HomeMy WebLinkAbout~Master - Zoning Board of Adjustment Minutes 01/11/20231
MINUTES OF THE REGULAR MEETING OF THE
AMES ZONING BOARD OF ADJUSTMENT
AMES, IOWA JANUARY 11, 2023
The Ames Zoning Board of Adjustment met, pursuant to law, in Regular Session at 6:00 p.m. on
January 11, 2023, in the Council Chambers of City Hall. The following members were present:
Rob Bowers, Leah Patton, Chad Schneider, and Michael Zenor; Leila Ammar was absent. Also
present were Assistant City Attorney Vikki Feilmeyer, and City Planners Justin Moore and Ray
Anderson.
Chad Schneider, Vice Chair serving as Chair of the meeting.
Approval of Minutes; November 9, 2022:
Moved by Bowers seconded by Patton to approve the minutes of the November 9, 2022,
Zoning Board of Adjustment meeting.
Vote on Motion: 3:0. Motion declared carried unanimously. Zenor not present at
November meeting.
CASE NO. 23-01
Public Hearing on a Request for a Floodplain Conditional Use Permit for 403 Hyland
Avenue.
Planner Justin Moore stated the application for consideration is for Hunziker Construction Services
on behalf of the owner DJGH LLC, requesting a Conditional Use Permit for an alternative method
of elevating a new residential multi-family housing structure in the floodway fringe overlay district
at 403 Hyland Avenue. The ordinance does permit construction of homes and buildings provided
the design meets the flood protection requirements in Chapter 9. The request is to elevate this
three-unit multi-family structure with parking located below the living area. Each unit has three
parking spaces under the unit. The northwest corner of the property overlaps into the floodway
fringe. There is a required amount of fill of 18 feet out from a residential structure. The lowest
floor of the structure must be built to the elevation standards, that would be Base Flood Elevation
(BFE) plus 3 feet. This means the residential structure must have fill outwards to 18 feet to a height
of BFE plus three. So, in the event of a flood residents would be able to walk out and be reasonably
safe from flooding as they wait to be rescued. There is a small area of floodway fringe on this
property. The standards come from when you are entirely in the floodway fringe. In this case, since
a part of the building is in the floodway fringe the standard would apply to the perimeter of the
building. It is purposed to have the building at the eight-foot setback of the property line. The
request is being made for an alternative design to include an extended foundation wall. It is called
an extended foundation wall with the living units above the parking. The living areas would be
constructed above the BFE plus three level. The bottom floor of the living area of the proposed
structure would be 12 feet above the BFE plus three. Open garage area for parking is permitted at
ground level and parking can be below the BFE provided that all other floodplain standards are
met. The design has provided openings in the wall in the area susceptible to flooding. This opens
2
into the garage area that is fully open on the east, thus meeing the requirement of minimizing any
structural damage in case of a flood. There is a proposed elevated balcony that is BFE + 12 feet.
Residents would always be able to exit the structure without being in any danger. Vehicles have
access to the structure without being in the floodplain.
Findings and Facts and Conclusions are in the Staff Report. They are the observations from the
staff from the applicant’s engineer for the property. The Staff recommendation is for Alternative
1 to approve the Conditional Use Permit.
Mr. Schneider called for questions from the Board. None.
Applicant Justin Dodge, Hunziker Companies, 105 S 16th Street, was sworn in. Thanked the Staff
for their time. He stated there is an overlay in this area and all the doors must face out to Oakland,
there are minimum density and parking requirements that also need to be met. This design was
based on the balance of those requirements. No questions from the Board.
Public Comments:
Marilyn Kollasch, 2817 Oakland, was sworn in. She and her spouse have lived at this property for
42 years. She stated that the legacy of the Hunzikers has been exceptional. Justin Moore, Cesar
Cintron-Opio and Liz Calhoun, all called her today in response to her questions. The first issue she
has is regarding the property at 509 Hyland. The properties that were demolished previously had
parking lots that were gravel, and they are adding three units adjacent to each other, with parking
that will now be all hard surfaced. The Clear Creek improvements that have been done have moved
the water closer to their backdoor. The downspout on 509 Hyland exits to the west over top of the
Hunziker property sending water into their back yard. Ms. Kollasch questioned how the water was
going to be shed from all these rental properties. Hyland Avenue has been raised in the past 15
years and their backyard has had increased flooding. All the requirements for the street are being
met for controlling the water in this proposed construction. The fear is that the storm sewer on
Oakland wouldn’t be able to handle the influx of water. The grate currently can’t take in the water
fast enough during the big storms. In their backyard the end of the drain tunnel has been corroded.
Ms. Kollasch spoke with Liz Calhoun about the creek stabilization. The CIP project for Clear
Creek is moving to the west of North Dakota and nothing in this area. She suggests a channel
modification to take some pressure off the storm sewer. She stated that this area has some
uniqueness. The area is bounded by the storm drain exit on the west which expels water from
Campus Avenue, Oakland Street, and the pressure from the Clear Creek watershed. This is a
confluence of the storm drain and Clear Creek. She is requesting for help for relief of the
neighbor’s properties. She suggested the DNR do a study, or an underpass under Hyland or a more
pervious surface. The Kollasch’s have the lowest backyard in the neighborhood. Also stated a
water retention area in that NW corner seems questionable.
Andy Bock, 2818 Oakland, was sworn in. He has observed in the past five years there is a lot of
water coming down from Campus Avenue as well. His property used to be a swamp many years
ago and it was filled in for the house to be built. He said given all the water that comes down
Campus and Oakland that needs to be taken into consideration.
3
Public Forum closed.
Applicant Justin Dodge came forward to address the concerns. Mr. Dodge stated that he hears their
concerns, but the developer can only grade on the property that they own and not the adjacent
properties. Mr. Schneider asked what the comparison of the two properties that were there
previously to what is being proposed to be built. He was questioning what the approximate increase
of size. Mr. Dodge stated there was a duplex and a single-family home. It is zoned RH and both
were previously non-conforming for the Zone. The proposed structure meets the minimum for the
RH Zone. Mr. Schneider questioned that there were previously three units on the property. Mr.
Dodge couldn’t answer for certain. Ms. Kollasch shared that the house east was 2-story single
family with a walk out and the east property was at least two units.
Questions for Staff:
Mr. Moore stated that there was a 1648 sq feet duplex but doesn’t have any information on the
single-family structure as far as the footprint. He continued that this is part of a minor site
development plan which is going through review separately through City Staff. This Conditional
Use Permit is part of that review. This step is part of the requirement the developer must go through
for the Minor Site Plan to be approved. The Public Works department Engineer Cesar Cintron-
Opio and Liz Calhoun review all the storm water criteria. They are also looking at this through the
site development plan process. The storm water questions get deferred to them. Tonight, is about
the design of the foundation wall to allow flood conveyance at the corner of the building and the
appropriate elevations. Mr. Schneider asked if there could be additional requirements for the flood
way. Mr. Moore stated he is not the planner on that side of things, and it is still in process with the
developer. Mr. Moore stated he is looking at the flood plain standards and the protections as it
concerns the design of this project.
Mr. Schneider questioned the square footage of the proposed structure. He stated this doesn’t
negate any other steps to address watershed but want to see the comparison. Mr. Moore stated the
new structure is 4100 sq ft, approximately 1/3 bigger.
Board Discussion: None
1. Moved by Zenor to approve Alternative 1 The Zoning Board of Adjustment can approve
the Conditional Use Permit to Allow the Alternative Method of Elevation for the
construction of the multi-family housing at 403 Hyland Avenue as shown on the site plan
and elevations based upon the findings and conclusions of staff. Seconded by Bowers.
Mr. Schneider stated he appreciates the water concern and can be addressed about how the
water flows off the building. The overall issue is the creek and is beyond the Board’s scope.
Can be addressed and doesn’t feel the size of the building is significant enough but the flow
off the building is to be addressed in a different place.
Roll Call: Schneider, aye; Patton, aye; Bowers, aye; Zenor, aye
Vote on Motion: 4:0. Motion declared carried unanimously.
4
CASE NO. 23-02
Public Hearing on a Request for a One-Year Extension of the Special Use Permit to Allow a
Temporary Yard Waste Processing Facility at 220 and 400 Freel Drive in the General
Industrial (GI) Zone
a. Planner Ray Anderson stated that 400 Freel Dr is the yard Waste Site and 220 Freel
Dr can be utilized during heavy times such as during the free drop off days. They
received approval from this Board on April 27 with conditions. It was approved for
one year from May 1, 2022, through May 1, 2023. A letter was received from Doug
Maccrea representing Green RU, LLC and would like a one-year extension through
May 1, 2024. None of the findings have changed since April. After that extension
they would need to apply for a new Special Use Permit. The recommendation of
the Staff is for approval of the one-year extension with a condition. No further
extensions of the approved Special Use Permit shall be granted by the Zoning
Board of Adjustment. A new application for a Special Use Permit shall be required
for use of the site as a yard waste facility after May 1, 2024.
If they would like to continue using that site, they would have to reapply at that time.
Applicant Lillian Chamness, 310 SW 11th St Des Moines, Iowa, was sworn in. She is the daughter
of the owner of Chamness Technology doing business as Green R U, LLC. Questions last year
were about grinding and hauling it away. All of that has been done. Mr. Schneider stated that there
are DNR requirements and those appear to have been met.
Public Forum closed.
Board Discussion: None
Bowers moved for Alternative 1: The Zoning Board of Adjustment can approve a one-year
extension of the Special Use Permit to allow a temporary yard waste processing facility at
400 and 220 Freel Drive, based on the findings of fact and conclusions stated herein, with
the following conditions: Seconded Zenor.
a. General operations on weekdays and weekends as described within the application
and up to five large event days.
b. Use of the site shall be consistent with the plan submitted as part of the Special Use
Permit approved on April 27, 2022.
c. The term of the use shall begin on May 1, 2023 and may continue for one year
through May 1, 2024. All yard waste material, equipment, and temporary
structures shall be removed from the site and the site restored to its current or
better condition within 60 days of the end of the permit.
5
d. No further extensions of the approved Special Use Permit shall be granted by the
Zoning Board of Adjustment. A new application for a Special Use Permit shall be
required for use of the site as a yard waste facility after May 1, 2024.
Roll Call: Schneider, aye; Patton, aye; Bowers, aye; Zenor, aye
Vote on Motion: _Motion declared carried unanimously
ADJOURNMENT: Moved by Schneider seconded by Bowers to adjourn the meeting at
6:49 p.m.
Vote on Motion: 4-0. Motion declared carried unanimously.
_____________________________ _____________________________
Natalie Rekemeyer, Recording Secretary Chad Schneider, Acting Chair