HomeMy WebLinkAbout~Master - Approving partial completion of public improvements and reducing financial security on file for Ansley Subdivision 3rd Addition to $227,094.50RESOLUTION NO. 25-381
RESOLUTION ACCEPTING PARTIAL COMPLETION OF
PUBLIC IMPROVEMENTS REQUIRED FOR
ANSLEY 3RD ADDITION
FOR THE CITY OF AMES, IOWA
BE IT RESOLVED, by the City Council of the City of Ames, Iowa:
Section One. In accordance with the Certificate of the Public Works Department,
sanitary sewer main, sanitary sewer stubs, water main & fittings, water service stubs, gate
valve, fire hydrant, sanitary manholes, storm pipe, footing drain collectors, storm sewer
service stubs, storm sewer manholes, and intakes required as a condition for approval of
the Final Plat of the above-named Subdivision has/have been completed in an acceptable
manner.
Section Two. The financial guarantee given to secure performance of the public
improvements is hereby reduced to $227,094.50 for the remaining work that includes
COSESCO (erosion control), sidewalk, pedestrian ramps, subgrade preparation, HMA
pavement, PCC pavement, curb and gutter, pavement markings, street trees, street
lights, and seeding.
ADOPTED THIS 22nd day of July, 2025.
_______________________________ _________________________________
Renee Hall, City Clerk John A. Haila, Mayor
Introduced by: Betcher
Seconded by: Gartin
Voting aye: Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: Beatty-Hansen
Resolution declared adopted and signed by the Mayor this 22nd day of July, 2025.