HomeMy WebLinkAboutA006 - Motion approving the Fitch Family Indoor Aquatic Center Monthly UpdateTo:Mayor and City Council
From:Keith Abraham, Parks and Recreation Director
Date:July 22, 2025
Subject:Fitch Family Indoor Aquatic Center Monthly Update
Item No. 8
MEMO
PROJECT UPDATE:
In accordance with a previous directive, staff is required to keep the City Council
informed of the construction status of the Fitch Family Indoor Aquatic Center
(FFIAC) and will provide a written update at Council's second meeting of each
month.
Additionally, staff, along with representatives from Story Construction and RDG
Planning and Design, will provide an in-person update once per quarter (January,
April, July, & October). If anything occurs during the project that requires Council
action, staff will present this in a timely manner. Due to the number of agenda
items for City Council's July 22 meeting, staff is providing a written report
this month and will provide an in-person report at Council's August 26
meeting.
In accordance with this directive, the City's Construction Manager for the project,
Story Construction, has provided a Project Status Report (Attachment A). Story
Construction and RDG Planning and Design are 96% complete with reviewing
shop drawings and submittals. This activity will continue until 100% complete.
CHANGE ORDER SUMMARY:
There were two change orders recently approved, and the changes thus far on
the project are shown on the change order log (Attachment B). Staff directed
contractors to implement the two change orders which are: 1) Increasing the
concrete thickness in the maintenance area from four to six inches ($7,029), and
2) Moving the conduit due to the increased depth of concrete in the maintenance
area ($1,007).
To date, change orders for the project total $272,869, or 12.99% of the
contingency budget. The contingency for this project is $2.1 million with a current
balance of $1,827,131. There is also $1 million set aside for mitigation of
contamination issues, which has not been used at this time.
City Clerk's Office 515.239.5105 main
515.239.5142 fax
515 Clark Ave. P.O. Box 811
Ames, IA 50010
www.CityofAmes.org
1
ATTACHMENT(S):
Attachment A - Story Construction Monthly Project Status Update 2025-7.pdf
Attachment B - Change Order Log - 7-22-25.pdf
City Clerk's Office 515.239.5105 main
515.239.5142 fax
515 Clark Ave. P.O. Box 811
Ames, IA 50010
www.CityofAmes.org
2
Fitch Family Indoor Aquatic Center
Monthly Project Status Report
July 2025
*Natatorium: Wellness, Recreation and Lap Pools
*Non-Natatorium: All supporting rooms outside of the Natatorium including Mechanical, Loading,
Locker Rooms, Offices, Main Lobby & Check-In, and the Alternate Walk Path
PROGRESS THIS PAST MONTH:
1. Lap Pool basin concrete slabs were nearly completed, and concrete walls were started.
2. Interior framing was completed for full height walls in the non-Natatorium and in-wall blocking
supports started.
3. Masonry partitions were completed in the non-Natatorium.
4. Ductwork, plumbing, sprinkler and electrical rough ins continued in the non-Natatorium.
5. Mechanical equipment and plumbing installations continued in the Aquatic and Electrical
Mechanical Rooms.
6. Curtain wall framing and glazing started on the exterior of the non-Natatorium.
7. The NW corner of the site was paved, and light pole bases were set. The NE corner of the
parking lot was demolished and graded in preparation of the NE storm structures.
8. Building Envelope Consult inspections continued for vapor barrier, pool water stop and curtain
wall glazing.
9. Building Envelope Consult Pre-install meeting was held for shower waterproofing.
10. Special inspections and testing of concrete and sitework continued.
11. MEP Commissioning Kick-Off meeting was held with mechanical and electrical contractors.
12. Submittals and Requests for Information continued to be processed between the Bid Package
Contractors, Story Construction, and RDG Planning & Design.
WORK PLANNED FOR NEXT MONTH:
1. Lap Pool concrete will be nearly completed.
2. Interior ceiling framing and partial height wall framing will be completed in the non-Natatorium.
3. Ductwork and sprinkler piping will be completed in the non-Natatorium.
4. Electrical and plumbing overhead rough ins will be completed and in-wall rough ins will
continue.
5. Plumbing in the Aquatic and Electrical Mechanical Rooms will continue.
6. Curtain wall framing and glazing will continue on the exterior of the non-Natatorium.
7. Storm structures, paving and light pole bases in the NE corner of the site will be completed.
8. Perimeter sidewalk demolition and prep will begin.
9. Alliant Energy will install the gas service and set the gas meter against the building exterior.
Page 1 of 9 3
10. Building Envelope Consult inspections will continue for vapor barrier, pool water stop and
curtain wall glazing.
11. Special inspections and testing of concrete and sitework will continue.
12. Development of the Crew Workflow Plans for the pools, interior finishes and site improvements
and parking will continue.
SCHEDULE SUMMARY:
Construction Substantial Completion Date: January 20, 2026
PROJECT PHOTOS: [Next page]
Page 2 of 9 4
Progress
Description
Taken Date
06/12/2025 at 01:25 pm
Upload Date
06/24/2025 at 11:22 am
Uploaded By
Eli Rochleau
Name
CEDC901F-BADC-42F1-B…
Story Construction Co.
Printed on Tue Jul 15, 2025 at 12:41 pm CDT
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
06/13/2025 at 08:47 am
Upload Date
06/24/2025 at 11:22 am
Uploaded By
Eli Rochleau
Name
1DCB44EF-B7D4-4A A0-…
PROJECT PHOTOS:
SITE WORK VIEW OF NW
CORNER - PREP FOR PAVING
NW CORNER OF PAVING IN
PROGRESS
Page 3 of 9 5
Aerial Photos
Description
Taken Date
07/14/2025 at 01:53 pm
Upload Date
07/14/2025 at 02:11 pm
Uploaded By
Mitch Anderson
Name
DJI_0562.JPG
Aerial Photos
Description
Taken Date
07/14/2025 at 01:52 pm
Upload Date
07/14/2025 at 02:11 pm
Uploaded By
Mitch Anderson
Name
DJI_0559.JPG
Story Construction Co.
Printed on Tue Jul 15, 2025 at 12:23 pm CDT
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
VIEW TO WEST -
NORTHEAST CORNER PREP
FOR STORM STRUCTURES
VIEW TO SOUTHEAST -
NORTHWEST PAVING
COMPLETE
Page 4 of 9 6
Progress
Description
Taken Date
06/16/2025 at 01:25 pm
Upload Date
06/24/2025 at 11:24 am
Uploaded By
Eli Rochleau
Name
7739E8D3-D9F2-4518-B…
Progress
Description
Taken Date
06/24/2025 at 09:59 am
Upload Date
06/30/2025 at 09:43 am
Uploaded By
Eli Rochleau
Name
54347ADA-EF70-41DA-8…
Story Construction Co.
Printed on Tue Jul 15, 2025 at 12:23 pm CDT
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
LAP POOL - DEEP END
BASIN SLABS AND PREP
FOR WALLS
LAP POOL NORTHEAST
BASIN SLAB PREP WITH
VAPOR BARRIER AND BAR
Page 5 of 9 7
Progress
Description
Taken Date
06/24/2025 at 11:28 am
Upload Date
06/30/2025 at 09:43 am
Uploaded By
Eli Rochleau
Name
2543C93B-1156-4F47-B…
Progress
Description
Taken Date
06/18/2025 at 11:03 am
Upload Date
06/18/2025 at 11:00 am
Uploaded By
Deb Thurmond
Name
IMG_2025_06_18_11_03…
Story Construction Co.
Printed on Tue Jul 15, 2025 at 12:23 pm CDT
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
LAP POOL NORTHEAST
SLAB BASIN CONCRETE
POUR IN PROGRESS
AQUATIC MECHANICAL RM
EQUIPMENT AND
DUCTWORK IN PROGRESS
Page 6 of 9 8
Story Construction Co.
Printed on Tue Jul 15, 2025 at 12:23 pm CDT
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
06/26/2025 at 02:19 pm
Upload Date
06/27/2025 at 03:21 pm
Uploaded By
Eli Rochleau
Name
5C1BEC98-ECDD-4103-…
Progress
Description
Taken Date
06/26/2025 at 02:18 pm
Upload Date
06/30/2025 at 09:43 am
Uploaded By
Eli Rochleau
Name
35482027-3A2B-4047-B…
LOCKER ROOM RESTROOM
DUCTWORK AND
SPRINKLER IN PROGRESS
ADMINISTRATIVE OFFICE
DUCTWORK AND
SPRINKLER IN PROGRESS
Page 7 of 9
ADMINISTRATIVE OFFICE
DUCTWORK AND
ELECTRICAL IN PROGRESS
9
Progress
Description
Taken Date
07/15/2025 at 12:47 pm
Upload Date
07/15/2025 at 12:44 pm
Uploaded By
Deb Thurmond
Name
IMG_2025_07_15_12_47…
Story Construction Co.
Printed on Tue Jul 15, 2025 at 12:23 pm CDT
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
07/15/2025 at 12:48 pm
Upload Date
07/15/2025 at 12:44 pm
Uploaded By
Deb Thurmond
Name
IMG_2025_07_15_12_48…
WALK PATH / MULTI PURPOSE
ROOMS FRAMING IN
PROGRESS
LOCKER ROOM CORRIDOR
VIEW TO WEST
Page 8 of 9
LOCKER ROOM CORRIDOR
FRAMING VIEW TO WEST
10
Story Construction Co.
Printed on Tue Jul 15, 2025 at 12:23 pm CDT
Job #: 23401-01 Fitch Family Indoor Aquatic Center
115 N Elm Avenue
Ames, Iowa 50010
Progress
Description
Taken Date
07/15/2025 at 12:46 pm
Upload Date
07/15/2025 at 12:43 pm
Uploaded By
Deb Thurmond
Name
IMG_2025_07_15_12_46…
NORTH ELEVATION
CURTAIN WALL GLAZING
IN PROGRESS
Page 9 of 9 11
Contractor Change
Order #Description Amount Balance
Beginning Contingency
Balance $ 2,100,000
All Star Concrete 1 Precast Enbeds Install Change Contracts $ 10,010 $ 2,089,990
All Star Concrete 2 Increase Concrete Thickness in Maintenance Area $ 7,029 $ 2,082,961
Core Construction 1 IDPH Permit Review, Precast Panel Joint Mods, Mechanical Louver
Mods, Steel Lintel, Precast Enbeds Install Change Contracts $ 22,065 $ 2,060,896
Core Construction 2 Misc. Structural Revisions & South Elevation Glazing Revised $ 3,979 $ 2,056,917
Core Construction 3 Geared Trolley and Hoist $ (2,952) $ 2,059,869
Core Construction 4 Sink Countertop Brackets $ (1,203) $ 2,061,072
Core Construction 5 Channel Support $ 3,739 $ 2,057,333
Forrest & Associates 1 Channel Support $ 1,163 $ 2,056,170
Lansink Construction 1 Wet Room Door Change, Multipurpose Room Cubbies $ 42,129 $ 2,014,041
Lansink Construction 2 Door 115A Change to FRP $ 2,858 $ 2,011,183
Lansink Construction 3 Interior Finishes $ 3,021 $ 2,008,162
Lansink Construction 4 Check-In Standing Desk $ 3,995 $ 2,004,167
Lansink Construction 5 Sink Countertop Brackets $ 1,639 $ 2,002,528
Lansink Construction 6 Wood Blocking $ 752 $ 2,001,776
Central States Roofing 1 IDPH Permit Review, Mechanical Louver Mods $ 1,647 $ 2,000,129
Central States Roofing 2 Roofing Over Hollow Core $ 5,116 $ 1,995,013
Orning Glass Company 1 Wet Room Door Changes $ (3,823) $ 1,998,836
Orning Glass Company 2 Window Frit Revisions $ 1,743 $ 1,997,093
Hilsabek Schacht 1 Wet Room Door Change $ - $ 1,997,093
Hilsabek Schacht 2 Door 115A Change to FRP $ - $ 1,997,093
Hilsabek Schacht 3 Donor Wall Drywall $ 3,557 $ 1,993,536
Hilsabek Schacht 4 Site Signage $ (350) $ 1,993,886
Hilsabek Schacht 5 Precast Pocket Covers $ 2,598 $ 1,991,288
Sande Construction 1 IDPH Permit Review Updates $ 1,370 $ 1,989,918
Sande Construction 2 CO2 Tank Distribution Piping $ 2,692 $ 1,987,226
Brockway Mechanical 1 Hydronic Pumps Flow Update $ (2,320) $ 1,989,546
Brockway Mechanical 2 IDPH Permit Review Updates, 6" Storm Drain Relocation, Mechanical
Louver Mods, Glycol Feed Dual Pump $ 38,702 $ 1,950,844
Brockway Mechanical 3 State Requirements $ 12,033 $ 1,938,811
Van Maanen Electric 1 IDPH Permit Review Updates $ 21,953 $ 1,916,858
Van Maanen Electric 2 Transformer Relocate $ 14,237 $ 1,902,621
Van Maanen Electric 3 Light Fixture SWA Dimming $ 4,679 $ 1,897,942
Van Maanen Electric 4 Conduit Change Due to Increasing Concrete Thickness in Maintenance
Area $ 1,007 $ 1,896,935
Con-Struct 1 Water Service Disconnect $ 7,747 $ 1,889,188
Con-Struct 2 Building Rubble Removal $ 45,419 $ 1,843,769
Iowa Pipe & Grading 1 Storm & Existing Water Utility Conflict & Sanitary Tie in at N. 2nd
Ave $ 14,518 $ 1,829,251
Lakeside 1 Site Signage $ 2,120 $ 1,827,131
Totals / Current Balance $ 272,869 $ 1,827,131
FITCH FAMILY INDOOR AQUATIC CENTER
CHANGE ORDER LOG
(As of 7/22/25)
Highlighted Rows Indicate New Change Orders Since the Last Update
12