HomeMy WebLinkAboutA001 - Motion approving Draft FY 2026 Transportation Planning Work Program and setting May 27, 2025, as date of public hearingITEM #:1 DATE:03-25-25 DEPT:AAMPO SUBJECT:DRAFT FY 2026 TRANSPORTATION PLANNING WORK PROGRAM TRANSPORTATION POLICY COMMITTEE ACTION FORM BACKGROUND: The Fiscal Year 2026 Transportation Planning Work Program (TPWP) (see Attachment A) is the regional work plan developed by the Ames Area Metropolitan Planning Organization (AAMPO) for the fiscal year beginning July 1, 2025, and ending June 30, 2026. The TPWP is a requirement of 23 CFR 450.308 for metropolitan planning organizations to develop a document identifying work proposed for the next one-year period by major activity and task. The document includes details to indicate who will perform the planning activity, the schedule for completing the activity, what products should result from each activity, funding for each activity, as well as a total program budget. The following table details both the revenues and the expenses of the MPO's FY 2026 budget: Revenue Source Amount Expense Category Amount FHWA PL Carryover $30,057 1 – Administration $50,000 FTA 5305d Carryover $3,913 2 – Transportation Improvement Program $8,000 FHWA PL Comp. Streets Carryover $3 3 – Transit Planning $50,000 FHWA PL New $128,075 4 – Comprehensive Planning $20,000 FTA 5305d New $49,269 5 – Complete Streets $3,286 FHWA STBG New $311,086 6 – Long-Range Planning $145,000 Comp. Streets Set-Aside New $3,283 7 – Transportation Data $155,000 Iowa DOT HSIP-SWAP $2,400 8 – Special Studies $250,000 Local Match (Ames Local Road Use Tax Fund)$133,200 SS4A Discretionary Grant $20,000 FY26 TOTAL REVENUE:$681,286 FY26 TOTAL EXPENSES:$681,286 REVENUE: Each fiscal year, the Iowa DOT allocates Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) funding to each of the Iowa MPOs for use in conducting the planning activities identified in their TPWPs. However, most of these funding sources require a 20% local match. For the AAMPO, this local match comes from the City of Ames Local Road Use Tax Fund. The AAMPO was also awarded a $100,000 Safe Streets and Roads for All (SS4A) discretionary grant in December 2023 for the creation of a Comprehensive Safety Action Plan (CSAP). The AAMPO expects to have leveraged $80,000 of that grant by the end of FY 2025, meaning $20,000 will still be remaining for use in FY 2026 to finish development of the CSAP. 1 EXPENSES: Starting on page 12, the FY 2026 TPWP organizes the anticipated planning activities to be performed by the AAMPO into 8 work elements. These elements are: 1. Administration 2. Transportation Improvement Program (TIP) 3. Transit Planning 4. Comprehensive Planning 5. Complete Streets 6. Long-Range Transportation Planning a. Long-Range Planning b. Metropolitan Transportation Plan (MTP) Consultant c. SS4A Comprehensive Safety Action Plan Consultant 7. Transportation Data a. Data Management b. Traffic Data Procurement c. Pavement Data Procurement 8. Special Studies a. TSMO/Regional ITS Architecture Document Consultant b. Duff Ave (Main St – 13th St) Study Consultant Page 28 of the FY 2026 TPWP shows a comprehensive budget table which details the budgeted amount allocated to each of the eight work elements and their sub-activities. The AAMPO has budgeted a total of $681,286 in FY 2026. There are no budgeted unobligated federal funds. The budget and unobligated amount conform with the MPO/RPA Carryover Policy described in Appendix E of the TPWP. NEXT STEPS: The Transportation Technical Committee reviewed and unanimously recommended approval of the Draft FY 2026 TPWP. The next step in the approval process after review and approval by the Transportation Policy Committee will be a review of the draft by the Iowa DOT and federal partners, who will provide comments back to the AAMPO by May 1, 2025. A public comment period will also occur from March 26, 2025, to April 30, 2025. After all comments received from the Iowa DOT, federal partners, and the public are incorporated into the final document, a public hearing on final approval of the FY 2026 TPWP will occur on May 27, 2025. The final document is due to the Iowa DOT and federal partners by May 30, 2025. Once fully approved, the FY 2026 Transportation Planning Work Program will be effective from July 1, 2025, through June 30, 2026. All MPO planning activities and processes conducted during this time must conform with the work program. ALTERNATIVES: 1. Approve the Draft FY 2026 Transportation Planning Work Program and set May 27, 2025, as the date of public hearing. 2. Modify the Draft FY 2026 Transportation Planning Work Program and set May 27, 2025, as the date of public hearing. 2 MPO DIRECTOR'S RECOMMENDED ACTION: The Transportation Technical Committee has reviewed the Draft FY 2026 Transportation Planning Work Program and unanimously recommends approval. This establishes the work to be performed over the next fiscal year, including the completion of the Metropolitan Transportation Plan update and the Comprehensive Safety Action Plan. Therefore, it is the recommendation of the MPO Executive Director that the Transportation Policy Committee adopt Alternative No. 1, as noted. ATTACHMENT(S): Attachment A - Draft FY 2026 TPWP.pdf 3 1 | P a g e The Ames Area Metropolitan Planning Organization prepared this report with funding from the U.S. Department of Transportation’s Federal Highway Administration and Federal Transit Administration, and in part through local matching funds of the Ames Area MPO member governments. These contents are the responsibility of the Ames Area MPO. The U.S. government and its agencies assume no liability for the contents of this report or for the use of its contents. The Ames Area MPO approved this document on May 27, 2025. Please call (515) 239-5160 to obtain permission to use. DRAFT Transportation Planning Work Program Fiscal Year 2026 4 2 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO CONTENTS 1 - Introduction...........................................................................................................................................4 1.1 Document Purpose ...........................................................................................................................4 1.2 AAMPO Overview and Planning Area ...............................................................................................4 1.3 Transportation Policy Committee.....................................................................................................5 1.4 Transportation Technical Committee ...............................................................................................6 1.5 Planning Documents Maintained by AAMPO ...................................................................................6 2 – TPWP Development..............................................................................................................................7 2.1 TPWP Development Process.............................................................................................................7 2.2 Planning Priorities.............................................................................................................................8 2.3 Performance-Based Planning............................................................................................................9 3 – Work Elements ...................................................................................................................................10 3.1 Regional & Federal Planning Goals.................................................................................................10 3.2 Planning Emphasis Areas ................................................................................................................11 Element 1 - Administration...................................................................................................................12 Element 2 – Transportation Improvement Program ............................................................................14 Element 3 – Transit Planning ................................................................................................................16 Element 4 – Comprehensive Planning..................................................................................................19 Element 5 – Complete Streets ..............................................................................................................20 Element 6 – Long-Range Transportation Planning ...............................................................................22 Element 7 – Transportation Data..........................................................................................................24 Element 8 – Special Studies..................................................................................................................26 4 – FY 2026 Budget Summary...................................................................................................................28 4.1 Budget & Staff Hours Summary......................................................................................................28 4.2 Cost Allocation Plan ........................................................................................................................29 4.3 Private Sector Involvement.............................................................................................................29 5 – Revisions to the Transportation Planning Work Program ..................................................................30 5.1 Overview.........................................................................................................................................30 5.2 Waiver of Approvals........................................................................................................................30 5.3 Revision and Approval Procedures .................................................................................................31 Appendix A – Resolution of Approval.......................................................................................................32 5 3 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Appendix B – Self-Certification of Procurement and Consultation Selection Procedures .......................33 6 4 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO 1 - Introduction 1.1 Document Purpose The Fiscal Year 2026 Transportation Planning Work Program (TPWP) is the regional work plan developed by the Ames Area Metropolitan Planning Organization (AAMPO) for the fiscal year beginning July 1, 2025, and ending June 30, 2026. The TPWP is a requirement of 23 CFR 450.308 for metropolitan planning organizations to develop a document identifying work proposed for the next one-year period by major activity and task. The document includes details to indicate who will perform the planning activity, the schedule for completing the activity, what products should result from each activity, funding for each activity, and the total program budget. 1.2 AAMPO Overview and Planning Area AAMPO was officially designated the MPO of the Ames urbanized area by the Governor of Iowa in March 2003. This designation was the result of the Ames urbanized area having a population greater than 50,000 in the 2000 Census. As a result of the 2010 Census, the urbanized areas of Ames and Gilbert were combined into one urbanized area, therefore requiring the Metropolitan Planning Area Boundary be expanded to encompass this area in its entirety. The current boundary, a result of the 2020 Census and urban area adjustment, was adopted by the AAMPO on January 23, 2024 (shown in Figure 1). Figure 1: AAMPO Boundary (Adopted Jan 23, 2024) 7 5 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO The AAMPO provides and coordinates various transportation planning and improvement efforts throughout the Ames urban area and consists of two standing committees: The Transportation Policy Committee and the Transportation Technical Committee. 1.3 Transportation Policy Committee Transportation Policy Committee Membership Representative Agency Member Representative Agency Role City of Ames (Chair)John Haila Mayor City of Ames Gloria Betcher Council Member City of Ames Tim Gartin Council Member City of Ames Anita Rollins Council Member City of Ames Rachel Junck Council Member City of Ames Bronwyn Beatty-Hansen Council Member City of Ames Amber Corrieri Council Member Boone County Scott Longhorn Board of Supervisors Story County Linda Murken Board of Supervisors Ames Transit Agency (CyRide)Emily Boland CyRide Board Member City of Gilbert Jonathan Popp Mayor Iowa Dept. of Transportation ‡Shelby Ebel District 1 Transportation Planner Federal Highway Administration ‡Sean Litteral Planning and Development Team Leader Federal Transit Administration ‡Gerri Doyle Region 7 Community Planner Iowa State University ‡Brandi Latterell Director for Planning Services ‡ Non-voting 8 6 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO 1.4 Transportation Technical Committee The Transportation Technical Committee (TTC) serves as the primary advisory body to the TPC, and its membership consists of technical personnel from various regional agencies involved in transportation planning efforts and transportation project programming within the AAMPO planning area. Currently, the TTC membership includes the City of Ames, City of Gilbert, Ames Transit Agency (CyRide), Boone County, Story County, Iowa State University, Ames Community School District, Gilbert Community School District, and the Ames Economic Development Commission. The Iowa Department of Transportation, the Federal Highway Administration, and the Federal Transit Administration have advisory, non-voting, representatives. ‡ Non-voting The AAMPO develops, updates, and maintains the following core planning documents: •Transportation Planning Work Program (TPWP) •Transportation Improvement Program (TIP) •Public Participation Plan (PPP) •Metropolitan Transportation Plan (MTP) •Passenger Transportation Plan (PTP) Transportation Technical Committee Membership Representative Agency Member Representative Agency Role City of Ames (Chair)Damion Pregitzer Traffic Engineer City of Ames (Vice-Chair)Justin Moore Planner City of Ames Kelly Diekmann Director of Planning & Housing City of Ames Mindy Bryngelson Municipal Engineer City of Ames Brad Becker Operations Manager (Interim) City of Ames Mark Gansen Civil Engineer II City of Ames Joshua Thompson Parks & Facilities Superintendent City of Gilbert Mitch Holtz City Engineer (Strand Associates) Ames Transit Agency (CyRide)Barbara Neal Transit Director Iowa State University Sarah Lawrence Campus Planner Iowa State University Angie Solberg Facilities Project Manager Boone County Jonathan Bullock County Engineer Story County Darren Moon County Engineer Ames Community School Dist.Gerry Peters Facilities Director Gilbert Community School Dist.Trent Becker Transportation Manager Ames Economic Development Commission Greg Piklapp Director Econ. Outreach & Gov. Relations Iowa Dept. of Transportation ‡Shelby Ebel District 1 Transportation Planner Federal Highway Administration ‡Sean Litteral Planning and Development Team Leader Federal Transit Administration ‡Gerri Doyle Region 7 Community Planner 9 7 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO 2 – TPWP Development 2.1 TPWP Development Process The FY 2026 Transportation Planning Work Program was developed from input by AAMPO staff, the AAMPO Transportation Technical Committee, the public, and the AAMPO Transportation Policy Committee. The following milestones describe the process in which the Transportation Planning Work Program was developed. February 1, 2025 – March 12, 2025 – Initial Draft Development AAMPO staff developed the initial Draft FY 2026 TPWP. March 13, 2025 – Transportation Technical Committee Meeting A review and discussion of the Draft FY 2026 TPWP were undergone by the Transportation Technical Committee. March 25, 2025 – Transportation Policy Committee Meeting A review and discussion of the Draft FY 2026 TPWP were undergone by the Transportation Policy Committee and the date of public hearing was set for May 27, 2025. March 26, 2025 – April 30, 2025 – Public Input Period A public comment period for the Draft FY 2026 TPWP was established from March 26 through April 30, 2025. During the comment period, the draft document was posted on the MPO website, aampo.org, and notifications were distributed to the public. Comments could be submitted via online form, email, mail, and by phone. April 1, 2025 – May 1, 2025 – Review by Federal and State Partners Federal and State partners at the Federal Highway Administration, Federal Transit Administration, and Iowa Department of Transportation reviewed the Draft FY 2026 TPWP. By May 1, 2025, the MPO received comments to address in the Final FY 2026 TPWP. May 1, 2025 – May 26, 2025 – Final TPWP Development AAMPO staff created the Final FY 2026 TPWP based upon feedback from the public, state and federal partners, and members of the AAMPO Technical and Policy Committees. May 27, 2025 – Transportation Policy Committee Hearing A public hearing was held by the Transportation Policy Committee to consider adoption of the FY 2026 TPWP with opportunities from the public to respond and present to the committee. This document was then formally approved by the Transportation Policy Committee. 10 8 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO 2.2 Planning Priorities The FY 2026 TPWP addresses the planning goals of the AAMPO, which are: •Provide a connected transportation system that offers efficient and reliable mobility options for all modes of travel. •Provide a safe transportation system. •Consider and mitigate the impacts of the transportation system on the natural and built environment. •Provide an accessible transportation system which fits within the context of its surroundings and preserves community character. •Provide a transportation system that supports the regional economy and efficiently moves goods. •Maintain transportation infrastructure in a state-of-good-repair. The following is a list of ongoing and future challenges the AAMPO expects to address through projects and planning activities: •The Ames regional area experiences a high variability in traffic due to weekly commuters, regional commercial weekend traffic, and special events (such as Iowa State football games). AAMPO will leverage emerging technologies as well as automated data collection to generate regional metrics and Transportation Systems Management and Operations (TSMO) strategies in coordination with local agencies to improve traffic operations. •Some intersections and corridors within Ames are nearing operational capacities and struggle to handle currently observed levels of traffic and users. Through emerging technologies such as adaptive traffic signal control, transit signal priority, widescale data collection, and new ITS communication technologies, AAMPO will ensure projects are planned and executed which attempt to leverage new technologies to maximize operational capabilities and improve intersection and roadway capacities across all modes of travel. •The AAMPO is starting to place an even greater emphasis on prioritizing projects which benefit underserved populations, and which reduce emissions and minimize or have positive environmental impact. As such, impact on high-need areas and disadvantaged populations and environmental impact and emissions reduction are now evaluation criteria components for projects wishing to receive regional Surface Transportation Block Grant (STBG), Carbon Reduction Program (CRP), and Transportation Alternatives Program (TAP) funding. The AAMPO will also be sure to incorporate these emphases in future planning efforts and transportation plan updates, such as the ongoing Metropolitan Transportation Plan (MTP) update. 11 9 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO 2.3 Performance-Based Planning Performance-based planning and performance management became a focus for State and regional transportation planning with the signing of the 2012 Federal surface transportation bill Moving Ahead for Progress in the 21st Century (MAP-21). The Federal government established seven national goals through MAP-21, and maintained these goals in subsequent federal legislation, with the purpose of improving decision-making through performance-based planning and programming. Those seven goals are: •Safety •Infrastructure Condition •Congestion Reduction •System Reliability •Freight Movement and Economic Vitality •Environmental Sustainability •Project Delivery The AAMPO must establish and use a performance-based approach in transportation decision making to support the national goals. The AAMPO implements these required metrics in coordination with the Iowa DOT (see Appendix C for the Performance Management Agreement), which includes setting regional targets for several performance measures established by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA). See Appendix D for these performance measure targets. Future reports on the AAMPO’s progress in reaching regional targets will be included in the ongoing MTP update. 12 10 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO 3 – Work Elements This section will describe each of the eight transportation planning work elements that AAMPO will undergo in Fiscal Year 2026: administration, transportation improvement program, transit planning, comprehensive planning, complete streets, long-range transportation planning, transportation data, and special studies. 3.1 Regional & Federal Planning Goals Table 1 describes how each of the work elements relate to accomplishing regional transportation planning goals/priorities (listed in the AAMPO’s Metropolitan Transportation Plan (MTP), “Forward 2045”) and the federal planning factors that should guide the planning processes conducted by MPOs. Table 1: Relation of Work Elements and Regional Goals/Planning Factors Elem. 1 Admin Elem. 2 TIP Elem. 3 Transit Elem. 4 Comp. Planning Elem. 5 Complete Streets Elem. 6 Long- Range Planning Elem. 7 Transpor -tation Data Elem. 8 Special Studies Accessibility X X X X X X X Safety X X X X X X Sustainability X X X X X X Efficiency & Reliability X X X X X X X Placemaking X X X X X X X Regional Goals Preservation X X X X Economic Vitality X X X X X Safety X X X X X X X Security X X X X X X X Accessibility & Mobility X X X X X X Protect & Enhance the Environment and Promote Conservation X X X X X X X Integration & Connectivity X X X X X X X Efficiency X X X X X X Preservation X X X X X Improve Resiliency & Reliability X X X X X X X Federal Planning Factors Enhance Travel & Tourism X X X X X X X 13 11 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO 3.2 Planning Emphasis Areas On December 30, 2021, the FHWA and FTA released updated 2021 planning emphasis areas (PEAs) for use in the development of metropolitan and statewide planning and research programs. The following details how the AAMPO addresses some of these PEAs through its various planning activities and planning document updates. Climate & Clean Energy – The AAMPO will continue to consider climate impacts (positive and negative) when identifying, prioritizing, and evaluating projects in both TIPs and the MTPs. The new Carbon Reduction Program (CRP) will also be specifically leveraged for projects which reduce carbon and other greenhouse gas emissions. The AAMPO will both inform and encourage its local member agencies to submit projects which will reduce or eliminate greenhouse gas and carbon emissions for funding for this new program. Equity & Justice – The AAMPO develops and maintains a Public Participation Plan (PPP) and a Limited English Proficiency (LEP) Plan. These plans aim to ensure ample public involvement opportunities for underserved and disadvantaged populations. Additionally, the AAMPO submits Title VI documentation to both the FHWA and FTA, which ensures that the MPO is adhering to applicable Title VI federal requirements. Title VI prohibits discrimination based on race, color, or national origin in any program or activity that receives federal funding. These documents are all developed as a part of Work Element 1 (Administration). Additionally, impacts to underserved and disadvantaged populations are considered when identifying, prioritizing, and evaluating projects in the Transportation Improvement Program (TIP) and the Metropolitan Transportation Plan (MTP). Complete Streets – The AAMPO previously supported the City of Ames in the development of its Complete Streets Plan in 2018. The latest MTP refers to the Ames Complete Streets Plan and leverages its policies and principles when evaluating the regionwide transportation network and developing and prioritizing projects. The AAMPO also includes a dedicated work element in the TPWP (Work Element 5 - Complete Streets) specifically for Complete Streets planning activities and efforts. Public Involvement – As previously mentioned, the AAMPO develops and maintains a Public Participation Plan (PPP). This plan details how the MPO involves the public and stakeholders in its transportation planning efforts. The MPO recently redesigned its website and updated its PPP in July 2024. Planning & Environmental Linkages (PEL) – During MTP updates, the AAMPO always considers environmental, community, and economic goals early in the transportation planning process. These regional goals (identified in Table 1) form the foundation of the MTP, its development strategy, and its project prioritization processes. Data in Transportation Planning – The AAMPO is actively incorporating data within its planning processes and shares its data with its member agencies and stakeholders. Work Element 6 - Transportation Data is dedicated to obtaining and leveraging transportation datasets and utilizing data analytics to strengthen performance-based planning efforts in the region. 14 12 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Element 1 - Administration Objective: To initiate and properly manage the “3-C” planning process, ensuring that it is continuous, cooperative, and comprehensive, and in compliance with applicable State and Federal laws and regulations. Description: This task includes all administrative tasks which support activities of the MPO including the following: prepare and submit required documents to maintain the continuity and credibility of the planning process. Sponsor and conduct meetings and provide support to policy and technical committees. Prepare budgets, maintain financial records, and ensure planning funds are spent appropriately. Coordinate activities with participating agencies and other public and private interests. Purchase/lease supplies, computer equipment and other equipment necessary to carry out planning efforts. Maintain sufficient software and purchase necessary upgrades when beneficial to the AAMPO. Conducting informational meetings, as well as public hearings, to obtain public input and feedback on ongoing activities. The Public Participation Plan (PPP), along with other pertinent documents maintained and developed by the AAMPO are posted online on the MPO website (www.aampo.org). The PPP will be evaluated for modifications to evolve with communication preferences, as warranted. AAMPO staff will participate in conferences, seminars, meetings, and other training opportunities to remain familiar with the latest regulations and techniques related to the transportation planning field as provided by the Federal Transit Administration, Federal Highway Administration, American Planning Association, Environmental Protection Agency, Iowa Department of Transportation, peer transportation planning organizations, and other agencies and professional organizations. FY 2026 Products: •Administer the FY 2026 TPWP. •Develop and approve the FY 2027 TPWP. •Review Public Participation Plan (PPP) and Limited English Proficiency Plan (LEP) and update as needed. •Review Title VI documentation and update as needed. •Review Roadway Federal Functional Classifications (FFCs) (in coordination with state & federal partners) on an as-needed basis. •Carry out required annual certifications. •Maintain records and files. •Complete reports, surveys, and other materials requested by Federal, State, or other governmental agencies. •Administer meetings for the Transportation Policy Committee and Transportation Technical Committee. 15 13 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO •Participate in regional and state-wide coordination meetings related to transportation planning. •Participate in conferences, trainings, and meetings pertinent to transportation planning hosted by Federal, State, professional organizations, or other appropriate organizations and agencies. •Market and perform outreach for MPO planning activities. •Purchase/lease supplies and equipment as well as maintain sufficient software and upgrades that are beneficial to AAMPO planning efforts. •Maintain the MPO website and update as needed. FY 2026 Schedule: •Activities for this work element will be ongoing throughout the fiscal year unless noted below. •The FY 2027 TPWP will be developed and approved during Q3 & Q4 (January-June 2026). FY 2026 Hours/Budget: •Total Budget: $50,000 (Federal - $40,000; Local - $10,000) •MPO Staff Hours: 534 Primary FY 2025 Accomplishments: •Administered the FY 2025 TPWP. •Developed and approved the FY 2026 TPWP. •Updated and approved an updated Public Participation Plan (PPP). •Updated and approved updated Title VI documentation. •Carried out required annual certifications. •Maintained records and files. •Administered meetings for the Transportation Policy Committee and Transportation Technical Committee. •Participated in regional and state-wide coordination meetings related to transportation planning. •Participated in conferences, trainings, and meetings pertinent to transportation planning hosted by Federal, State, professional organizations, or other appropriate organizations and agencies. Note, all activities from FY 2025 were completed for this task. 16 14 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Element 2 – Transportation Improvement Program Objective: Develop and maintain a regional program of near-term projects that are consistent with the current AAMPO Metropolitan Transportation Plan, “Forward 45”. Description: The AAMPO is responsible for developing the funding program of transportation projects which utilize federal funds or are regionally significant. The MPO carries out a process for soliciting regional projects for the Surface Transportation Block Grant (STBG), Transportation Alternatives program (TAP), and the Carbon Reduction Program (CRP). The MPO also reviews regional projects seeking Iowa Clean Air Attainment Program (ICAAP) funds to ensure that they conform with established regional transportation goals and initiatives. Projects which are awarded federal funding, or are regionally significant, are included in the Transportation Improvement Program (TIP). The TIP is developed in coordination with local governments, the state of Iowa, and transit operators. Consistent with the Public Participation Plan, opportunities for public review and comments will be provided for all Transportation Policy Committee actions on the TIP. FY 2026 Products: •Approve and administer the FFY 2026-29 TIP. •Amend and modify the FFY 2026-29 TIP as needed. •Develop the FFY 2027-30 TIP. •Undergo the annual regional grant project application cycle (STBG, TAP, CRP) for projects wishing to receive funding in FFY 2027-2030. •Perform and manage regional project programming through the TPMS system. •Certify ICAAP project application submitted to the Iowa DOT by regional sponsors. FY 2026 Schedule: •Activities for this work element will be ongoing throughout the fiscal year unless noted below. •The FFY 2026-27 TIP will be approved in July 2025 and the FFY 2027-30 TIP will be developed during Q4 (April-June 2026). •The annual regional grant project application cycle (STBG, TAP, CRP) will be undergone during Q3 (January-March 2026) for projects wishing to receive funding in FFY 2027-2030. Projects will be reviewed and potentially incorporated into the Draft FFY 2027-2030 TIP during Q4 (April- June 2026). •ICAAP project applications will be reviewed and certified in September 2025. 17 15 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO FY 2026 Hours/Budget: •Total Budget: $8,000 (Federal - $6,400; Local - $1,600) •MPO Staff Hours: 113 •Approved and administered the FFY 2025-28 TIP. •Amended the FFY 2025-28 TIP. •Developed the FFY 2026-29 TIP. •Administered the annual regional grant application cycle (STBG, TAP, CRP) for projects wishing to receive funding in FFY 2026-2029. •Performed and managed regional project programming through the TPMS system. Note, all activities from FY 2025 were completed for this task. 18 16 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Element 3 – Transit Planning Objective: Enhance a coordinated, accessible, and efficient transit system. Description: This item involves transit planning issues related to land use and development, facility expansion analysis, technology planning, climate action planning, ridership surveys and analyses, managing transit programs and services in accordance with the Federal Transit Administration guidelines, and the development of fixed route transit services. Assets will be managed to ensure they are kept in a state of good repair by strategizing investment decisions with available funding levels. Planning of capital equipment will occur that meets the Americans with Disabilities Act, particularly for technology, bus stop amenities and buses. The transit agency will work to provide its services without regard to race, color or national origin by monitoring its own separate Title VI program as required by the Federal Transit Administration (FTA). Additionally, the transit agency will work to monitor its Equal Employment Opportunity and Disadvantaged Business Enterprise programs as required by FTA. Meetings will be held to facilitate the MPO’s locally developed coordinated public transit/human- services transportation plan to improve transportation services for the low-income, aging, and disabled populations within the community. Efforts will concentrate on improving operating efficiencies of current services and eliminating gaps where and when transportation is not available. The transportation planner may conduct various planning and ridership studies throughout the year to ensure compliance with federal regulations. The safety officer will also update the safety plan annually through a coordinated process with front line staff. A memorandum of understanding will be periodically updated between the transit agency and the MPO staffs for duties containing metropolitan and statewide planning. FY 2026 Products: •Complete various transit planning as required, including the administration and audits of the following programs requiring annual certifications by the transit agency: ADA Planning, Equal Employment Opportunity Program (EEO), Title VI Program, Limited English Proficiency (LEP), Disadvantaged Business Enterprise (DBE), Transit Asset Management Plan, CyRide Safety & Security Plan, and State/Federal reviews and compliance. •Attend quarterly Passenger Transportation Plan meetings with human & health service organization groups and transportation providers to address transit gaps and needs •Passenger Transportation Plan (PTP) revisions to the MPO, as needed •Bus stop amenities & technology planning •Capital/Financial planning to analyze fleet, facility, and technology needs •Disadvantages Business Enterprise Program & Goals Submission, if necessary •Equal Employment Opportunity Program monitoring •Title VI Program monitoring •Facility Expansion planning on current site 19 17 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO •NEPA Planning (facility & bus shelters) •MPO-CyRide MOU update •Safety Plan review/update and performance measures •Update CyRide’s Transit Asset Management Plan, 2026-2030 performance targets & 2025 narrative report submission to FTA via the National Transit Database (NTD). •Transit Service Planning for current/new services or ridership studies •Transit Management Analysis of current/new policies FY 2026 Schedule: Activities for this work element will be ongoing throughout the fiscal year unless noted as follows: •Monitor DBE to ensure no federal contracting opportunities over $250,000, or else submit new DBE Program and DBE Goals accordingly. •Submit Passenger Transportation Plan meeting minutes to Iowa DOT by 7/31/2026. •Update TAM Plan and performance targets and submit to AAMPO by 10/1/2025. •Develop and submit TAM Plan narrative to FTA via NTD by 10/1/2025. •Review & update Safety Plan in August then submit targets to AAMPO by 10/1/2025. •Undergo State on-site Review with Iowa DOT in FY 2026. •CyRide Title VI Program due to FTA by 10/1/2025. •CyRide EEO program due to FTA by 3/1/2026. FY 2026 Hours/Budget: •Total Budget: $50,000 (Federal - $40,000; Local - $10,000) •MPO Staff Hours: 688 Primary FY 2025 Accomplishments •Completed shelter NEPA requirements •Monitored grant contracts and completed reporting, surveys and other materials as requested by Federal, State or other governmental agencies •Prepared Triennial Review documentation for FTA for onsite that occurred on July 11-12, 2024. After review of 23 compliance areas, FTA found zero deficiencies for the three-year period in how CyRide manages its programs and services as well as how it spends its federal grant funding. •Analyzed DBE program and threshold requirement •Completed Automatic Passenger Count Research Project final report •Attended and participated in meetings with human service/health organizations and transportation providers organizations for PTP planning to reduce transportation gaps in Ames •Reviewed and developed FY2025 Capital Plan and price increases for buses. •Safety Plan Development & Certification •Monitored and documented CyRide’s Title VI Program requirements •Monitored and documented CyRide’s Equal Employment Opportunity Program requirements 20 18 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO •Developed Transit Asset Management (TAM) Plan (performance measures, annual National Transit Database narrative & performance targets updates) •Transit Service Planning (i.e. route planning, battery electric bus project planning, ADA services) Note, all activities from FY 2025 were completed for this task. 21 19 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Element 4 – Comprehensive Planning Objective: Integrate transportation planning and land-use planning for AAMPO member jurisdictions. Description: Participate in regional activities which enhance the transportation network including collaboration with local transportation activities, technical assistance for member agencies, and other activities which are promoting a comprehensive planning approach. FY 2026 Products: •Provide technical assistance to local agencies incorporating regional transportation goals and objectives into comprehensive, sub-area, capital improvement, and other local plans. •Perform traffic modeling (Microsimulation, Synchro, SIDRA, etc.) to support local studies and projects as needed. •Coordinate with the City of Ames on its ITS network projects. •Prepare for Safe Routes to School (SRTS) Plan anticipated to be developed in FY 2027. •Analyze potential alternative funding sources. FY 2026 Schedule: •Activities for this work element will be ongoing throughout the fiscal year. FY 2026 Hours/Budget: •Total Budget: $20,000 (Federal - $16,000; Local - $4,000) •MPO Staff Hours: 281 Primary FY 2025 Accomplishments: •Provided technical assistance and support to local agencies for various transportation studies and projects (including speed studies, traffic studies, etc.). •Performed traffic modeling for various projects and studies. •Coordinated with the City of Ames for implementing Phases 1-4 of their Intelligent Transportation System (ITS) Master Plan. Note, all activities from FY 2025 were completed for this work element except for preparing for developing a Safe Routes to School (SRTS) Plan. The SRTS Plan is now anticipated to begin development in FY 2027. 22 20 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Element 5 – Complete Streets Objective: To increase safe and accessible options for multiple travel modes for people of all ages and abilities. Description: BIL § 11206(b) requires that MPOs use not less than 2.5% of PL funds on Complete Streets planning activities. These funds are eligible to be up to 100% reimbursable. Activities (per BIL § 11206(c)) must “increase safe and accessible options for multiple travel modes for people of all ages and abilities,” which if permissible under State and local laws, may include: 1. Adoption of Complete Streets standards or policies; (see BIL § 11206(a)… the term “Complete Streets standards or policies” means standards or policies that ensure the safe and adequate accommodation of all users of the transportation system, including pedestrians, bicyclists, public transportation users, children, older individuals, individuals with disabilities, motorists, and freight vehicles.) 2. Development of a Complete Streets prioritization plan that identifies a specific list of Complete Streets projects to improve the safety, mobility, or accessibility of a street. 3. Development of transportation plans to… a. Create a network of active transportation facilities, including sidewalks, bikeways, or pedestrian and bicycle trails, to connect neighborhoods with destinations such as workplaces, schools, residences, businesses, recreation areas, healthcare and childcare services, or other community activity centers. b. Integrate active transportation facilities with public transportation service or improve access to public transportation. c. Create multiuse active transportation infrastructure facilities (including bikeways or pedestrian and bicycle trails) that make connections within or between communities. d. Increase public transportation ridership; and e. Improve the safety of bicyclists and pedestrians. 4. Regional and megaregional planning (i.e., multi-jurisdictional transportation planning that extends beyond MPO and/or State boundaries) that address travel demand and capacity constraints through alternatives to new highway capacity, including through intercity passenger rail. 5. Development of transportation plans and policies that support transit-oriented development. FY 2026 Products: •AAMPO staff time/contribution towards the multi-modal and active transportation components of the 2050 MTP update. Work undertaken past the budget threshold of this work element will fall under Work Element 6 – Long Range Transportation Planning. 23 21 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO FY 2026 Schedule: •Activity for this work element will conclude no later than the adoption date of the 2050 MTP (September 23, 2025). •Total Budget: $3,286 (Federal - $3,286) 100% reimbursement rate •MPO Staff Hours: 46 •Contributed towards the multi-model and active transportation components of the 2050 MTP update. Note, all activities from FY 2025 were completed for this work element. 24 22 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Element 6 – Long-Range Transportation Planning Objective: Provide framework for long-term orderly and efficient growth of an integrated, multi-modal transportation network. Description: The 2045 Metropolitan Transportation Plan (known as “Forward 45”) became effective on October 27, 2020. To support the activities of this Metropolitan Transportation Plan, the AAMPO will continue to monitor and update the plan, as necessary. AAMPO will continue to ensure that ongoing planning efforts and regional transportation projects conform with the approved Metropolitan Transportation Plan. The AAMPO will complete development of the 2050 Metropolitan Transportation Plan (known as “Ames Connect 2050”) in FY 2026, with anticipated final approval of the plan on September 23, 2025. The update to the regional travel demand model will also be completed. On December 13, 2023, the AAMPO was awarded $100,000 in Safe Streets and Roads for All (SS4A) grant funding by the U.S. DOT for the creation of a Comprehensive Safety Action Plan. In FY 2026, in concurrence with the 2050 MTP update, the AAMPO will complete development of a Comprehensive Safety Action Plan which incorporates all the required components specified by the U.S. DOT in the SS4A funding requirements. FY 2026 Products: •Monitor and update the 2045 Metropolitan Transportation Plan (“Forward 2045”) as needed and ensure that all regional transportation efforts and projects continue to conform with the regional planning goals and projects outlined in the plan. Undergo the same effort for the 2050 Metropolitan Plan (“Ames Connect 2050”) once it is adopted. •Finish development of the 2050 Metropolitan Transportation Plan (“Ames Connect 2050”) and adopt the plan no later than September 23, 2025. •Complete the regional travel demand model update in coordination with the Iowa DOT and the 2050 MTP update and maintain and utilize the travel demand model as needed. •Finish development of a Comprehensive Safety Action Plan which meets SS4A criteria and adopt the plan no later than September 23, 2025. FY 2026 Schedule: •Activities for this work element will be ongoing throughout the fiscal year except as noted below. •The 2050 MTP and Comprehensive Safety Action Plan are anticipated to be adopted on September 23, 2025. •The regional travel demand model update should be completed no later than Q1 (July- September 2025). 25 23 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO FY 2026 Hours/Budget: •Total Budget: $145,000 (Federal - $96,000; State - $2,400; SS4A - $20,000; Local - $26,600) •MPO Staff Hours: 281 6.1 Long-Range Planning This activity within the work element’s budget is dedicated to the MPO staff time used for completing the various tasks described in this work element. •Budget: $20,000 (Federal - $16,000; Local - $4,000) •MPO Staff Hours: 281 6.2 MTP Consultant This activity within the work element’s budget is dedicated for all incurred fees from the consultant developing the 2050 Metropolitan Transportation Plan. •Total Budget: $100,000 (Federal - $80,000; Local - $20,000) •MPO Staff Hours: 0 6.3 SS4A Safety Action Plan Consultant This activity within the work element’s budget is dedicated for all incurred fees from the consultant developing the Comprehensive Safety Action Plan. •Total Budget: $25,000 (State HSIP-SWAP - $2,400; SS4A - $20,000; Local - $2,600) •MPO Staff Hours: 0 •Started the 2050 MTP update (“Ames Connect 2050”). •Started developing the Comprehensive Safety Action Plan (CSAP). •Updated the Regional Travel Demand Model in coordination with Iowa DOT staff. Note, all activities from FY 2025 were completed for this work element. 26 24 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Element 7 – Transportation Data Objective: Obtain and leverage transportation datasets and utilize data analytics to strengthen performance-based planning efforts in the region. Description: Rapidly emerging technologies have allowed for new forms and quantities of transportation data and new powerful analytical capabilities. The AAMPO will explore and leverage these new transportation datasets and analytical capabilities to farther performance-based planning efforts for all modes of transportation throughout the region. The MPO will also continue to leverage more traditional data sources such as field sensors, travel surveys, and census data. In addition to using transportation data for its own planning efforts and planning document updates, the MPO will also seek to make its data available to its member agencies, members of the public, as well as other regional stakeholders. FY 2026 Products: •Maintain and leverage existing subscriptions/contracts with transportation data and analytics service providers. •Explore new potential transportation data and analytics sources and procure new services or devices as needed. •Perform data collection as needed. •Aid with the maintenance of member agency’s transportation datasets and assets as needed. •Assess and analyze available region-wide datasets for any trends in vehicle speeds, travel times, origin-destination behavior, socioeconomics, multi-modal data, pavement condition, or vehicle volumes. •Provide access to the MPO’s transportation data for member agencies, citizens, and other MPO stakeholders. FY 2026 Schedule: •Activities for this work element will be ongoing throughout the fiscal year except as noted below. •Anticipated procurement of a pavement condition data collection and management system in Q1 (July-September 2025). FY 2026 Hours/Budget: •Total Budget: $155,000 (Federal - $124,000; Local - $31,000) •MPO Staff Hours: 141 27 25 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO 7.1 Data Management This activity within the work element’s budget is dedicated to the MPO staff time used for completing the various tasks described in this work element. •Budget: $10,000 (Federal - $8,000; Local - $2,000) •MPO Staff Hours: 141 7.2 Traffic Data Procurement This activity within the work element’s budget is dedicated to the procurement of transportation datasets or sensors as well as data analytics platforms. •Total Budget: $65,000 (Federal - $52,000; Local - $13,000) •MPO Staff Hours: 0 7.3 Pavement Data Procurement This activity within the work element’s budget is dedicated to the procurement of a pavement condition data collection and management system. •Total Budget: $80,000 (Federal - $64,000; Local - $16,000) •MPO Staff Hours: 0 Primary FY 2025 Accomplishments: •Continued existing subscription/contract with StreetLight Data, Inc. for a transportation data service platform which provides access to regionwide vehicle, O-D, and socioeconomic transportation data sets as well as various analytical capabilities. •Maintained and leveraged access to the Strava Metro platform, which provides regionwide aggregated data using Strava user activity data (pedestrians, runners, and bicyclists). •Leveraged & analyzed various datasets to provide to member agencies for various projects & grant applications. Note, all activities from FY 2025 were completed for this work element. 28 26 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Element 8 – Special Studies Objective: To further the region’s transportation planning goals and objectives, as defined in the AAMPO’s MTP, through special studies and projects undertaken by the AAMPO. Description: The AAMPO’s current Metropolitan Transportation Plan “Forward 2045” identified several policy options, strategies, and studies that should be prioritized to augment the goals, priorities, and projects defined in the plan. One recommendation was the development of a Transportation System Management & Operations (TSMO) document for the MPO region. The AAMPO’s Regional Intelligent Transportation System (ITS) Architecture document was last updated in 2007, and with the City of Ames currently implementing multiple phases of their Traffic Signal Master Plan, the AAMPO region has seen significant changes to its ITS architecture. Therefore, the AAMPO will develop a combined TSMO and Regional Architecture Document to help local agencies properly leverage the rapidly increasing emerging ITS solutions being implemented throughout the region. In the City of Ames Bicycle-Pedestrian Master Plan “WalkBikeRoll Ames”, the Duff Ave corridor from Main St to 13th St was identified as a high priority corridor for multi-modal improvements. Additionally, the intersection of Duff Ave and E 12th St was identified as a high priority location for crossing improvements. As such, a comprehensive corridor study of the Duff Ave corridor from Main St to 13th St will be conducted in FY 2026 in order to assess existing and projected multi-modal operations and identify potential multi-modal improvements that can be implemented along the corridor. Conducting this study will allow a finer level of detailed analysis compared to what was possible in the WalkBikeRoll Ames Plan and the MPO’s 2050 Metropolitan Transportation Plan. FY 2026 Products: There are two special studies planned in FY 2026. •TSMO/Regional ITS Architecture Document o Develop a combined TSMO and Regional Architecture Document to help local agencies properly leverage the rapidly increasing emerging ITS solutions being implemented throughout the region. •Duff Ave Study (Main St – 13th St) o Conduct a corridor study of Duff Avenue from Main Street to 13th Street. The Study will include analyzing existing and future operations and recommending potential multi- modal improvements along the corridor. FY 2026 Schedule: •TSMO/Regional ITS Architecture Document development is anticipated to begin in Q1 (July- September 2025) and conclude in Q4 (April-June 2026). 29 27 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO •The Duff Ave Study is anticipated to begin in Q1 (July-September 2025) and conclude in Q4 (April-June 2026). FY 2026 Hours/Budget: •Total Budget: $250,000 (Federal - $200,000; Local - $50,000) •MPO Staff Hours: 0 8.1 TSMO/Regional ITS Architecture Document Consultant This portion of the work element’s budget is dedicated to the payment of a consultant for the development of the TSMO/Regional ITS Architecture Document. •Budget: $150,000 (Federal - $120,000; Local - $30,000) •MPO Staff Hours: 0 8.2 Duff Ave Study Consultant This activity within the work element’s budget is dedicated for all incurred fees from the consultant conducting the Duff Ave Study from Main St to 13th St. •Budget: $100,000 (Federal - $80,000; Local - $20,000) •MPO Staff Hours: 0 Primary FY 2025 Accomplishments: E Lincoln Way Corridor Study •Presented final study report with acceptance of the study findings by the Ames City Council. TSMO/Regional ITS Architecture Document •Procured a consultant for completing the TSMO/Regional ITS Architecture Document. Note, all activities from FY 2025 were completed for this work element except for the TSMO/Regional ITS Architecture Document, which will be completed in FY 2026. 30 28 | P a g e 4 – FY 2026 Budget Summary 4.1 Budget & Staff Hours Summary Table 2 shows a breakdown of the seven work elements including their budget totals, funding sources, and MPO staff hours by activity. Table 2: Budget and Funding Source Summary Federal/State Funding Source Work Element Activity MPO Staff Hours FHWA PL C/O FTA 5305d C/O FHWA PL CS C/O FHWA PL New FTA 5305d New FHWA STBG New FHWA PL CS Set- Aside Iowa DOT HSIP- SWAP Federal/State Funding Local Funding Total Funding 1 - Administration Admin 534 $2,301 $300 $ - $9,807 $3,773 $23,820 $ - $ - $40,000 $10,000 $50,000 2 - Transportation Improvement Program TIP 113 $368 $48 $ - $1,569 $604 $3,811 $ - $ - $6,400 $1,600 $8,000 3 - Transit Planning Transit Planning 688 $2,301 $300 $ - $9,807 $3,773 $23,820 $ - $ - $40,000 $10,000 $50,000 4 - Comprehensive Planning Comp Planning 281 $921 $120 $ - $3,923 $1,509 $9,528 $ - $ - $16,000 $4,000 $20,000 5 - Complete Streets Complete Streets 46 $ - $ - $ 3 $ - $ - $ - $3,283 $ - $3,286 $ - $3,286 Long Range Planning 281 $921 $120 $ - $3,923 $1,509 $9,528 $ - $ - $16,000 $4,000 $20,000 MTP Consultant 0 $4,603 $599 $ - $19,613 $7,545 $47,640 $ - $ - $80,000 $20,000 $100,000 6 - Long Range Planning SS4A Safety Action Plan Consultant 0 $ - $ - $ - $ - $ - $ - $ - $2,400 $2,400 $22,6001 $25,000 Data Management 141 $460 $60 $ - $1,961 $755 $4,764 $ - $ - $8,000 $2,000 $10,000 Traffic Data Procurement 0 $2,992 $390 $ -$12,749 $4,904 $30,966 $52,000 $13,000 $65,0007 - Transportation Data Pavement Data Procurement 0 $3,682 $479 $ - $15,691 $6,036 $38,112 $ - $ - $64,000 $16,000 $80,000 TSMO/Regional ITS Architecture Document Consultant 0 $6,904 $899 $ - $29,420 $11,318 $71,459 $ - $ - $120,000 $30,000 $150,000 8 - Special Studies Duff Ave (Main St – 13th St) Study Consultant 0 $4,603 $599 $ - $19,613 $7,545 $47,640 $ - $ - $80,000 $20,000 $100,000 FY 2026 Budget Totals 2,084 $30,057 $3,913 $3 $128,075 $49,269 $311,086 $3,283 $2,400 $528,086 $153,200 $681,286 1 – $20,000 in Safe Streets and Roads for All (SS4A) Discretionary Grant funding and $2,600 in local funds will be leveraged to cover consultant fees for developing a Comprehensive Safety Action Plan. 31 29 | P a g e Table 3 shows a breakdown of the budgeted unobligated federal and state funds by funding source. Table 3: Unobligated Funds FHWA PL C/O FTA 5305d C/O FHWA PL CS C/O FHWA PL New FTA 5305d New FHWA STBG New FHWA PL CS Set- Aside Iowa DOT HSIP- SWAP TOTAL Starting Balance $30,057 $3,913 $3 $128,075 $49,269 $311,086 $3,283 $2,400 $528,086 Programmed $30,057 $3,913 $3 $128,075 $49,269 $311,086 $3,283 $2,400 $528,086 Unobligated Funds $ - $ - $ - $ - $ - $ - $ - $ - $ - Appendix E). Note that FHWA program funding is transferred to FTA and merged with FTA funds into a consolidated planning grant. 4.2 Cost Allocation Plan 4.3 Private Sector Involvement •2050 MTP Development •Comprehensive Safety Action Plan Development •TSMO/Regional ITS Architecture Document Development •Duff Ave Corridor Study Appendix B). 32 30 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO 5 – Revisions to the Transportation Planning Work Program The TPWP is developed annually; however, it can be amended at any time throughout the life of the document. The following section outlines the process to be used to amend the work program. 5.1 Overview 2 CFR 200 describes the uniform administrative rules for Federal grants and cooperative agreements and subawards to State, local and Indian tribal governments. These requirements apply to metropolitan planning (PL) and State Planning and Research (SPR) grants. FTA has similar requirements and procedures documented in FTA Circular 5010.1F, which apply to all applicable FTA program grants. Iowa uses a Consolidated Planning Grant (CPG) where FHWA and FTA planning funds are combined into a single grant managed through FTA’s TrAMS system. The uses of these funds are documented in the work programs of the Iowa DOT, MPOs, and RPAs. FTA is the lead agency administering the CPG. 5.2 Waiver of Approvals All work program changes require prior written Federal approval, unless waived by the awarding agency. 2 CFR § 200.308 outlines different types of revisions for budget and program plans, and this FHWA memo on prior approvals summarizes revisions that require prior Federal approval, as well as other miscellaneous actions and allowable costs that require prior Federal approval. Types of TPWP revisions that require Federal approval include, but are not limited to, the following: •Request for additional Federal funding. •Transfers of funds between categories, projects, functions, or activities which exceed 10% of the total work program budget when the Federal share of the budget exceeds $150,000. •Revision of the scope or objectives of activities. •Transferring substantive programmatic work to a third party (consultant). •Capital expenditures, including the purchasing of equipment. •Transfer of funds allotted for training allowances. Types of revisions that require Iowa DOT approval include: •Transfers of funds between categories, projects, functions, or activities which do not exceed 10% of the total work program budget, or when the Federal share of the budget is less than $150,000. Types of revisions that require MPO/RPA approval include: •Revisions related to work that does not involve federal funding. 33 31 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO 5.3 Revision and Approval Procedures •All revision requests from MPOs and RPAs should be submitted electronically to the Iowa DOT Systems Planning Bureau and the agency’s Iowa DOT District Planner. If all necessary information is provided, the request will then be forwarded to the FHWA and FTA for review and any necessary approvals. ▪Revision requests shall, at a minimum, include: •A letter detailing the work program revision(s) •A resolution or meeting minutes showing the revision’s approval. •Budget summary table with changes highlighted. •Amended work program with any modified section(s) highlighted. •Revisions where FHWA/FTA is the designated approving agency shall require written approval by FHWA/FTA prior to commencement of activity, purchasing of equipment, or request for reimbursement. •Revisions where the Iowa DOT Systems Planning Bureau is the designated approving agency shall require written approval by the Iowa DOT Systems Planning Bureau prior to commencement of activity, purchasing of equipment, or request for reimbursement. •Revisions where the MPO or RPA is the approving agency shall be approved by the Policy Board. •Notification by the approving agency will be in writing. NOTE: All necessary TPWP approvals shall be in place prior to the commencement of activity, purchasing of equipment, or request for reimbursement. More specifically, with regard to the procurement of equipment and services, there should be no notification of award, signed contract, placement of an order, or agreement with a contractor prior to receiving the necessary TPWP approvals. 34 32 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Appendix A – Resolution of Approval [PLACEHOLDER FOR RESOLUTION] 35 33 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Appendix B – Self-Certification of Procurement and Consultation Selection Procedures [PLACEHOLDER FOR CONSULTANT SELECTION PROCEDURES] 36 34 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Appendix C – Performance Management Agreement On May 27, 2016, the final rule for statewide and metropolitan transportation planning was published, based on 2012’s Moving Ahead for Progress in the 21st Century (MAP-21) Act and 2015’s Fixing America’s Transportation System (FAST) Act. As part of this final rule, 23 CFR § 450.314 (h) was amended to state: (h) (1) The MPO(s), State(s), and the providers of public transportation shall jointly agree upon and develop specific written provisions for cooperatively developing and sharing information related to transportation performance data, the selection of performance targets, the reporting of performance targets, the reporting of performance to be used in tracking progress toward attainment of critical outcomes for the region of the MPO (see §450.306(d)), and the collection of data for the State asset management plan for the NHS for each of the following circumstances: (i) When one MPO serves an urbanized area; (ii) When more than one MPO serves an urbanized area; and (iii) When an urbanized area that has been designated as a TMA overlaps into an adjacent MPA serving an urbanized area that is not a TMA. (2) These provisions shall be documented either: (i) As part of the metropolitan planning agreements required under paragraphs (a), (e), and (g) of this section; or (ii) Documented in some other means outside of the metropolitan planning agreements as determined cooperatively by the MPO(s), State(s), and providers of public transportation. In 2017, the following three-pronged approach was cooperatively developed to address 23 CFR § 450.314 (h). This approach provides a regular opportunity to review and update coordination methods as performance management activities occur, which offers an adaptable framework as performance- based planning and programming evolves. •Agreement between the Iowa DOT and MPOs on applicable provisions through documentation included in each MPO’s TPWP. •Agreement between the Iowa DOT and relevant public transit agencies on applicable provisions through documentation included in each public transit agency’s consolidated funding application. •Agreement between each MPO and relevant public transit agencies on applicable provisions through documentation included in the appropriate cooperative agreement(s) between the MPO and relevant public transit agencies. Inclusion of the following language in an MPO’s TPWP, and that TPWP’s subsequent approval by Iowa DOT, constitutes agreement on these items. 37 35 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO The Iowa DOT and AAMPO agree to the following provisions. The communication outlined in these provisions between the MPO and Iowa DOT will generally be through the metropolitan and regional planning coordinator in the Systems Planning Bureau. 1) Transportation performance data 2) Selection of performance targets 3) Reporting of performance targets 38 36 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO d. MPOs will include information outlined in 23 CFR § 450.324 (f) (3-4) in any metropolitan transportation plan amended or adopted after May 27, 2018, and information outlined in 23 CFR § 450.326 (d) in any transportation improvement program amended or adopted after May 27, 2018. e. Reporting of targets and performance by the Iowa DOT and MPOs shall conform to 23 CFR § 490, 49 CFR § 625, and 49 CFR § 673. 4) Reporting of performance to be used in tracking progress toward attainment of critical outcomes for the region of the MPO a. The Iowa DOT will provide MPOs with the statewide performance data used in developing statewide targets, and, when applicable, will also provide MPOs with subsets of the statewide data, based on their planning area boundaries. 5) The collection of data for the State asset management plans for the NHS a. The Iowa DOT will be responsible for collecting bridge and pavement condition data for the State asset management plan for the NHS. 39 37 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Appendix D – Performance Measure Targets PM1 (Roadway Safety) Targets The MPO adopted to support the Iowa DOT’s statewide roadway safety targets on September 24, 2024. These performance measures and associated targets are shown in the following table: Five Year Rolling AveragesPerformance Measure 2019-2023 Baseline 2021-2025 Target Number of Fatalities 350.2 365.8 Fatality Rate – per 100 million VMT 1.070 1.085 Number of Serious Injuries 1,378.4 1,496.1 Serious Injury Rate – per 100 million VMT 4.208 4.391 Non-Motorized Fatalities and Serious Injuries 142.2 148.4 *Rates are per 100 million vehicle miles traveled (VMT) PM2 (Pavement & Bridge) & PM3 (System Performance & Freight) Targets The MPO adopted to support the Iowa DOT’s updated statewide PM2 targets on March 25, 2025. The MPO adopted to support the Iowa DOT’s PM3 targets on January 24, 2023. These performance measures and associated targets are shown in the following table: Performance Measure 2021 Baseline 2-Year Target 4 Year Target Interstate % Good Condition 58.8%55.0%53.0% Interstate % Poor Condition 0.4%3.0%3.0% Non-Interstate NHS % Good Condition 37.9%35.0%30.0%Pavement Non-Interstate NHS % Poor Condition 3.7%6.0%6.0% NHS % Good Condition 48.6%52.5%48.0%Bridge NHS % Poor Condition 2.4%5.0%6.6% Interstate % Reliable 99.9%99.9%98.0%Reliability Non-Interstate NHS % Reliable 96.5%96.7%94.0% Freight Interstate Truck Travel Time Reliability 1.13 1.13 1.25 40 38 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Transit Safety Targets The MPO adopted to support CyRide’s transit safety targets on September 24, 2024. These performance measures and associated targets are shown in the following table: Mode of Transit Service Major Events Major Events (per 100 thousand VRM) Collisions (per 100 thousand VRM) Pedestrian Collisions (per 100 thousand VRM) Vehicular Collisions (per 100 thousand VRM) Fatalities Fatalities (per 100 thousand VRM) Fixed Route Bus 0 0.00 0.00 0.00 0.00 0 0.00 Paratransit 0 0.00 0.00 0.00 0.00 0 0.00 Mode of Transit Service Transit Worker Fatalities (per 100 thousand VRM) Injuries Injuries (per 100 thousand VRM) Transit Worker Injuries (per 100 thousand VRM) Assaults on Transit Workers Assaults on Transit Workers (per 100 thousand VRM) System Reliability (VRM/Failures) Fixed Route Bus 0.00 0 0.00 0.00 0 0.00 34,119.55 Paratransit 0.00 0 0.00 0.00 0 0.00 238,798 The MPO adopted to support CyRide’s transit asset management (TAM) targets on March 25, 2025. These performance measures and associated targets are shown in the following table: Rolling Stock 40'-60' Buses % of fleet exceeds CyRide's ULB of 15 yrs.27%26%43%35%38%32%35% Rolling Stock Cutaways % of fleet exceeds FTA ULB of 8 yrs.0%0%0%0%0%0%0% Equipment Shop Trucks % of fleet exceeds CyRide’s ULB of 10 yrs.0%0%0%0%0%0%0% Facilities Admin./Maint. Facility % of facilities rated under 3.0 on TERM scale 0%0%0%0%0%0%0% Facilities Ames Intermodal Facility % of facilities rated under 3.0 on TERM scale 0%0%0%0%0%0%0% 41 39 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO Appendix E – MPO/RPA Carryover Policy Background Each year, federal planning funds from both the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) are combined into a new consolidated planning grant (CPG) under the FTA. This includes all federal transportation funds that are utilized by metropolitan planning organizations (MPOs) and regional planning affiliations (RPAs) in Iowa for planning, including FHWA metropolitan planning (PL), state planning and research (SPR), and surface transportation block grant (STBG) funds and FTA 5305d, 5305e, and 5311 funds. The FHWA funding sources are transferred to FTA for inclusion in the CPG, and once funds are part of an awarded CPG they are unable to be deobligated for other purposes. Carryover is defined as any unspent funding that has been targeted to the agency, but is not included in the agency’s current state fiscal year (SFY) budget. During the Transportation Planning Work Program (TPWP) development cycle, carryover ‘targets’ that show the current balances of carryover funding are provided to the agency along with targets for new federal funding. However, it should be noted that an agency does not have to wait for the next TPWP cycle to utilize carryover funding if there are anticipated needs in the current fiscal year. Unbudgeted funding is available to the planning agency to be amended into its budget at any time. Unspent funding from the prior SFY is available to the planning agency to be amended into its budget following close-out of the prior SFY. When developing the TPWP, agencies are required to program carryover funding before programming new funding. When reimbursement requests are submitted to the Iowa Department of Transportation (DOT), payments are made by utilizing the oldest funding source in the agency’s planning agreement. Funding is drawn down first by age, then sequentially by source. This helps streamline bookkeeping and ensure that funding within older CPGs is utilized prior to funding within newer CPGs. Since MPOs and RPAs are allowed to carry over unused federal planning funds rather than being required to draw them down within a fiscal year, multiple CPGs are open at any given time. FTA has asked Iowa DOT to ensure funds are being drawn down in a timely manner and to work to limit the number of CPGs that are open. Furthermore, the new grant management system FTA launched in 2016 requires additional documentation and justification to keep a grant open past its original end date. In order to satisfy FTA while still providing flexibility to MPOs and RPAs, Iowa DOT has implemented internal steps to reduce the number of CPGs that are open, and has also developed the policy outlined below. Internal steps that Iowa DOT has taken include discussing the necessity of STBG transfers with individual agencies when substantial carryover balances exist, and evaluating planning agreements and amending them if necessary early in the SFY to ensure any older funding that was unspent in the previous SFY is utilized prior to newer funding. The MPO/RPA carryover policy, which is outlined below, took effect as part of the SFY 2018 TPWP cycle. 42 40 | P a g e FY 2025 TRANSPORTATION PLANNING WORK PROGRAM | AAMPO The internal changes and the MPO/RPA carryover policy will help Iowa DOT manage carryover balances that have become problematic for a small number of planning agencies. Over time, reduced carryover balances will allow Iowa DOT to maintain fewer open CPGs. In addition, the policy will prevent unnecessary funding transfers from FHWA to FTA, thus enabling SPR and STBG funding to be used more efficiently. MPO/RPA Carryover Policy 43