HomeMy WebLinkAbout~Master - Approving Change Order No. 3, the balancing change order, a deduction in the amount of $57,860.86 for the 2023/24 Arterial Street Pavement Improvements - (Airport Rd. - University Blvd. to S. Riverside Dr.)RESOLUTION NO. 25-254
RESOLUTION APPROVING CHANGE ORDER NO. 3
ON CONTRACT WITH ALL STAR CONCRETE LLC OF JOHNSTON, IOWA
FOR 2023/24 ARTERIAL STREET PAVEMENT IMPROVEMENTS
(AIRPORT RD. - UNIVERSITY BLVD. TO S. RIVERSIDE DR.)
FOR THE CITY OF AMES, IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper
on the above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames,
Iowa, that Change Order No. 3, a deduction in the amount of $57,860.86 on contract with
All Star Concrete LLC of Johnston, Iowa, for the 2023/24 Arterial Street Pavement
Improvements (Airport Rd. - University Blvd. to S. Riverside Dr.) be approved and
adopted as attached hereto and made a part hereof by this reference.
ADOPTED THIS 27th day of May, 2025.
_______________________________ _________________________________
Renee Hall, City Clerk John A. Haila, Mayor
Introduced by: Corrieri
Seconded by: Betcher
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 27th day of May, 2025.