Loading...
HomeMy WebLinkAbout~Master - Change Order No. 2 on Contract with Con-Struct Inc. for 2021/22 Stormwater Erosion Control (Bloomington Waterway)RESOLUTION NO. 24-563 RESOLUTION APPROVING CHANGE ORDER NO. 2 ON CONTRACT WITH CON-STRUCT INC., OF AMES, IOWA FOR 2021/22 STORMWATER EROSION CONTROL (BLOOMINGTON WATERWAY) FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 2 in the amount of –($44,866) on contract with Con-Struct, Inc., of Ames, Iowa, for the 2021/22 Stormwater Erosion Control (Bloomington Waterway) be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 22nd day of October, 2024. _________________________________ ___________________________________ Renee Hall, City Clerk John A. Haila, Mayor Introduced by: Betcher Seconded by: Beatty-Hansen Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 22nd day of October, 2024.