Loading...
HomeMy WebLinkAbout~Master - Change Order No. 2 Contract with Flowserve Corporation for Unit 7 Boiler Feedwater Pump No. 2 Inspection and Repair RESOLUTION NO. 24-144 RESOLUTION APPROVING CHANGE ORDER NO. 2 ON CONTRACT WITH FLOWSERVE CORPORATION FOR UNIT 7 BOILER FEEDWATER PUMP NO. 2 INSPECTION AND REPAIR PROJECT FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 2 in the amount of$60,000 on contract Flowserve Corporation of Chicago, Illinois, for Unit 7 Boiler Feedwater Pump No. 2 Inspection and Repair Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 26th day of March, 2024. Renee kall, City Clerk John A. Haila, Mayor Introduced by: Corrieri Seconded by: Betcher Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Rollins Voting nay: None Absent: Junck Resolution declared adopted and signed by the Mayor this 261h day of March, 2024.