Loading...
HomeMy WebLinkAbout~Master - Change Order No. 1 on Contract with Woodruff Construction for Water Pollution Control Facility Nutrient Reduction Modifications Phase 1RESOLUTION NO. 24-674 RESOLUTION APPROVING CHANGE ORDER NO. 1 ON CONTRACT WITH WOODRUFF CONSTRUCTION, INC. FOR WATER POLLUTION CONTROL FACILITY NUTRIENT REDUCTION MODIFICATIONS PHASE 1 PROJECT FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 1 a deduction in the amount of ($231,878.79) on contract with Woodruff Construction, Inc., of Ames, Iowa, for the Water Pollution Control Facility Nutrient Reduction Modifications Phase 1 Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 17th day of December, 2024. _________________________________ ___________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Betcher Seconded by: Junck Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 17th day of December, 2024.