HomeMy WebLinkAboutA012 - Resolution approving preliminary plans and specifications for the 2024/25 Water System Improvements Program (E. 14th St & Meadowlane Ave) projectITEM #:14 DATE:07-22-25 DEPT:PW SUBJECT:2024/25 WATER SYSTEM IMPROVEMENTS PROGRAM (E. 14TH STREET & MEADOWLANE AVENUE) COUNCIL ACTION FORM BACKGROUND: The Water System Improvements program provides for replacing water mains in areas that are experiencing rusty water problems. It also provides for installing larger distribution mains in areas that have a high concentration of 4” and 6" supply lines, transferring water services from 4” and 6" water mains in streets where larger water mains exist, and abandoning 4” water mains. Eliminating duplicate water mains, where possible, improves water flow and helps reduce rusty water. This project will include improvements on E. 14th Street from Meadowlane Avenue to Glendale Avenue and Meadowlane Avenue from E. 13th Street to E. 14th Street. City staff has completed plans and specifications for this project with revenue and estimated expenses as follows: Funding Source Available Revenue Estimated Expenses 2024/25 Water System Improvement Program $ 380,000 Construction $ 330,216 Engineering/Administration 45,000 TOTAL $ 380,000 $ 375,216 The water infrastructure along E. 14th Street and Meadowlane Avenue is in urgent need of replacement. Residents on both streets have been experiencing persistent issues with elevated iron levels in their water supply. While City staff has installed iron filters at several homes to help reduce iron levels, this has not fully resolved the problem. Replacing the water main along these two streets is anticipated to address the issue more effectively. Carryover funding remaining in the FY 2024/25 Water System Improvements fund is available to complete this project. ALTERNATIVES: 1. Approve plans and specifications for the 2024/25 Water System Improvements Program (E. 14th Street & Meadowlane Avenue) project, setting August 6, 2025, as the bid due date and August 12, 2025, as the date of Public Hearing. 2. Direct staff to revise the project. 1 CITY MANAGER'S RECOMMENDED ACTION: By improving the water distribution system in these neighborhoods, residents will see improved water quality and firefighting capacity. Therefore, it is the recommendation of the City Manager that the City Council adopt Alternative No. 1, as described above. ATTACHMENT(S): E. 14th & Meadowlane Water.pdf 2 2025/26 Water System Improvements Program Open trenching Sanitary Force main on South side of East Lincoln Way Lift Station Single Lane Alternating Traffic North Side of intersectionS 16TH ST S D U F F A V E GO L D E N A S P E N D R S K E L L O G G A V E BU C K E Y E A V E ASPEN RIDGE RD ¯E 14th Street - Glendale Ave to Meadowlane Ave Meadowlane Ave - E 13th St to E. 14th St Vet Med Trail Box Culvert D D D D D D D D D D D D D D D D !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 #* #*#*#* #* %2 %2 %2 "S "S "S "S "S "S "S "S"S !!2 !!2 S R I V E R S I D E D R AP P L E P L UNIVE R S I T Y B L V D S 16TH ST Project Location S 16TH ST S D U F F A V E GO L D E N A S P E N D R BU C K E Y E A V E S K E L L O G G A V E ASPEN RIDGE RD DD D D D D D D D D D D D DD D D D D D D D D !!2 !!2 !!2 !!2 !!2 !!2!!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 GR A N D A V E RO Y K E Y A V E BLOOMINGTON RD TOP O HOLLOW RD DA W E S D R POLARIS DR D D D D D D D D D D D D D D D D D D D D D D D D D D DD !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2 !!2!!2 !!2 6TH ST 5TH ST MAIN ST GR A N D A V E AL L A N D R PE A R L E A V E D D D D D D D D D D D D D D D D D DD !!2 !!2 !!2 !!2 6TH ST HO D G E A V E D D D D D D D D D D D D D !!2 !!2 !!2 !!2 6TH ST HO D G E A V E D D D D D D D D D D D D D D D D DD D D D D D D D D !!2 !!2!!2 !!2 !!2 !!2 !!2!!2 !!2 !!2 !!2 !!2 !!2 !!2S 3RD ST S 2ND ST S S H E R M A N A V E SE 2ND ST SE 3RD ST SU M N E R A V E E 13TH ST IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P E 13TH ST IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P IN T E R S T A T E 3 5 E 13TH ST IN T E R S T A T E 3 5 57 0 T H A V E IN T E R S T A T E 3 5 R A M P IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P Full Road Closure from 4/1/2024 to 4/12/2024 E 13TH ST IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P 57 0 T H A V E IN T E R S T A T E 3 5 IN T E R S T A T E 3 5 R A M P 6TH ST 7TH ST 8TH ST 9TH ST 10TH ST 13TH ST DU F F A V E 12TH ST CL A R K A V E 11TH ST GR A N D A V E BU R N E T T A V E CA R R O L L A V E E 6TH ST KE L L O G G A V E WI L S O N A V E E 13TH ST E 7TH ST E 9TH ST MA X W E L L A V E DO U G L A S A V E E 11TH ST E 12TH ST HO D G E A V E E 8TH ST HA R D I N G A V E ST A F F O R D A V E CR A W F O R D A V E 13TH ST 11TH ST DU F F A V E 12TH ST BU R N E T T A V E KE L L O G G A V E E 13TH ST E 12TH ST E 11TH ST McFarland Clinic Water Shut Off Saturday After 12PM Only Pavement Removal & Replacement: Duration: 2 to 4 Days Pavement Removal & Replacement: Duration: 2 to 4 Days 1018 Kellogg Ave & 222 11th St. Water Shut Off Duration: 3 to 4 Hours 7TH ST 8TH ST 9TH ST 10TH ST 11TH ST 12TH ST DU F F A V E CL A R K A V E GR A N D A V E WI L S O N A V E BU R N E T T A V E CA R R O L L A V E E 9TH ST E 8TH ST E 7TH ST E 11TH ST DO U G L A S A V E E 12TH ST ST A F F O R D A V E E 13TH ST E 14TH ST GL E N D A L E A V E ME A D O W L A N E A V E LI N D E N D R 3