HomeMy WebLinkAbout~Master - Change Order No. 2 on Contract with Con-Struct Inc. for 2021/22 Stormwater Erosion Control (Bloomington Waterway)RESOLUTION NO. 24-563
RESOLUTION APPROVING CHANGE ORDER NO. 2
ON CONTRACT WITH CON-STRUCT INC., OF AMES, IOWA
FOR 2021/22 STORMWATER EROSION CONTROL (BLOOMINGTON WATERWAY)
FOR THE CITY OF AMES, IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 2 in the amount of –($44,866) on contract with Con-Struct, Inc., of Ames,
Iowa, for the 2021/22 Stormwater Erosion Control (Bloomington Waterway) be approved and
adopted as attached hereto and made a part hereof by this reference.
ADOPTED THIS 22nd day of October, 2024.
_________________________________ ___________________________________
Renee Hall, City Clerk John A. Haila, Mayor
Introduced by: Betcher
Seconded by: Beatty-Hansen
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 22nd day of October, 2024.