Loading...
HomeMy WebLinkAbout~Master - Approving Change Order No. 5 with Woodruff Construction of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 Project in the deduct amount of $40,743.03 RESOLUTION NO. 25-405 RESOLUTION APPROVING CHANGE ORDER NO. 5 ON CONTRACT WITH WOODRUFF CONSTRUCTION, OF AMES, IA, FOR WATER POLLUTION CONTROL FACILITY NUTRIENT REDUCTION MODIFICATIONS PHASE 1 PROJECT FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 5, a deduction in the amount of $40,743.03, on contract with Woodruff Construction, of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 12th day of August, 2025. _______________________________ _________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Gartin Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 12th day of August, 2025.