Loading...
HomeMy WebLinkAbout~Master - Resolution accepting FAA Airport Improvement Program (AIP) Grant Agreement - Airport Airside Improvements (Runway 01-19 Reconstruction)RESOLUTION NO. 25-444 RESOLUTION ACCEPTING FAA AIRPORT IMPROVEMENT PROGRAM GRANT AGREEMENT FOR AIRPORT AIRSIDE IMPROVEMENTS (RUNWAY 01-19 RECONSTRUCTION) FOR THE CITY OF AMES, IOWA WHEREAS, the Federal Aviation Administration (FAA) has offered the City of Ames a grant under the Airport Improvement Program (AIP) to fund the design, bidding, and grant administration services for the Runway 01/19 Reconstruction project at Ames Municipal Airport. This project will provide comprehensive design services for the reconstruction of Runway 01/19 and its associated pavements; and, WHEREAS, the design scope includes topographic surveying, geotechnical investigations, aircraft fleet mix analysis, FAA pavement design, construction safety and phasing plan development, and preparation of complete bid documents. It also includes FAA grant administration for this design phase; and, WHEREAS, the project also includes evaluation and adjustments to airfield lighting, signage, and pavement markings as required to meet FAA criteria, with the ability to incorporate Part 139 upgrades where applicable. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that the FAA AIP Grant Agreement for the Runway 01/19 Reconstruction Design project in the amount of $1,140,095, with a local match of $56,505 from Airport Improvement Funds is hereby approved. ADOPTED THIS 9th day of September, 2025. _______________________________ _________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Gartin Seconded by: Junck Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 9th day of September, 2025.