HomeMy WebLinkAboutA006 - Motion approving the Fitch Family Indoor Aquatic Center Monthly UpdateTo:Mayor and City Council From:Keith Abraham, Parks and Recreation Director Date:July 22, 2025 Subject:Fitch Family Indoor Aquatic Center Monthly Update Item No. 8 MEMO PROJECT UPDATE: In accordance with a previous directive, staff is required to keep the City Council informed of the construction status of the Fitch Family Indoor Aquatic Center (FFIAC) and will provide a written update at Council's second meeting of each month. Additionally, staff, along with representatives from Story Construction and RDG Planning and Design, will provide an in-person update once per quarter (January, April, July, & October). If anything occurs during the project that requires Council action, staff will present this in a timely manner. Due to the number of agenda items for City Council's July 22 meeting, staff is providing a written report this month and will provide an in-person report at Council's August 26 meeting. In accordance with this directive, the City's Construction Manager for the project, Story Construction, has provided a Project Status Report (Attachment A). Story Construction and RDG Planning and Design are 96% complete with reviewing shop drawings and submittals. This activity will continue until 100% complete. CHANGE ORDER SUMMARY: There were two change orders recently approved, and the changes thus far on the project are shown on the change order log (Attachment B). Staff directed contractors to implement the two change orders which are: 1) Increasing the concrete thickness in the maintenance area from four to six inches ($7,029), and 2) Moving the conduit due to the increased depth of concrete in the maintenance area ($1,007). To date, change orders for the project total $272,869, or 12.99% of the contingency budget. The contingency for this project is $2.1 million with a current balance of $1,827,131. There is also $1 million set aside for mitigation of contamination issues, which has not been used at this time. City Clerk's Office 515.239.5105 main 515.239.5142 fax 515 Clark Ave. P.O. Box 811 Ames, IA 50010 www.CityofAmes.org 1 ATTACHMENT(S): Attachment A - Story Construction Monthly Project Status Update 2025-7.pdf Attachment B - Change Order Log - 7-22-25.pdf City Clerk's Office 515.239.5105 main 515.239.5142 fax 515 Clark Ave. P.O. Box 811 Ames, IA 50010 www.CityofAmes.org 2 Fitch Family Indoor Aquatic Center Monthly Project Status Report July 2025 *Natatorium: Wellness, Recreation and Lap Pools *Non-Natatorium: All supporting rooms outside of the Natatorium including Mechanical, Loading, Locker Rooms, Offices, Main Lobby & Check-In, and the Alternate Walk Path PROGRESS THIS PAST MONTH: 1. Lap Pool basin concrete slabs were nearly completed, and concrete walls were started. 2. Interior framing was completed for full height walls in the non-Natatorium and in-wall blocking supports started. 3. Masonry partitions were completed in the non-Natatorium. 4. Ductwork, plumbing, sprinkler and electrical rough ins continued in the non-Natatorium. 5. Mechanical equipment and plumbing installations continued in the Aquatic and Electrical Mechanical Rooms. 6. Curtain wall framing and glazing started on the exterior of the non-Natatorium. 7. The NW corner of the site was paved, and light pole bases were set. The NE corner of the parking lot was demolished and graded in preparation of the NE storm structures. 8. Building Envelope Consult inspections continued for vapor barrier, pool water stop and curtain wall glazing. 9. Building Envelope Consult Pre-install meeting was held for shower waterproofing. 10. Special inspections and testing of concrete and sitework continued. 11. MEP Commissioning Kick-Off meeting was held with mechanical and electrical contractors. 12. Submittals and Requests for Information continued to be processed between the Bid Package Contractors, Story Construction, and RDG Planning & Design. WORK PLANNED FOR NEXT MONTH: 1. Lap Pool concrete will be nearly completed. 2. Interior ceiling framing and partial height wall framing will be completed in the non-Natatorium. 3. Ductwork and sprinkler piping will be completed in the non-Natatorium. 4. Electrical and plumbing overhead rough ins will be completed and in-wall rough ins will continue. 5. Plumbing in the Aquatic and Electrical Mechanical Rooms will continue. 6. Curtain wall framing and glazing will continue on the exterior of the non-Natatorium. 7. Storm structures, paving and light pole bases in the NE corner of the site will be completed. 8. Perimeter sidewalk demolition and prep will begin. 9. Alliant Energy will install the gas service and set the gas meter against the building exterior. Page 1 of 9 3 10. Building Envelope Consult inspections will continue for vapor barrier, pool water stop and curtain wall glazing. 11. Special inspections and testing of concrete and sitework will continue. 12. Development of the Crew Workflow Plans for the pools, interior finishes and site improvements and parking will continue. SCHEDULE SUMMARY: Construction Substantial Completion Date: January 20, 2026 PROJECT PHOTOS: [Next page] Page 2 of 9 4 Progress Description Taken Date 06/12/2025 at 01:25 pm Upload Date 06/24/2025 at 11:22 am Uploaded By Eli Rochleau Name CEDC901F-BADC-42F1-B… Story Construction Co. Printed on Tue Jul 15, 2025 at 12:41 pm CDT Job #: 23401-01 Fitch Family Indoor Aquatic Center 115 N Elm Avenue Ames, Iowa 50010 Progress Description Taken Date 06/13/2025 at 08:47 am Upload Date 06/24/2025 at 11:22 am Uploaded By Eli Rochleau Name 1DCB44EF-B7D4-4A A0-… PROJECT PHOTOS: SITE WORK VIEW OF NW CORNER - PREP FOR PAVING NW CORNER OF PAVING IN PROGRESS Page 3 of 9 5 Aerial Photos Description Taken Date 07/14/2025 at 01:53 pm Upload Date 07/14/2025 at 02:11 pm Uploaded By Mitch Anderson Name DJI_0562.JPG Aerial Photos Description Taken Date 07/14/2025 at 01:52 pm Upload Date 07/14/2025 at 02:11 pm Uploaded By Mitch Anderson Name DJI_0559.JPG Story Construction Co. Printed on Tue Jul 15, 2025 at 12:23 pm CDT Job #: 23401-01 Fitch Family Indoor Aquatic Center 115 N Elm Avenue Ames, Iowa 50010 VIEW TO WEST - NORTHEAST CORNER PREP FOR STORM STRUCTURES VIEW TO SOUTHEAST - NORTHWEST PAVING COMPLETE Page 4 of 9 6 Progress Description Taken Date 06/16/2025 at 01:25 pm Upload Date 06/24/2025 at 11:24 am Uploaded By Eli Rochleau Name 7739E8D3-D9F2-4518-B… Progress Description Taken Date 06/24/2025 at 09:59 am Upload Date 06/30/2025 at 09:43 am Uploaded By Eli Rochleau Name 54347ADA-EF70-41DA-8… Story Construction Co. Printed on Tue Jul 15, 2025 at 12:23 pm CDT Job #: 23401-01 Fitch Family Indoor Aquatic Center 115 N Elm Avenue Ames, Iowa 50010 LAP POOL - DEEP END BASIN SLABS AND PREP FOR WALLS LAP POOL NORTHEAST BASIN SLAB PREP WITH VAPOR BARRIER AND BAR Page 5 of 9 7 Progress Description Taken Date 06/24/2025 at 11:28 am Upload Date 06/30/2025 at 09:43 am Uploaded By Eli Rochleau Name 2543C93B-1156-4F47-B… Progress Description Taken Date 06/18/2025 at 11:03 am Upload Date 06/18/2025 at 11:00 am Uploaded By Deb Thurmond Name IMG_2025_06_18_11_03… Story Construction Co. Printed on Tue Jul 15, 2025 at 12:23 pm CDT Job #: 23401-01 Fitch Family Indoor Aquatic Center 115 N Elm Avenue Ames, Iowa 50010 LAP POOL NORTHEAST SLAB BASIN CONCRETE POUR IN PROGRESS AQUATIC MECHANICAL RM EQUIPMENT AND DUCTWORK IN PROGRESS Page 6 of 9 8 Story Construction Co. Printed on Tue Jul 15, 2025 at 12:23 pm CDT Job #: 23401-01 Fitch Family Indoor Aquatic Center 115 N Elm Avenue Ames, Iowa 50010 Progress Description Taken Date 06/26/2025 at 02:19 pm Upload Date 06/27/2025 at 03:21 pm Uploaded By Eli Rochleau Name 5C1BEC98-ECDD-4103-… Progress Description Taken Date 06/26/2025 at 02:18 pm Upload Date 06/30/2025 at 09:43 am Uploaded By Eli Rochleau Name 35482027-3A2B-4047-B… LOCKER ROOM RESTROOM DUCTWORK AND SPRINKLER IN PROGRESS ADMINISTRATIVE OFFICE DUCTWORK AND SPRINKLER IN PROGRESS Page 7 of 9 ADMINISTRATIVE OFFICE DUCTWORK AND ELECTRICAL IN PROGRESS 9 Progress Description Taken Date 07/15/2025 at 12:47 pm Upload Date 07/15/2025 at 12:44 pm Uploaded By Deb Thurmond Name IMG_2025_07_15_12_47… Story Construction Co. Printed on Tue Jul 15, 2025 at 12:23 pm CDT Job #: 23401-01 Fitch Family Indoor Aquatic Center 115 N Elm Avenue Ames, Iowa 50010 Progress Description Taken Date 07/15/2025 at 12:48 pm Upload Date 07/15/2025 at 12:44 pm Uploaded By Deb Thurmond Name IMG_2025_07_15_12_48… WALK PATH / MULTI PURPOSE ROOMS FRAMING IN PROGRESS LOCKER ROOM CORRIDOR VIEW TO WEST Page 8 of 9 LOCKER ROOM CORRIDOR FRAMING VIEW TO WEST 10 Story Construction Co. Printed on Tue Jul 15, 2025 at 12:23 pm CDT Job #: 23401-01 Fitch Family Indoor Aquatic Center 115 N Elm Avenue Ames, Iowa 50010 Progress Description Taken Date 07/15/2025 at 12:46 pm Upload Date 07/15/2025 at 12:43 pm Uploaded By Deb Thurmond Name IMG_2025_07_15_12_46… NORTH ELEVATION CURTAIN WALL GLAZING IN PROGRESS Page 9 of 9 11 Contractor Change Order #Description Amount Balance Beginning Contingency Balance $ 2,100,000 All Star Concrete 1 Precast Enbeds Install Change Contracts $ 10,010 $ 2,089,990 All Star Concrete 2 Increase Concrete Thickness in Maintenance Area $ 7,029 $ 2,082,961 Core Construction 1 IDPH Permit Review, Precast Panel Joint Mods, Mechanical Louver Mods, Steel Lintel, Precast Enbeds Install Change Contracts $ 22,065 $ 2,060,896 Core Construction 2 Misc. Structural Revisions & South Elevation Glazing Revised $ 3,979 $ 2,056,917 Core Construction 3 Geared Trolley and Hoist $ (2,952) $ 2,059,869 Core Construction 4 Sink Countertop Brackets $ (1,203) $ 2,061,072 Core Construction 5 Channel Support $ 3,739 $ 2,057,333 Forrest & Associates 1 Channel Support $ 1,163 $ 2,056,170 Lansink Construction 1 Wet Room Door Change, Multipurpose Room Cubbies $ 42,129 $ 2,014,041 Lansink Construction 2 Door 115A Change to FRP $ 2,858 $ 2,011,183 Lansink Construction 3 Interior Finishes $ 3,021 $ 2,008,162 Lansink Construction 4 Check-In Standing Desk $ 3,995 $ 2,004,167 Lansink Construction 5 Sink Countertop Brackets $ 1,639 $ 2,002,528 Lansink Construction 6 Wood Blocking $ 752 $ 2,001,776 Central States Roofing 1 IDPH Permit Review, Mechanical Louver Mods $ 1,647 $ 2,000,129 Central States Roofing 2 Roofing Over Hollow Core $ 5,116 $ 1,995,013 Orning Glass Company 1 Wet Room Door Changes $ (3,823) $ 1,998,836 Orning Glass Company 2 Window Frit Revisions $ 1,743 $ 1,997,093 Hilsabek Schacht 1 Wet Room Door Change $ - $ 1,997,093 Hilsabek Schacht 2 Door 115A Change to FRP $ - $ 1,997,093 Hilsabek Schacht 3 Donor Wall Drywall $ 3,557 $ 1,993,536 Hilsabek Schacht 4 Site Signage $ (350) $ 1,993,886 Hilsabek Schacht 5 Precast Pocket Covers $ 2,598 $ 1,991,288 Sande Construction 1 IDPH Permit Review Updates $ 1,370 $ 1,989,918 Sande Construction 2 CO2 Tank Distribution Piping $ 2,692 $ 1,987,226 Brockway Mechanical 1 Hydronic Pumps Flow Update $ (2,320) $ 1,989,546 Brockway Mechanical 2 IDPH Permit Review Updates, 6" Storm Drain Relocation, Mechanical Louver Mods, Glycol Feed Dual Pump $ 38,702 $ 1,950,844 Brockway Mechanical 3 State Requirements $ 12,033 $ 1,938,811 Van Maanen Electric 1 IDPH Permit Review Updates $ 21,953 $ 1,916,858 Van Maanen Electric 2 Transformer Relocate $ 14,237 $ 1,902,621 Van Maanen Electric 3 Light Fixture SWA Dimming $ 4,679 $ 1,897,942 Van Maanen Electric 4 Conduit Change Due to Increasing Concrete Thickness in Maintenance Area $ 1,007 $ 1,896,935 Con-Struct 1 Water Service Disconnect $ 7,747 $ 1,889,188 Con-Struct 2 Building Rubble Removal $ 45,419 $ 1,843,769 Iowa Pipe & Grading 1 Storm & Existing Water Utility Conflict & Sanitary Tie in at N. 2nd Ave $ 14,518 $ 1,829,251 Lakeside 1 Site Signage $ 2,120 $ 1,827,131 Totals / Current Balance $ 272,869 $ 1,827,131 FITCH FAMILY INDOOR AQUATIC CENTER CHANGE ORDER LOG (As of 7/22/25) Highlighted Rows Indicate New Change Orders Since the Last Update 12