AMES, IOWA
WHEREAS, the Federal Aviation Administration (FAA) has offered the City of
Ames a grant under the Airport Improvement Program (AIP) to fund the design, bidding,
and grant administration services for the Runway 01/19 Reconstruction project at Ames
Municipal Airport. This project will provide comprehensive design services for the
reconstruction of Runway 01/19 and its associated pavements; and,
WHEREAS, the design scope includes topographic surveying, geotechnical
investigations, aircraft fleet mix analysis, FAA pavement design, construction safety and
phasing plan development, and preparation of complete bid documents. It also includes
FAA grant administration for this design phase; and,
WHEREAS, the project also includes evaluation and adjustments to airfield
lighting, signage, and pavement markings as required to meet FAA criteria, with the ability
to incorporate Part 139 upgrades where applicable.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames,
Iowa, that the FAA AIP Grant Agreement for the Runway 01/19 Reconstruction Design
project in the amount of $1,140,095, with a local match of $56,505 from Airport
Improvement Funds is hereby approved.
ADOPTED THIS 9th day of September, 2025.
_______________________________ _________________________________
Renee Hall, City Clerk John A. Haila, Mayor
Introduced by: Gartin
Seconded by: Junck
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 9th day of September, 2025.