BACKGROUND:
This program is for restoration of the right-of-way areas associated with various Capital
Improvements Plan (CIP) projects. Disturbed right-of-way (ROW) areas are restored using
seed or dormant seed. A list of project locations is attached.
The success of restoration is volatile and appears to depend on the weather at and following
the time of installation. The ROW Restoration program allows the City to bring in one
contractor who specializes in seeding to restore several locations with improved quality. All
locations included within this project, including those added by change order have been
restored. Two change orders have been approved for this contract:
Change Order No. 1 in the amount of $3,080 was approved by staff to address additional
erosion control on slopes.
Change Order No. 2 was approved by the City Manager's office in the deduct amount of
$32,337.42. This change order reflected final field measurements with reduction in the amount
of watering needed to reestablish green spaces.
Funding for the Right-of-Way Restoration program is included annually in the CIP from
multiple operating funds. The table below indicates the funding included in this project from
the FY 2021/22 and FY 2022/23 CIP programs.
Funding Source Revenue Expenses
FY 2021/22 Road Use Tax Fund $125,000
FY 2021/22 Water Utility Fund 75,000
FY 2021/22 Sewer Utility Fund 75,000
FY 2021/22 Storm Sewer Utility Fund 50,000
FY 2022/23 Road Use Tax Fund 125,000
FY 2022/23 Water Utility Fund 75,000
FY 2022/23 Sewer Utility Fund 75,000
FY 2022/23 Storm Sewer Utility Fund 50,000
2022/23 ROW Restoration Contract $278,183.20
Change Order 1 3,080.00
Change Order 2 (32,337.42)
2022/23 ROW Restoration Contract Administration 55,022.00
TOTAL $650,000 $303,947.78
1
All unspent funding will be carried over into the Right-of-Way Restoration program for future
CIP projects.
ALTERNATIVES:
1. Accept the 2022/23 Right-of-Way Restoration as completed by Country Landscapes, of
Ames, IA, in the amount of $248,925.78
2. Direct staff to pursue modifications to the project.
CITY MANAGER'S RECOMMENDED ACTION:
This project has been completed in accordance with the approved plans and
specifications. Therefore, it is the recommendation of the City Manager that the City Council
adopt Alternative No. 1, as noted above.
ATTACHMENT(S):
2022-23 RIGHT-OF-WAY RESTORATION LOCATIONS.pdf
Certification Letter 2022-23 Right of Way Restoration.pdf
2
2022-23 ROW Restoration Locations
SITE #STREET FROM TO CIP LOCATION
North 2nd St North Elm Ave North Maple Ave
South Kellogg Ave South 2nd St South 3rd St
2 Alley Duff Ave Sherman Ave 2021/22 Downtown Street Improvements
3 Hoover Ave 24th St Top-O-Hollow Rd 2021/22 Collector Street Pavement Improvements
Opal Dr Jewel Dr Crystal St
Opal Circle Opal Dr East End
Harcourt Dr Garnet Dr Jewel Dr
Turquoise Circle Onyx St South End
Top-O-Hollow Rd Bloomington Rd Dawes Dr
5 Stafford Ave 13th S. End 2021/22 Seal Coat Streets
Brookridge Ave 6th st Ridgewood Ave
Ridgewood Ave 6th st 9th St
Lee St Brookridge Ave Ridgewood Ave
9th St Brookridge Ave Northwestern Ave
Park Way Brookridge Ave Ridgewood Ave
Alley 6th st Lee St
Oakwood Rd State Ave University Blvd
28th St Hoover Ave Ferndale Ave
8 Murray Dr Norhtwestern Grand 2022/23 Seal Coat Street Pavement Improvements
10 Various locations 22/23 Clear Water Diversion
11 Lincoln Way Wilder Ave County Line Road Ames Plan 2040 Water
Grand Ave 6th St Murray
S Duff Ave Lincoln Way S 5th
South 17th South Kellogg ave End
South Kellogg Ave South 17th South 16th St.
Ford St South Dayton Bell Ave
Bell Ave E Lincoln Way Ford St
12 2021/22 Water System Improvement & Water Main
Replacement
2020/21 Concrete Pavement Improvements (Patching)13
1
4 2021/22 Asphalt Street Pavement Improvements
North/South Alley (between
Douglas Ave & Duff Ave)9 5th St 6th St 2022/23 Downtown Street Pavement Improvements
2021/22 Concrete Pavement Improvements
6 2022/23 Concrete Pavement Improvements
2022/23 Asphalt Street Pavement Improvements7
3
Smart Choice
Public Works Department 515.239.5160 main 515 Clark Ave. P.O. Box 811
515.239.5404 fax Ames, IA 50010
www.CityofAmes.org
July 15, 2025
Honorable Mayor and Council Members
City of Ames
Ames, Iowa 50010
Dear Mayor and Council Members:
I hereby certify the 2022/23 Right-of-Way Restoration project was completed in an
acceptable manner by Country Landscapes, of Ames, Iowa, in the amount of $248,925.78 and
was inspected by the Public Works Department of the City of Ames, Iowa.
Sincerely,
cc: City Clerk, Finance, Contractor, Administrative Services, Project File