HomeMy WebLinkAbout~Master - Change Order No. 1 on Contract with Woodruff Construction for Water Pollution Control Facility Nutrient Reduction Modifications Phase 1RESOLUTION NO. 24-674
RESOLUTION APPROVING CHANGE ORDER NO. 1
ON CONTRACT WITH WOODRUFF CONSTRUCTION, INC.
FOR WATER POLLUTION CONTROL FACILITY NUTRIENT REDUCTION
MODIFICATIONS PHASE 1 PROJECT
FOR THE CITY OF AMES, IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 1 a deduction in the amount of ($231,878.79) on contract with Woodruff
Construction, Inc., of Ames, Iowa, for the Water Pollution Control Facility Nutrient Reduction
Modifications Phase 1 Project be approved and adopted as attached hereto and made a part hereof
by this reference.
ADOPTED THIS 17th day of December, 2024.
_________________________________ ___________________________________
Renee Hall, City Clerk John A. Haila, Mayor
Introduced by: Betcher
Seconded by: Junck
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 17th day of December, 2024.