HomeMy WebLinkAbout~Master - Change Order No. 6 for 2023 CyRide Shop Rehabilitation Project RESOLUTION NO. 24-295
RESOLUTION APPROVING CHANGE ORDER NO. 6
ON CONTRACT WITH R.H. GRABAU CONSTRUCTION, INC. OF BOONE,IOWA
FOR 2023 CYRIDE SHOP REHABILITATION PROJECT
FOR THE CITY OF AMES,IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 6 in the amount of$48,482.07 on contract with R.H. Grabau Construction,
Inc. of Boone, Iowa, for the 2023 CyRide Shop Rehabilitation Project be approved and adopted as
attached hereto and made a part hereof by this reference.
ADOPTED THIS 28th day of May, 2024.
Renee kall, City Clerk John A. Haila, Mayor
Introduced by: Beatty-Hansen
Seconded by: Junck
Voting aye: Beatty-Hansen, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: Betcher
Resolution declared adopted and signed by the Mayor this 281h day of May, 2024.