HomeMy WebLinkAbout~Master - Change Order No. 1 on Contract for Unit 7 Boiler Feedwater Pump No. 2 Inspection and Repair RESOLUTION NO. 23-620
RESOLUTION APPROVING CHANGE ORDER NO. 1
ON CONTRACT WITH FLOWSERVE CORPORATION
FOR UNIT 7 BOILER FEEDWATER PUMP NO. 2 INSPECTION AND REPAIR
FOR THE CITY OF AMES,IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 1 in the amount of$178,185.97 on contract with Flowserve Corporation of
Chicago, Illinois, for the Unit 7 Boiler Feedwater Pump No. 2 Inspection and Repair Project be
approved and adopted as attached hereto and made a part hereof by this reference.
ADOPTED THIS 12th day of December, 2023.
Renee kall, City Clerk John A. Haila, Mayor
Introduced by: Betcher
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 121h day of December, 2023.