Loading...
HomeMy WebLinkAboutA041 - Hearing on 2024/25 Water System Improvements Program (E. 14th St & Meadowlane Ave) ProjectITEM #:45 DATE:08-12-25 DEPT:PW SUBJECT:2024/25 WATER SYSTEM IMPROVEMENTS PROGRAM (E. 14TH STREET & MEADOWLANE AVENUE) COUNCIL ACTION FORM BACKGROUND: The Water System Improvements program provides for replacing water mains in areas that are experiencing rusty water problems. It also provides for installing larger distribution mains in areas that have a high concentration of 4” and 6" supply lines, transferring water services from 4” and 6" water mains in streets where larger water mains exist, and abandoning 4” water mains. Eliminating duplicate water mains, where possible, improves water flow and helps reduce rusty water. This project will include improvements on E. 14th Street from Meadowlane Avenue to Glendale Avenue and Meadowlane Avenue from E. 13th Street to E. 14th Street. On August 6, 2025, four bids for the project were received. However, one bid did not include all the required information and was deemed non-responsive. Bidder Bid Amount Engineer's Estimate $349,339.50 Jet Drain Services, LLC. $314,426.00 On Track Construction, LLC $319,085.70 K. E. Builders, LLC $345,102.90 Iowa Water & Waste Systems Non-responsive bid Revenue and expenses associated with the project are estimated as follows: Funding Source Available Revenue Estimated Expenses 2024/25 Water System Improvement Program $ 380,000 Construction $ 314,426 Engineering/Administration 45,000 TOTAL $ 380,000 $ 359,426 ALTERNATIVES: 1. The City Council can: a. Accept report of bids for the 2024/25 Water System Improvements Program (E. 14th St & Meadowlane Ave) Project. b. Approve final plans and specifications and award the 2024/25 Water System Improvements Program (E. 14th St & Meadowlane Ave) Project to Jet Drain Services, LLC. of Ames, Iowa, in the amount of $314,426. 1 2. Do not proceed with this project. CITY MANAGER'S RECOMMENDED ACTION: By improving the water systems in these local neighborhoods, residents will see improved water quality and increased firefighting capacity. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as described above. ATTACHMENT(S): E. 14th & Meadowlane Water.pdf 2 2025/26 Water System Improvements Program Open trenching Sanitary Force main on South side of East Lincoln Way Lift Station Single Lane Alternating Traffic North Side of intersectionS 16TH ST S D U F F A V E GO L D E N A S P E N D R S K E L L O G G A V E BU C K E Y E A V E ASPEN RIDGE RD ¯E 14th Street - Glendale Ave to Meadowlane Ave Meadowlane Ave - E 13th St to E. 14th St Vet Med Trail Box Culvert D D D D D D D D D D D D D D D D !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 #* #*#*#* #* %2 %2 %2 "S "S "S "S "S "S "S "S"S !!2 !!2 S R I V E R S I D E D R AP P L E P L UNIVE R S I T Y B L V D S 16TH ST Project Location S 16TH ST S D U F F A V E GO L D E N A S P E N D R BU C K E Y E A V E S K E L L O G G A V E ASPEN RIDGE RD DD D D D D D D D D D D D DD D D D D D D D D !!2 !!2 !!2 !!2 !!2 !!2!!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 GR A N D A V E RO Y K E Y A V E BLOOMINGTON RD TOP O HOLLOW RD DA W E S D R POLARIS DR D D D D D D D D D D D D D D D D D D D D D D D D D D DD !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2!!2 !!2 6TH ST 5TH ST MAIN ST GR A N D A V E AL L A N D R PE A R L E A V E D D D D D D D D D D D D D D D D D DD !!2 !!2 !!2 !!2 6TH ST HO D G E A V E D D D D D D D D D D D D D !!2 !!2 !!2 !!2 6TH ST HO D G E A V E D D D D D D D D D D D D D D D D DD D D D D D D D D !!2 !!2!!2 !!2 !!2 !!2 !!2!!2 !!2 !!2 !!2 !!2 !!2 !!2S 3RD ST S 2ND ST S S H E R M A N A V E SE 2ND ST SE 3RD ST SU M N E R A V E E 13TH ST IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P E 13TH ST IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P IN T E R S T A T E 3 5 E 13TH ST IN T E R S T A T E 3 5 57 0 T H A V E IN T E R S T A T E 3 5 R A M P IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P Full Road Closure from 4/1/2024 to 4/12/2024 E 13TH ST IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P 57 0 T H A V E IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P 6TH ST 7TH ST 8TH ST 9TH ST 10TH ST 13TH ST DU F F A V E 12TH ST CL A R K A V E 11TH ST GR A N D A V E BU R N E T T A V E CA R R O L L A V E E 6TH ST KE L L O G G A V E WI L S O N A V E E 13TH ST E 7TH ST E 9TH ST MA X W E L L A V E DO U G L A S A V E E 11TH ST E 12TH ST HO D G E A V E E 8TH ST HA R D I N G A V E ST A F F O R D A V E CR A W F O R D A V E 13TH ST 11TH ST DU F F A V E 12TH ST BU R N E T T A V E KE L L O G G A V E E 13TH ST E 12TH ST E 11TH ST McFarland Clinic Water Shut Off Saturday After 12PM Only Pavement Removal & Replacement: Duration: 2 to 4 Days Pavement Removal & Replacement: Duration: 2 to 4 Days 1018 Kellogg Ave & 222 11th St. Water Shut Off Duration: 3 to 4 Hours 7TH ST 8TH ST 9TH ST 10TH ST 11TH ST 12TH ST DU F F A V E CL A R K A V E GR A N D A V E WI L S O N A V E BU R N E T T A V E CA R R O L L A V E E 9TH ST E 8TH ST E 7TH ST E 11TH ST DO U G L A S A V E E 12TH ST ST A F F O R D A V E E 13TH ST E 14TH ST GL E N D A L E A V E ME A D O W L A N E A V E LI N D E N D R 3