HomeMy WebLinkAboutA037 - Staff Report Regarding Fire Station #2 Relocation - Net Zero-Ready Versus Non Net-Zero ReadyITEM #:41 DEPT:FIRE August 12, 2025 Staff Report FIRE STATION #2 RELOCATION - NET-ZERO READY VERSUS NON NET-ZERO READY BACKGROUND: Ames Fire Station #2 is located at 132 Welch Avenue, at the intersection of Chamberlain Street and Welch Avenue. The station, which was built in 1966, is a single story, 5,500 square foot, three apparatus bay station. The current facility presents significant operational challenges, including access difficulties for fire apparatus and outdated facilities that no longer meet fire service requirements. The size of the lot and corresponding design of the fire station do not allow for drive-through access into the station, requiring apparatus to back into the fire station upon returning to the station in the midst of heavy pedestrian and vehicle traffic. Therefore, it is now appropriate to take steps to replace this station with a modern facility that incorporates the best practices for emergency response services and improves fire department response times. Staff has identified land owned by Iowa State University on the west side of State Avenue as an appropriate site for a relocated Station #2. To accomplish this project, the University will need to approve a long-term lease for the land on which to construct a new fire station. The specific location of the new fire station will be coordinated with the University to avoid unnecessary impacts to the property. This location will also improve the Fire Department's overall average response times to the total city. After construction of the new Fire Station #2 is completed, the existing fire station could be sold and the proceeds used to help reduce the amount of property taxes needed to pay the principal and interest on the bonds issued to finance the project. The existing fire station was built with funding from the City and Iowa State University. In discussions with Iowa State, administrators have expressed support to allow ISU's proceeds from the sale to be used to offset the cost of the new station. On April 22, 2025, the City Council approved a contract for schematic and design development with Brown Watford Architects (BRW), of College Station, Texas. The new facility is anticipated to be a single-story, four-bay fire station capable of accommodating an aerial platform apparatus. In this initial phase, the consultant is providing the City: 1. A schematic design and design development for the construction of the new fire station which includes a conceptual design with floor plans and elevations; 2. A preliminary cost estimate based on metrics of the City and the number of projected 1 calls, equipment and staff needs; and 3. A timeline with milestones for the project to provide sufficient information to seek a bond referendum as soon as in November 2025 should the City Council prioritize Fire Station #2 as the next capital improvement that should be pursued. NET-ZERO READY VERSUS NON NET- ZERO READY: One of the suggested Six Big Moves highlighted in the City's Climate Action Plan is to construct all new City buildings to Net-Zero Ready standards. A Net-Zero Ready building incorporates all of the features necessary to make it net zero with the addition of a renewable energy system (i.e., solar panels) in the future. Prior to making a final decision related to this issue and finalizing the schematic plans, the consultant was to provide an incremental cost for a Net-Zero Ready building. To provide the incremental costs, the consultant has prepared three cost estimates for review: 1) a Non Net- Zero building, 2) a Net-Zero-Capable building, and 3) a Net-Zero Ready building. Non Net-Zero Ready Building The Non Net-Zero Ready building would be a traditional building, designed and constructed to adopted codes, with mechanical systems housed in an attic or mezzanine to reduce the overall square footage. The Non Net-Zero building would still have a more robust HVAC system compared to a typical commercial building to accommodate individual temperatures in sleeping quarters. The roof will be designed to allow for the installation of solar panels. Net-Zero Capable Building The Net-Zero Capable building would have an additional square footage to accommodate future installation geothermal heating and cooling, upgraded mechanical equipment on the main floor, and room for installation of future upgrades to electrical systems. Net-Zero Ready Building The Net-Zero Ready building would have the additional square footage, the geothermal heating and cooling installed, upgraded mechanical systems installed, upgraded electrical systems installed, and would meet Net-Zero if solar panels were installed. The following table shows the construction cost of three options. These are 2025 construction costs, and this does not include other items for the total project, such as Architectural/Engineering fees, third-party testing, and furniture and fixture equipment. Building Construction Type Total Cost Building Square Ft.*Cost per sf Non-Net-Zero $7,985,137 14,000 $570 Net-Zero Capable $8,432,013 14,810 $569 Net-Zero Ready $9,061,654 14,810 $612 * The current Fire Station #2 is 5,500 square feet and Fire Station #3 is 7,340 square feet. It should be noted that the estimated cost shown above to construct Fire Station #2 to a Net-Zero Ready status includes $317,947.97 to build to an LEED Silver status. The 2 Council will have to decide whether or not to pursue this standard. In addition, BRW has estimates that the cost to install solar panels on the roof of the station would cost an additional $725,000. Since the two Net Zero options shown (Net-Zero Capable and Net-Zero Ready) would require more square footage in the interior of the building, there would not be an opportunity to have that as an alternate during bidding. The increase in square footage is due to the weight and complexity of moving this to a mezzanine. However, Geothermal with the Net-Zero Capable could be bid as an alternate. OPTIONS: 1. Direct staff to have the architect design a Net-Zero Ready building. 2. Direct staff to have the architect design a Net-Zero Capable building. 3. Direct staff to have the architect design the building a Non Net-Zero building. 4. Direct staff to come back with more information before final direction is given. STAFF COMMENTS: In order to proceed with the schematic design of the new Fire Station, the City Council must first give direction to the architect as to which of the first three options listed above should be pursued. It should be emphasized that the cost estimates listed above do not include an option for utilizing an air source heat pump system. ATTACHMENT(S): Ames Cost Estimate 8 1 25 Net Zero Ready Minimum-EDIT.pdf Ames Cost Estimate 7 31 25 No Net Zero - edit.pdf Ames Cost Estimate 8 1 25 Net Zero-edit.pdf 3 AMES FIRE STATION NO. 2 8/1/2025 STATEMENT OF PROBABLE CONSTRUCTION COST - NET ZERO READY - MINIMUM GROSS SQ FT: 14,810 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 1 - GENERAL REQUIREMENTS $724,298 General Conditions & Expenses GSF 14,810 $15.84 $234,590 Overhead & Profit GSF 14,810 $25.41 $376,322 Insurance GSF 14,810 $3.04 $44,963 Payment & Performance Bonds GSF 14,810 $4.62 $68,422 DIVISION 2 - DEMOLITION $0 See Civil Cost Estimate LS 1 $0.00 $0 DIVISION 3 - CONCRETE $614,259 Slab on Grade with Footings SF 12,732 $39.60 $504,187 Concrete Floor Deck SF 4,075 $13.20 $53,790 Ground & Polished Concrete Finish SF 9,475 $5.94 $56,282 DIVISION 4 - MASONRY $719,566 12" Concrete Masonry Units SF 9,815 $26.40 $259,116 8" Concrete Masonry Units SF 703 $23.76 $16,703 Stone and Brick Veneer SF 9,734 $43.56 $424,013 Cast Stone Trim LF 230 $85.80 $19,734 DIVISION 5 - METALS $460,746 Structural Steel GSF 14,810 $6.60 $97,746 Miscellaneous Steel GSF 14,810 $5.28 $78,197 Standing Seam Metal Roof SF 17,980 $15.84 $284,803 DIVISION 6 - WOODS, PLASTICS, AND COMPOSITES $524,154 Rough Carpentry (Wood Blocking & Misc. Framing) GSF 14,810 $2.64 $39,098 Wood Trusses (Certified Sourced Wood) GSF 14,810 $7.26 $107,521 Wood Framing (Certified Sourced Wood) GSF 14,810 $11.22 $166,168 Attic Floor Decking SF 412 $1.98 $816 Wood Soffit SF 7,506 $10.56 $79,263 Interior Architectural Woodwork (Cabinets & Shelving) LF 280 $290.40 $81,312 Quartz Countertop SF 278 $92.40 $25,687 Solid Surface Countertop LF 160 $151.80 $24,288 4 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 7 - THERMAL AND MOISTURE PROTECTION $462,228 2" Mineral Fiber Insulation (Exterior Walls) SF 9,210 $3.30 $30,393 Composite Nail-Base Insulated Roof Sheathing SF 17,980 $4.62 $83,068 4" R-14.8 Spray Foam Insulation (Exterior Walls) SF 9,210 $4.29 $39,511 4" R-26 Spray Foam Insulation (Roof) SF 11,040 $4.95 $54,648 Gypsum Sheathing SF 9,200 $1.70 $15,666 Fluid-Applied Bituminous Dampproofing SF 710 $1.98 $1,406 Modified Bituminous Sheet Air Barrier SF 3,525 $3.30 $11,633 Plastic Film Air Barrier SF 7,570 $1.98 $14,989 Sub-foundation Vapor Barrier SF 14,331 $0.33 $4,729 Fiber Cement Siding SF 11,439 $10.56 $120,796 Composition Shingle Roof SF 0 $7.39 $0 Roofing Underlayment SF 17,980 $3.30 $59,334 Roof Accessories, Gutters & Downspouts LF 316 $19.80 $6,257 Metal Flashing & Trim LS 1 $13,200.00 $13,200 Joint Sealants LS 1 $6,600.00 $6,600 DIVISION 8 - OPENINGS $623,963 Hollow Metal Frames EA 57 $363.00 $20,691 Hollow Metal Doors EA 18 $792.00 $14,256 Flush Wood Doors EA 26 $429.00 $11,154 Access Doors LS 1 $3,168.00 $3,168 Four-fold Doors EA 8 $47,520.00 $380,160 Aluminum Storefront Doors EA 1 $1,980.00 $1,980 Exterior Aluminum Storefront SF 1,530 $99.00 $151,470 Interior Aluminum Storefront SF 175 $26.40 $4,620 Custom Glass Mirrors SF 166 $18.48 $3,068 Door Hardware EA 44 $759.00 $33,396 DIVISION 9 - FINISHES $377,290 Gypsum Board Walls & Furr downs GSF 14,810 $7.00 $103,611 Suspended Gypsum Board Ceilings SF 2,800 $7.00 $19,589 Porcelain Floor Tile SF 2,000 $17.16 $34,320 LVT SF 7,200 $7.92 $57,024 Acoustical Ceiling Tiles SF 2,600 $7.26 $18,876 Acoustical Insulation GSF 14,810 $0.79 $11,730 Rubber Wall Base LF 1,600 $13.20 $21,120 Painting GSF 14,810 $6.73 $99,701 Rubber Flooring SF 536 $21.12 $11,320 5 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 10 - SPECIALTIES $74,983 Interior Room Signage EA 49 $59.40 $2,911 Exterior Illuminated Signage EA 2 $9,240.00 $18,480 Building Plaque EA 1 $3,300.00 $3,300 Toilet Partitions LS 1 $7,920.00 $7,920 Corner Guards EA 15 $52.80 $792 Toilet Accessories LS 1 $11,880.00 $11,880 Fire Protection Specialties LS 1 $3,696.00 $3,696 Lockers EA 20 $237.60 $4,752 Turnout Gear Lockers EA 21 $924.00 $19,404 Aluminum Sunscreens & Canopies SF 0 $132.00 $0 Flagpoles EA 1 $1,848.00 $1,848 DIVISION 11 - EQUIPMENT $30,314 Gas Range EA 1 $13,919.40 $13,919 Refrigerator EA 2 $2,508.00 $5,016 Microwave EA 1 $950.40 $950 Dishwasher EA 1 $1,584.00 $1,584 Undercounter Ice Maker EA 1 $3,036.00 $3,036 Equipment Installation LS 1 $2,640.00 $2,640 Stainless Steel Countertops SF 48 $66.00 $3,168 DIVISION 12 - FURNISHINGS $12,130 Window Roller Shades EA 13 $316.80 $3,120 Entrance Mats SF 170 $69.96 $9,010 DIVISION 14 - CONVEYING EQUIPMENT $0 Holeless Hydraulic Elevator EA 0 $101,640.00 $0 DIVISION 21 - FIRE SUPPRESSION $58,648 NFPA 13 Fire Suppression System GSF 14,810 $3.96 $58,648 DIVISION 22 - PLUMBING $410,978 Water, Sewer, Natural Gas, Compressed Air GSF 14,810 $27.75 $410,978 DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING $833,063 VRV System, Ductwork, Exhaust Fans, Louvers GSF 14,810 $56.25 $833,063 Geo- Thermal DIVISION 26 - ELECTRICAL $688,651 Power & Lighting GSF 14,810 $40.26 $596,251 Lightning Protection System LS 1 $13,200.00 $13,200 Generator & Automatic Transfer Switch LS 1 $79,200.00 $79,200 Upgraded power demand LS 1 $0 Photovoltaics Panels, Batteries, Panels, Computer System LS 1 6 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 28 - FIRE ALARM $24,437 Fire Detection & Alarm System GSF 14,810 $1.65 $24,437 DIVISION 31 - EARTHWORK $445,964 Site Grading GSF 90,215 $3.50 $315,572 Building Pad $0.00 $0 Storm Water Pollution and Erosion Control LS 1 $11,880.00 $11,880 Termite Treatment SF 14,331 $0.07 $946 DIVISION 32 - EXTERIOR IMPROVEMENTS $824,303 8" Concrete Paving SF 19,670 $9.24 $181,751 *8" Concrete Paving (Intersection and Drive) SF 34,580 $9.24 $319,519 6" Concrete Paving SF 1,504 $7.26 $10,919 4" Concrete Sidewalk SF 1,884 $6.60 $12,434 *4" Concrete Sidewalk (Intersection) SF 2,722 $6.60 $17,965 Concrete Curbs LF 1,905 $10.56 $20,117 *Concrete Curbs (Intersection) LF 985 $10.56 $10,402 Pavement Markings & Striping LS 1 $2,904.00 $2,904 *Pavement Markings & Striping (Intersection) LS 1 $3,960.00 $3,960 Ornamental Metal Fencing & Gates LF 518 $330.00 $170,940 Masonry Screening Walls LF 16 $132.00 $2,112 Irrigation LS 1 $23,760.00 $23,760 Landscaping LS 1 $47,520.00 $47,520 DIVISION 33 - UTILITIES $120,000 Stormwater, Water, Sewer, Natural Gas, Comm. LS 1 $120,000.00 $120,000 BUILDING SUBTOTAL $8,029,972 COST PER SQUARE FOOT $542 USGBC LEED Silver GSF 14,810 $0.00 OWNERS AND CONSTRUCTION CONTINGENCY (5%)$401,499 PROBABLE CONSTRUCTION COST $8,432,013 COST PER SQUARE FOOT $569 OWNER PROVIDED ITEMS & SERVICES (Not Included in Construction Cost) Architectural/Engineering Fees Construction Materials Testing Radio & Antenna Systems Data & Communications Equipment (Servers, Computers, Printers, TVs & Phones) Applicances & Equipment Movable Furniture & Matresses Weight/Exercise Equipment Cookware, Dishes, & Utensils Utilities & Connection Fees (Water and Electric) Utilities & Connection Fees (Electric) Project Management Services 7 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL 8 AMES FIRE STATION NO. 2 7/30/2025 STATEMENT OF PROBABLE CONSTRUCTION COST - NO NET ZERO GROSS SQ FT: 14,000 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 1 - GENERAL REQUIREMENTS $684,684 General Conditions & Expenses GSF 14,000 $15.84 $221,760 Overhead & Profit GSF 14,000 $25.41 $355,740 Insurance GSF 14,000 $3.04 $42,504 Payment & Performance Bonds GSF 14,000 $4.62 $64,680 DIVISION 2 - DEMOLITION $0 See Civil Cost Estimate LS 1 $0.00 $0 DIVISION 3 - CONCRETE $574,583 Slab on Grade with Footings SF 11,932 $39.60 $472,507 Concrete Floor Deck SF 3,469 $13.20 $45,794 Ground & Polished Concrete Finish SF 9,475 $5.94 $56,282 DIVISION 4 - MASONRY $623,850 12" Concrete Masonry Units SF 9,815 $26.40 $259,116 8" Concrete Masonry Units SF 703 $23.76 $16,703 Stone and Brick Veneer SF 7,604 $43.56 $331,230 Cast Stone Trim LF 196 $85.80 $16,801 DIVISION 5 - METALS $412,664 Structural Steel GSF 14,000 $6.60 $92,400 Miscellaneous Steel GSF 14,000 $5.28 $73,920 Standing Seam Metal Roof SF 15,552 $15.84 $246,344 DIVISION 6 - WOODS, PLASTICS, AND COMPOSITES $495,143 Rough Carpentry (Wood Blocking & Misc. Framing) GSF 14,000 $2.64 $36,960 Wood Trusses (Certified Sourced Wood) GSF 14,000 $7.26 $101,640 Wood Framing (Certified Sourced Wood) GSF 14,000 $11.22 $157,080 Attic Floor Decking SF 351 $1.98 $694 Wood Soffit SF 6,390 $10.56 $67,481 Interior Architectural Woodwork (Cabinets & Shelving) LF 280 $290.40 $81,312 Quartz Countertop SF 278 $92.40 $25,687 Solid Surface Countertop LF 160 $151.80 $24,288 9 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 7 - THERMAL AND MOISTURE PROTECTION $415,745 2" Mineral Fiber Insulation (Exterior Walls) SF 7,604 $3.30 $25,093 Composite Nail-Base Insulated Roof Sheathing SF 15,552 $4.62 $71,850 4" R-14.8 Spray Foam Insulation (Exterior Walls) SF 7,604 $4.29 $32,621 4" R-26 Spray Foam Insulation (Roof) SF 11,040 $4.95 $54,648 Gypsum Sheathing SF 7,832 $1.70 $13,337 Fluid-Applied Bituminous Dampproofing SF 604 $1.98 $1,197 Modified Bituminous Sheet Air Barrier SF 3,001 $3.30 $9,903 Plastic Film Air Barrier SF 6,445 $1.98 $12,761 Sub-foundation Vapor Barrier SF 13,324 $0.33 $4,397 Fiber Cement Siding SF 10,815 $10.56 $114,203 Composition Shingle Roof SF 0 $7.39 $0 Roofing Underlayment SF 15,552 $3.30 $51,322 Roof Accessories, Gutters & Downspouts LF 269 $19.80 $5,327 Metal Flashing & Trim LS 1 $13,200.00 $12,486 Joint Sealants LS 1 $6,600.00 $6,600 DIVISION 8 - OPENINGS $620,135 Hollow Metal Frames EA 55 $363.00 $19,965 Hollow Metal Doors EA 16 $792.00 $12,672 Flush Wood Doors EA 26 $429.00 $11,154 Access Doors LS 1 $3,168.00 $3,168 Four-fold Doors EA 8 $47,520.00 $380,160 Aluminum Storefront Doors EA 1 $1,980.00 $1,980 Exterior Aluminum Storefront SF 1,530 $99.00 $151,470 Interior Aluminum Storefront SF 175 $26.40 $4,620 Custom Glass Mirrors SF 166 $18.48 $3,068 Door Hardware EA 42 $759.00 $31,878 DIVISION 9 - FINISHES $359,507 Gypsum Board Walls & Furr downs GSF 14,000 $7.00 $97,944 Suspended Gypsum Board Ceilings SF 2,800 $7.00 $19,589 Porcelain Floor Tile SF 2,000 $17.16 $34,320 LVT SF 6,800 $7.92 $53,856 Acoustical Ceiling Tiles SF 2,600 $7.26 $18,876 Acoustical Insulation GSF 14,000 $0.79 $11,088 Rubber Wall Base LF 1,384 $13.20 $18,266 Painting GSF 14,000 $6.73 $94,248 Rubber Flooring SF 536 $21.12 $11,320 10 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 10 - SPECIALTIES $74,864 Interior Room Signage EA 47 $59.40 $2,792 Exterior Illuminated Signage EA 2 $9,240.00 $18,480 Building Plaque EA 1 $3,300.00 $3,300 Toilet Partitions LS 1 $7,920.00 $7,920 Corner Guards EA 15 $52.80 $792 Toilet Accessories LS 1 $11,880.00 $11,880 Fire Protection Specialties LS 1 $3,696.00 $3,696 Lockers EA 20 $237.60 $4,752 Turnout Gear Lockers EA 21 $924.00 $19,404 Aluminum Sunscreens & Canopies SF 0 $132.00 $0 Flagpoles EA 1 $1,848.00 $1,848 DIVISION 11 - EQUIPMENT $30,314 Gas Range EA 1 $13,919.40 $13,919 Refrigerator EA 2 $2,508.00 $5,016 Microwave EA 1 $950.40 $950 Dishwasher EA 1 $1,584.00 $1,584 Undercounter Ice Maker EA 1 $3,036.00 $3,036 Equipment Installation LS 1 $2,640.00 $2,640 Stainless Steel Countertops SF 48 $66.00 $3,168 DIVISION 12 - FURNISHINGS $12,130 Window Roller Shades EA 13 $316.80 $3,120 Entrance Mats SF 170 $69.96 $9,010 DIVISION 14 - CONVEYING EQUIPMENT $0 Holeless Hydraulic Elevator EA 0 $101,640.00 $0 DIVISION 21 - FIRE SUPPRESSION $55,440 NFPA 13 Fire Suppression System GSF 14,000 $3.96 $55,440 DIVISION 22 - PLUMBING $388,500 Water, Sewer, Natural Gas, Compressed Air GSF 14,000 $27.75 $388,500 $23.31 DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING $787,500 VRV System, Ductwork, Exhaust Fans, Louvers GSF 14,000 $56.25 $787,500 Geo- Thermal $47.25 DIVISION 26 - ELECTRICAL $656,040 Power & Lighting GSF 14,000 $40.26 $563,640 Lightning Protection System LS 1 $13,200.00 $13,200 Generator & Automatic Transfer Switch LS 1 $79,200.00 $79,200 Upgraded power demand LS 1 $0 Photovoltaics Panels, Batteries, Panels, Computer System LS 1 11 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 28 - FIRE ALARM $23,100 Fire Detection & Alarm System GSF 14,000 $1.65 $23,100 DIVISION 31 - EARTHWORK $445,874 Site Grading GSF 90,215 $3.50 $315,572 Building Pad $0.00 $0 Storm Water Pollution and Erosion Control LS 1 $11,880.00 $11,880 Termite Treatment SF 13,324 $0.07 $879 DIVISION 32 - EXTERIOR IMPROVEMENTS $824,303 8" Concrete Paving SF 19,670 $9.24 $181,751 *8" Concrete Paving (Intersection and Drive) SF 34,580 $9.24 $319,519 6" Concrete Paving SF 1,504 $7.26 $10,919 4" Concrete Sidewalk SF 1,884 $6.60 $12,434 *4" Concrete Sidewalk (Intersection) SF 2,722 $6.60 $17,965 Concrete Curbs LF 1,905 $10.56 $20,117 *Concrete Curbs (Intersection) LF 985 $10.56 $10,402 Pavement Markings & Striping LS 1 $2,904.00 $2,904 *Pavement Markings & Striping (Intersection) LS 1 $3,960.00 $3,960 Ornamental Metal Fencing & Gates LF 518 $330.00 $170,940 Masonry Screening Walls LF 16 $132.00 $2,112 Irrigation LS 1 $23,760.00 $23,760 Landscaping LS 1 $47,520.00 $47,520 DIVISION 33 - UTILITIES $120,000 *Stormwater, Water, Sewer, Electrical, Comm. LS 1 $120,000.00 $120,000 Coordinate with the City of Ames BUILDING SUBTOTAL $7,604,375 COST PER SQUARE FOOT $543 USGBC LEED Silver GSF 14,000 $0.00 OWNERS AND CONSTRUCTION CONTINGENCY (5%)$380,219 PROBABLE CONSTRUCTION COST $7,985,137 COST PER SQUARE FOOT $570 OWNER PROVIDED ITEMS & SERVICES (Not Included in Construction Cost) Architectural/Engineering Fees Construction Materials Testing Radio & Antenna Systems Data & Communications Equipment (Servers, Computers, Printers, TVs & Phones) Applicances & Equipment Movable Furniture & Matresses Weight/Exercise Equipment Cookware, Dishes, & Utensils Utilities & Connection Fees (Water and Electric) Utilities & Connection Fees (Electric) Project Management Services 12 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL 13 AMES FIRE STATION NO. 2 8/1/2025 STATEMENT OF PROBABLE CONSTRUCTION COST - NET ZERO GROSS SQ FT: 14,810 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 1 - GENERAL REQUIREMENTS $724,298 General Conditions & Expenses GSF 14,810 $15.84 $234,590 Overhead & Profit GSF 14,810 $25.41 $376,322 Insurance GSF 14,810 $3.04 $44,963 Payment & Performance Bonds GSF 14,810 $4.62 $68,422 DIVISION 2 - DEMOLITION $0 See Civil Cost Estimate LS 1 $0.00 $0 DIVISION 3 - CONCRETE $614,259 Slab on Grade with Footings SF 12,732 $39.60 $504,187 Concrete Floor Deck SF 4,075 $13.20 $53,790 Ground & Polished Concrete Finish SF 9,475 $5.94 $56,282 DIVISION 4 - MASONRY $719,566 12" Concrete Masonry Units SF 9,815 $26.40 $259,116 8" Concrete Masonry Units SF 703 $23.76 $16,703 Stone and Brick Veneer SF 9,734 $43.56 $424,013 Cast Stone Trim LF 230 $85.80 $19,734 DIVISION 5 - METALS $460,746 Structural Steel GSF 14,810 $6.60 $97,746 Miscellaneous Steel GSF 14,810 $5.28 $78,197 Standing Seam Metal Roof SF 17,980 $15.84 $284,803 DIVISION 6 - WOODS, PLASTICS, AND COMPOSITES $524,154 Rough Carpentry (Wood Blocking & Misc. Framing) GSF 14,810 $2.64 $39,098 Wood Trusses (Certified Sourced Wood) GSF 14,810 $7.26 $107,521 Wood Framing (Certified Sourced Wood) GSF 14,810 $11.22 $166,168 Attic Floor Decking SF 412 $1.98 $816 Wood Soffit SF 7,506 $10.56 $79,263 Interior Architectural Woodwork (Cabinets & Shelving) LF 280 $290.40 $81,312 Quartz Countertop SF 278 $92.40 $25,687 Solid Surface Countertop LF 160 $151.80 $24,288 14 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 7 - THERMAL AND MOISTURE PROTECTION $462,228 2" Mineral Fiber Insulation (Exterior Walls) SF 9,210 $3.30 $30,393 Composite Nail-Base Insulated Roof Sheathing SF 17,980 $4.62 $83,068 4" R-14.8 Spray Foam Insulation (Exterior Walls) SF 9,210 $4.29 $39,511 4" R-26 Spray Foam Insulation (Roof) SF 11,040 $4.95 $54,648 Gypsum Sheathing SF 9,200 $1.70 $15,666 Fluid-Applied Bituminous Dampproofing SF 710 $1.98 $1,406 Modified Bituminous Sheet Air Barrier SF 3,525 $3.30 $11,633 Plastic Film Air Barrier SF 7,570 $1.98 $14,989 Sub-foundation Vapor Barrier SF 14,331 $0.33 $4,729 Fiber Cement Siding SF 11,439 $10.56 $120,796 Composition Shingle Roof SF 0 $7.39 $0 Roofing Underlayment SF 17,980 $3.30 $59,334 Roof Accessories, Gutters & Downspouts LF 316 $19.80 $6,257 Metal Flashing & Trim LS 1 $13,200.00 $13,200 Joint Sealants LS 1 $6,600.00 $6,600 DIVISION 8 - OPENINGS $623,963 Hollow Metal Frames EA 57 $363.00 $20,691 Hollow Metal Doors EA 18 $792.00 $14,256 Flush Wood Doors EA 26 $429.00 $11,154 Access Doors LS 1 $3,168.00 $3,168 Four-fold Doors EA 8 $47,520.00 $380,160 Aluminum Storefront Doors EA 1 $1,980.00 $1,980 Exterior Aluminum Storefront SF 1,530 $99.00 $151,470 Interior Aluminum Storefront SF 175 $26.40 $4,620 Custom Glass Mirrors SF 166 $18.48 $3,068 Door Hardware EA 44 $759.00 $33,396 DIVISION 9 - FINISHES $377,290 Gypsum Board Walls & Furr downs GSF 14,810 $7.00 $103,611 Suspended Gypsum Board Ceilings SF 2,800 $7.00 $19,589 Porcelain Floor Tile SF 2,000 $17.16 $34,320 LVT SF 7,200 $7.92 $57,024 Acoustical Ceiling Tiles SF 2,600 $7.26 $18,876 Acoustical Insulation GSF 14,810 $0.79 $11,730 Rubber Wall Base LF 1,600 $13.20 $21,120 Painting GSF 14,810 $6.73 $99,701 Rubber Flooring SF 536 $21.12 $11,320 15 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 10 - SPECIALTIES $74,983 Interior Room Signage EA 49 $59.40 $2,911 Exterior Illuminated Signage EA 2 $9,240.00 $18,480 Building Plaque EA 1 $3,300.00 $3,300 Toilet Partitions LS 1 $7,920.00 $7,920 Corner Guards EA 15 $52.80 $792 Toilet Accessories LS 1 $11,880.00 $11,880 Fire Protection Specialties LS 1 $3,696.00 $3,696 Lockers EA 20 $237.60 $4,752 Turnout Gear Lockers EA 21 $924.00 $19,404 Aluminum Sunscreens & Canopies SF 0 $132.00 $0 Flagpoles EA 1 $1,848.00 $1,848 DIVISION 11 - EQUIPMENT $30,314 Gas Range EA 1 $13,919.40 $13,919 Refrigerator EA 2 $2,508.00 $5,016 Microwave EA 1 $950.40 $950 Dishwasher EA 1 $1,584.00 $1,584 Undercounter Ice Maker EA 1 $3,036.00 $3,036 Equipment Installation LS 1 $2,640.00 $2,640 Stainless Steel Countertops SF 48 $66.00 $3,168 DIVISION 12 - FURNISHINGS $12,130 Window Roller Shades EA 13 $316.80 $3,120 Entrance Mats SF 170 $69.96 $9,010 DIVISION 14 - CONVEYING EQUIPMENT $0 Holeless Hydraulic Elevator EA 0 $101,640.00 $0 DIVISION 21 - FIRE SUPPRESSION $58,648 NFPA 13 Fire Suppression System GSF 14,810 $3.96 $58,648 DIVISION 22 - PLUMBING $410,978 Water, Sewer, Natural Gas, Compressed Air GSF 14,810 $27.75 $410,978 DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING $833,063 VRV System, Ductwork, Exhaust Fans, Louvers GSF 14,810 $56.25 $833,063 Geo- Thermal Well Field, pumps, header, etc. LS 1 $490,000 DIVISION 26 - ELECTRICAL $925,482 Power & Lighting GSF 14,810 $52.20 $773,082 Lightning Protection System LS 1 $13,200.00 $13,200 Generator & Automatic Transfer Switch LS 1 $79,200.00 $79,200 Upgraded power demand LS 1 $60,000 16 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL DIVISION 28 - FIRE ALARM $24,437 Fire Detection & Alarm System GSF 14,810 $1.65 $24,437 DIVISION 31 - EARTHWORK $445,964 Site Grading GSF 90,215 $3.50 $315,572 Building Pad $0.00 $0 Storm Water Pollution and Erosion Control LS 1 $11,880.00 $11,880 Termite Treatment SF 14,331 $0.07 $946 DIVISION 32 - EXTERIOR IMPROVEMENTS $824,303 8" Concrete Paving SF 19,670 $9.24 $181,751 *8" Concrete Paving (Intersection and Drive) SF 34,580 $9.24 $319,519 6" Concrete Paving SF 1,504 $7.26 $10,919 4" Concrete Sidewalk SF 1,884 $6.60 $12,434 *4" Concrete Sidewalk (Intersection) SF 2,722 $6.60 $17,965 Concrete Curbs LF 1,905 $10.56 $20,117 *Concrete Curbs (Intersection) LF 985 $10.56 $10,402 Pavement Markings & Striping LS 1 $2,904.00 $2,904 *Pavement Markings & Striping (Intersection) LS 1 $3,960.00 $3,960 Ornamental Metal Fencing & Gates LF 518 $330.00 $170,940 Masonry Screening Walls LF 16 $132.00 $2,112 Irrigation LS 1 $23,760.00 $23,760 Landscaping LS 1 $47,520.00 $47,520 DIVISION 33 - UTILITIES $180,000 *Stormwater, Water, Sewer, Electrical, Comm. LS 1 $180,000.00 $180,000 Coordinate with the City of Ames BUILDING SUBTOTAL $8,326,803 COST PER SQUARE FOOT $562 USGBC LEED Silver GSF 14,810 $317,947.79 OWNERS AND CONSTRUCTION CONTINGENCY (5%)$416,340 PROBABLE CONSTRUCTION COST $9,061,654 COST PER SQUARE FOOT $612 ADD ALTERNATES $725,000 Photovoltaics Panels, Batteries, Panels, Computer System LS 1 $725,000 *if photovoltaics are not used, geothermal cost will increase OWNERS AND CONSTRUCTION CONTINGENCY ADD ALTERNATES (5%)$36,275 PROBABLE CONSTRUCTION COST (WITH ADD ALTERNATES) $9,822,929 COST PER SQUARE FOOT (WITH ADD ALTERNATES) $663 OWNER PROVIDED ITEMS & SERVICES (Not Included in Construction Cost) Architectural/Engineering Fees Construction Materials Testing Radio & Antenna Systems Data & Communications Equipment (Servers, Computers, Printers, TVs & Phones) 17 DIVISION / DESCRIPTION UNIT QUANTITY COST/UNIT COST SUB TOTAL Applicances & Equipment Movable Furniture & Matresses Weight/Exercise Equipment Cookware, Dishes, & Utensils Utilities & Connection Fees (Water and Electric) Utilities & Connection Fees (Electric) Project Management Services 18