HomeMy WebLinkAbout~Master - Change Order No. 1 on Contract for 2021/22 Concrete Pavement Improvements (24th Street and Stange Road) RESOLUTION NO. 24-485
RESOLUTION APPROVING CHANGE ORDER NO. 1
ON CONTRACT WITH CON-STRUCT, INC., OF AMES,IOWA
FOR 2021/22 CONCRETE PAVEMENT IMPROVEMENTS
(24TH STREET AND STANGE ROAD)
FOR THE CITY OF AMES,IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 1 in the amount of$124,614 on contract with Con-Struct, Inc., of Ames,
Iowa, for the 2021/22 Concrete Pavement Improvements (24th Street and Stange Road) be
approved and adopted as attached hereto and made a part hereof by this reference.
ADOPTED THIS loth day of September, 2024.
Renee kall, City Clerk John A. Haila, Mayor
Introduced by: Betcher
Seconded by: Rollins
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this loth day of September, 2024.