HomeMy WebLinkAbout~Master - Contract for Engineering Services to Design Standby Generation at Power Plant RESOLUTION NO. 23-561 RESOLUTION AWARDING CONTRACT FOR ENGINEERING SERVICES TO DESIGN STANDBY GENERATION AT THE POWER PLANT FOR THE CITY OF AMES,IOWA WHEREAS, there are two battery banks within the Power Plant responsible for powering controls systems and emergency oil pumps for critical systems such as hydrogen seals and turbine bearings. The battery banks can provide a limited window of power during loss of internal generation or grid power. A backup or standby generator can provide power to these critical systems if power is lost, similar to what happened during the 2020 derecho. This contract is to provide engineering services to design standby generation for the Ames Power Plant; and, WHEREAS, on the 17th day of July, 2023, a Request for Proposals was posted to AmesBids. On the 23rd day of August, 2023, the Purchasing Division received three proposals. After evaluating the proposals, staff determined that the proposal from Farris Engineering of Omaha, Nebraska, demonstrated the best project understanding and presented the best qualified professionals for this project. WHEREAS, the approved FY 2023/24 Capital Improvements Plan includes $200,000 for engineering for the project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that award of contract to Farris Engineering,Omaha,Nebraska,for Engineering Services to Design Standby Generation at the Power Plant in an amount not to exceed $100,118 is hereby approved. ADOPTED THIS 24th day of October, 2023. Renee Nall, City Clerk John A. Haila, Mayor Introduced by: Beatty-Hansen Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 24th day of October, 2023.