HomeMy WebLinkAbout~Master - Planning and Zoning Commission Minutes 05/17/20231
MINUTES OF THE CITY OF AMES PLANNING AND ZONING COMMISSION
AMES, IOWA MAY 17, 2023
The Regular Meeting of the Planning and Zoning Commission was called to order by
Chairperson Mike Sullivan at 7:02 p.m. on May 17, 2023 in the Council Chambers at 515
Clark Avenue. Commission Members present were Julie Winter, Mike Clayton, Mike
Sullivan, Jon Emery, Mike LaPietra, and Matthew Voss.
APPROVAL OF THE AGENDA
Moved by Emery, seconded by Clayton, to approve the Agenda for the meeting of May 17,
2023. Vote on Motion: 6-0. Motion passed.
APPROVAL OF THE MINUTES OF THE MAY 3, 2023 MEETING
Moved by Voss, seconded by LaPietra, to approve the Minutes of the May 3, 2023 meeting.
Vote on Motion: 6-0. Motion passed.
PUBLIC FORUM
Chairperson Sullivan opened the public forum and closed it when no one came forward to
speak.
PUBLIC HEARING ON A REZONING WITH MASTER PLAN FOR 4098 E. 13TH STREET
City Planner Justin Moore presented the staff report and stated the applicant was requesting
to rezone the property from Planned Industrial “PI” with the Northeast Gateway Overlay “O-
GNE” to General Industrial “GI” and remove the O-GNE overlay with a Master Plan. The site
was at one time the location of a proposed regional mall and the overlay was in place to
preserve options for design compatibility with that purpose. Mr. Moore said the request to
change to GI zoning is to allow for greater use of the site with the proposed building
allowance. The Master Plan proposal shows two large warehouse buildings and a future site
that will be divided off and have two small buildings on it. On the Master Plan, staff is
stipulating that the buildings on the larger lot remain for warehouse use and the smaller site
is restricted to industrial service and office use.
Mr. Moore said the site will be served with water that currently exists along East 13th Street
and sewer will be constructed later this year. Storm water detention will be provided on the
southwest side of the lot. The land north and east of the site is outside the City limits; a land
use analysis indicated the future land use for the land to the east is an employment
classification and the land to the north would be RN-4 which would allow for a mixture of
residential type uses.
Planning Director Kelly Diekmann stated Master Plans for commercial or industrial sites are
different than residential Master Plans in that some elements of a site plan are present and
2
they have a more detailed plan, however, it cannot be concluded that what is proposed is
the exact grading plan for the site; rather it is meant to show the intent of the layout, setbacks,
access points, and in general how the site is expected to develop.
Michael Sullivan asked staff to explain why the request to remove the O -GNE overlay was
acceptable in this situation. Mr. Moore said in this situation, staff felt the requirements placed
on the Master Plan addressed the spirit of the O-GNE with the design intent and given that
the property is already an industrial zone, taking it to another industrial zone was not seen
as a major issue. Mr. Moore added the O-GNE was meant to address the look and feel of a
shopping center.
Matthew Voss asked if the removal of the overlay was mainly for the use of the property. Mr.
Moore said the removal of the overlay would help the use somewhat, however, with the
intent of the overlay, staff did not see the necessity for it. Mr. Diekmann added by agreeing
to remove the overlay, the Commission would be facilitating the shown proposal. The
proposal could possibly be done under the overlay, but there would be many things done to
the buildings that are not normally required for this type of project.
Julie Winter asked about the 40 foot setback on the north side. Mr. Moore said proposed
landscaping and storm water treatment will be between the parking lot and the street, and
he added that the setback on the west side is 50 feet and the east side is a minimum of 175
feet. Ms. Winter asked if the landscaping requirement in the GI zone is 15%; Mr. Moore
confirmed 15% is the minimum requirement.
Mike LaPietra asked if the southwest corner of the site was the water detention area. Mr.
Moore confirmed it was the general location. Mr. LaPietra asked of the 15% of the site that
is not developed, how much of that would be retention. Mr. Moore said the 15% minimum
requirement must be green space or landscaped area, so if there is water in the detention
pond, the surface of the water would not count toward the minimum landscape area. Mr.
Diekmann added stormwater treatment features can count if they are dry, but not a wet
pond.
Mr. Emery asked if the O-GNE was planned for a one building site and if the new designation
is what allows multiple buildings. Mr. Moore replied the O-GNE is more about the full design
requirements for the previously proposed regional mall and the GI zoning is what allows the
buildings to be arranged on the site and utilize the site for more room for the buildings. Mr.
Diekmann added if the zoning stayed as PI, regardless of the overlay, there would be a 20%
open space requirement, and to achieve a more eff icient footprint, the developer would have
probably done one larger building. By having a little more square footage, they were willing
to break it into two buildings to divide up the site and address some of the massing issues
in the area.
Mr. Sullivan asked staff to speak to how the use fits under the employment category in the
Ames Plan 2040. Mr. Moore said the GI zoning district is intended for the employment
category and the uses of industrial, business and jobs are all compatible with it.
3
Ms. Winter asked if a traffic study had been done considering the potential residential use
on the north side. Mr. Moore said the applicant stated their use would generate 25 trucks
per day, which is acceptable.
John Gade with Fox Strand at 414 S. 17th Street addressed the Commission. He stated he
represented the developers, and they are very excited about the project and believe it will
fill a need for the community and local businesses that need storage. He said the request
for the rezoning is to allow the applicants to maximize the buildable footprint on the lot
instead of having to buy more land. They are agreeing to the conditions and requirements
of staff and the buildings will be architecturally attractive rather than just a big square
building. Mr. Gade added they have completed a traffic impact study which shows that no
turn lane improvements are needed along 13th Street, but at the City’s request, they will be
installing a 12 foot lane along the frontage of the property.
Chairperson Sullivan opened public comments.
Mark Gannon of 3613 Stagecoach Road stated he manages the land north of the proposed
development and said the owners of that land are considering voluntarily annexing it to the
City. He asked if road improvements were planned and, if so, would it affect them financially
by increasing their taxes. Mr. Gannon expressed concern about water drainage problems
from the north where water flows into a ditch and frequently goes over the road, and he
stressed that the impact to the surrounding properties should be taken into consideration.
Mr. Sullivan closed public comments when no one else came forward to speak.
Mr. Gade stated management of the water is paramount and they cannot cause detriment
to the neighbors. He said they will be adding a storm sewer along the East 13th Street right-
of-way and will be filling in the ditch that Mr. Gannon referred to and making it an urbanized
section with curb, gutter and storm sewer.
Mr. Diekmann said at this stage staff does not have the development details, and an actual
stormwater management plan will be included with the subdivision of the site which will spell
out the specifics of what quantities of water are being addressed and the methods they are
being treated and controlled.
Mr. Clayton asked Mr. Gade if the storm sewer being installed would address the water
concerns expressed by Mr. Gannon. Mr. Gade said it would, in addition to all the on-site
storm sewer improvements being done.
Moved by Winter, seconded by Clayton, to recommend that the City Council approve the
request to rezone the property located at 4098 East 13th Street from “PI” (Planned Industrial)
with the O-GNE (Northeast Gateway Overlay) to “GI” (General Industrial) with a Master Plan
removing the O-GNE (Northeast Gateway Overlay) with the following conditions:
A. Finalize Master Plan details generally consistent with Attachment D, limitations
described within the Addendum of this report, and to include building material and
façade design elements prior to City Council approval of the rezoning.