Loading...
HomeMy WebLinkAbout~Master - Change Order No. 1 on Contract for Unit 7 Boiler Feedwater Pump No. 2 Inspection and Repair RESOLUTION NO. 23-620 RESOLUTION APPROVING CHANGE ORDER NO. 1 ON CONTRACT WITH FLOWSERVE CORPORATION FOR UNIT 7 BOILER FEEDWATER PUMP NO. 2 INSPECTION AND REPAIR FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 1 in the amount of$178,185.97 on contract with Flowserve Corporation of Chicago, Illinois, for the Unit 7 Boiler Feedwater Pump No. 2 Inspection and Repair Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 12th day of December, 2023. Renee kall, City Clerk John A. Haila, Mayor Introduced by: Betcher Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 121h day of December, 2023.