HomeMy WebLinkAbout~Master - Completion of WPC Facility Caterpillar G379 Methane/Natural Gas Engine Generator Overhaul Project RESOLUTION NO. 24-407
RESOLUTION ACCEPTING COMPLETION OF
WPC FACILITY CATERPILLAR G379 METHANE/NATURAL GAS
ENGINE GENERATOR OVERHAUL PROJECT
FOR THE CITY OF AMES,IOWA
WHEREAS, the Water and Pollution Control Department has filed a certificate of
completion for the WPC Facility Caterpillar G379 Methane/Natural Gas Engine Generator
Overhaul Project for the City of Ames, Iowa, in accordance with a contract dated 12th day of
December, 2023, by and between the City of Ames, Iowa, and Altorfer Power Systems of Cedar
Rapids, Iowa.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council of the City of
Ames, Iowa, as follows:
Section 1. The total contract for the WPC Facility Caterpillar G379 Methane/Natural
Gas Engine Generator Overhaul Project has been fully completed by the Contractor in
accordance with the terms of the contract and is hereby accepted and approved.
Section 2. The total cost of the contract is $178,130.05.
Section 3. The amount due Altorfer Power Systems of Cedar Rapids, Iowa, is hereby
ordered paid as provided by law.
Section 4. All resolutions or orders or parts thereof in conflict herewith are hereby
repealed to the extent of such conflict.
ADOPTED THIS 9th day of July, 2024.
�5w-
Renee kall, City Clerk John A. Haila, Mayor
Introduced by: Betcher
Seconded by: Junck
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 91h day of July, 2024.