HomeMy WebLinkAbout~Master - Major Site Development Plan for 3600 University Boulevard RESOLUTION NO. 23-593
RESOLUTION APPROVING MAJOR SITE DEVELOPMENT PLAN
FOR 3600 UNIVERSITY BOULEVARD
FOR THE CITY OF AMES,IOWA
WHEREAS, this particular property will use the flexibility of the Integrated Site Plan to
share parking, to reduce setbacks, and to place the two buildings on separate lots but with a
physical connection. Approval of an Integrated Site Plan allows for more flexible application of
most development standards through the approval of the Major Site Development Plan, although
the overall site must meet all minimum standards; and,
WHEREAS, the subject site totals 5.93 acres and the proposed subdivision includes two
lots. The combined site will maintain its access from both Collaboration Place and University
Boulevard; no new driveway access is proposed; and,
WHEREAS, the new use, indoor playground facility, complements the existing fitness
center and that of the nearby commercial and residential areas. With the condition of approval, the
project meets the design principles of an Integrated Site Plan as well as subdivision standards; and,
WHEREAS, the Major Site Development Plan accounts for all building configurations,
uses, and features of the site layout along with front yard landscaping requirements along
University Boulevard.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Major Site Development Plan, subject to compliance with the City's Outdoor Lighting Code,
is hereby approved.
ADOPTED THIS 14th day of November, 2023.
e4w- 4�1,o 4��
Renee kall, City Clerk John A. Haila, Mayor
Introduced by: Beatty-Hansen
Seconded by: Junck
Voting aye: Beatty-Hansen, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: Betcher
Resolution declared adopted and signed by the Mayor this 141h day of November, 2023.