HomeMy WebLinkAbout~Master - Approving Change Order No. 5 with Woodruff Construction of Ames, IA, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 Project in the deduct amount of $40,743.03
RESOLUTION NO. 25-405
RESOLUTION APPROVING CHANGE ORDER NO. 5
ON CONTRACT WITH WOODRUFF CONSTRUCTION, OF AMES, IA,
FOR WATER POLLUTION CONTROL FACILITY NUTRIENT REDUCTION
MODIFICATIONS PHASE 1 PROJECT
FOR THE CITY OF AMES, IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper
on the above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames,
Iowa, that Change Order No. 5, a deduction in the amount of $40,743.03, on contract
with Woodruff Construction, of Ames, IA, for the Water Pollution Control Facility
Nutrient Reduction Modifications Phase 1 Project be approved and adopted as attached
hereto and made a part hereof by this reference.
ADOPTED THIS 12th day of August, 2025.
_______________________________ _________________________________
Renee Hall, City Clerk John A. Haila, Mayor
Introduced by: Gartin
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 12th day of August, 2025.